roofy

4079 Broadway

Manhattan, NY 10032BBL 1-02142-0100Map

Owner of record: Mrs Realty LLC

4079 Broadway is an elevator apartment building built in 1924 in Manhattan, 10032. It has 54 residential units across 6 floors. The owner of record is Mrs Realty LLC. HPD has recorded 381 housing violations here, most recently on May 17, 2026. 11 of the 50 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.

HPD violations
381
DOB violations
35
ECB violations
47
HPD complaints
606

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
42
About 78% of the building's 54 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 381

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 45fort, 4th story, 3rd apartment from east at south

    May 17, 2026 · Apt 45FORT

    Open — Nov certified late
  • A

    Trace and repair the source and abate the visible mold condition... 10 sqft at west wall, and at ceiling in the bathroom located at apt 45fort, 4th story, 3rd apartment from east at south

    May 17, 2026 · Apt 45FORT

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt 45fort, 4th story, 3rd apartment from east at south

    May 17, 2026 · Apt 45FORT

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 45fort, 4th story, 3rd apartment from east at south

    May 17, 2026 · Apt 45FORT

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, west wall in the bathroom located at apt 45fort, 4th story, 3rd apartment from east at south

    May 17, 2026 · Apt 45FORT

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 45, 4th story, 3rd apartment from east at south

    Mar 10, 2026 · Apt 45

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 45, 4th story, 3rd apartment from east at south

    Mar 10, 2026 · Apt 45

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the 1st room from north located at apt 45, 4th story, 3rd apartment from east at south

    Mar 10, 2026 · Apt 45

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 45, 4th story, 3rd apartment from east at south

    Mar 10, 2026 · Apt 45

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from north at east wall ceiling, 1st closet from north at east wall ceiling, 1st closet from north at east wall wall in the 5th room from north located at apt 45, 4th story, 3rd apartment from east at south

    Mar 10, 2026 · Apt 45

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 45, 4th story, 3rd apartment from east at south

    Mar 10, 2026 · Apt 45

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from east at south wall in the 5th room from north located at apt 45, 4th story, 3rd apartment from east at south

    Mar 10, 2026 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall in the 3rd room from north located at apt 45, 4th story, 3rd apartment from east at south

    Mar 10, 2026 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Feb 26, 2026 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Feb 26, 2026 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Feb 26, 2026 · Apt 45

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective broken glass pane at door in the vestibule , 4th story

    Jan 30, 2026

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at basement

    Dec 11, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 24, 3rd story, 2nd apartment from east at south

    Dec 11, 2025 · Apt 24

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 22, 3rd story, 1st apartment from north at east

    Dec 11, 2025 · Apt 22

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 22, 3rd story, 1st apartment from north at east

    Dec 11, 2025 · Apt 22

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall shelf in the foyer located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from north at east wall wall in the foyer located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 3rd private hallway from north located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective electrical outlet at west wall in the 5th room from north located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall ceiling in the foyer located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 3rd room from north located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st dumb waiter from south at west wall, east wall in the 2nd private hallway from north located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 1st room from north located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from south at west wall wall in the 1st room from north located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 47, 4th story, 1st apartment from east at south

    Nov 30, 2025 · Apt 47

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Nov 30, 2025

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation dismissed
  • A

    Repair the leaky and/or defective faucets and shower head at bathtub in the bathroom located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Open — Notice of issuance sent to tenant
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the entrance located at apt 45, 4th story, 1st apartment from west at north

    Nov 30, 2025 · Apt 45

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st door frame from east at south wall, north wall, south wall, 1st window frame from north at east wall in the 1st room from north located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 2nd window frame from north at east wall in the kitchen located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd private hallway located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from north at east wall in the 3rd room from north located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the 3rd private hallway located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 5th room from north located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective silicone caulk at tiles around bathtub in the bathroom located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt 45, 4th story, 1st apartment from west at north , section ''east''

    Aug 28, 2025 · Apt 45

    Closed — Violation dismissed

DOB building violations · 35

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
Show 25 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 14, 2017

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 9, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2013

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 22, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Feb 12, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 18, 2012

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 23, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 19, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 2, 2008

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Jun 25, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2004

    Dob violation - resolved
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Apr 1, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p12990

    Nov 24, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    1p12990

    Apr 7, 1999

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatorrequired

    (03) capacity plate (30) walls (74) top of car

    May 14, 1990

    Dob violation - resolved

ECB violations · 47

  • Class - 1

    C/u items: 1) door zone restrictor inoperative, creating a hazardous condition per 1rcny11-02. remedy: restore to service immediatley and e-mail the elevator division at [email protected] for a re-inspectio

    Jun 5, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to file acceptable amended cycle 8c, 9c, and 10c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #1007196. remedy: file acceptable

    Apr 20, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to obtain permit for sidewalk shed at exposure 1&4 prior the installation in contrary with article 105-permits, 28-105.1 general. it is unlawful to construct, erect, install, repair, or use or operate a

    Nov 28, 2025 · Penalty $6,250

    Active
  • Class - 2

    At time of inspection of 6 story building observed sidewalk shed in place not maintained per code causing hazardous conditions 1. lighting permit not valid as per 3307.6.4.8 -2. bracing not secure as per 3307.6

    Oct 27, 2025 · Penalty $2,400

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place without permit causing hazardous conditions

    Oct 27, 2025 · Penalty $1,250

    Active
  • Class - 1

    Failure to provide adequate safety measures such as sidewalk sheds fordocumented unsafe facade.noted:as per unsafe notification filing unsafe-1007196-10c-001 sidewalk was to be installed onsite.however,it was o

    Aug 26, 2025 · Penalty $10,000

    Active
  • Class - 1

    Failure to provide unobstructed exit passageway.noted:observed objectsat fire escapes at multiple locations.located at exp 1(s.elev)and exp 2(w.elev),objects observed are clothing,flower pots,and cans of paint.

    Aug 26, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place partially without permit causing hazardous conditions.

    Jun 20, 2025 · Penalty $6,250

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907196. agg1: prior nov 3702278

    Apr 8, 2025 · Penalty $6,250

    Active
  • Class - 1

    Cease use: door zone restrictor has been defeated. this safety device prevents the cab door from opening in between floors which is dangerous for passengers inside of the elevator. re-inspection required. other

    Aug 20, 2024 · Penalty $1,250

    Resolve
Show 37 more ↓
  • Class - 2

    I observed mounted outside the supermarket/butcher shop new installation of three illuminated signs (pera produce &meat market) no application on file with d.o.b., obtain permit

    Jul 3, 2024 · Penalty $400

    Resolve
  • Class - 2

    Illegal use in a commercial district. unlicensed physical treatment establishment, a prohibited use as per zr 12-10, operating in a c1-4 district on ground level as "chinese qi gong tui na". noted an individual

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the dept. of buildings records. illegal occupancy noted: at ground floor, store on 4089, has been converted/occupied as massage parlor "chineseqi gong tui na". with 4 massa

    Apr 11, 2024

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#807196.agg1 prior nov#37018750p under 2

    Oct 19, 2022 · Penalty $3,125

    Active
  • Class - 1

    No door lock monitoring in controller as mandated in 3.10.12 of appendix k of 2014 building codes. remedy: install dlm,file and perform test with nyc dob

    May 24, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit a required cycle 8c report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#807196. remedy: submit acceptable required technica

    Feb 13, 2020 · Penalty $1,250

    Active
  • Class - 2

    Failure to safeguard all persons and property affected by construction operations: noted: observed in apartment 23 nails protruding through the floor. construction work is ongoing at ground level under permit #

    Jun 1, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35244124k issued on 05/17/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit:no

    Oct 16, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/vio # 35244124k issued on 05/17/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for work w/o permit @ cella

    Aug 31, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35244124k issued on 05/17/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without permit.firs

    Jul 25, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Wokr w/o a permit in that at 1st fl commercial space,new ceiling framed out w/2x4 lumber w/sheetrock attached to it,also electrical work being performed store front removed. remedy: stop all work. obtain approv

    May 17, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain exterior bldg facade.note:exp #1, south elevation:damaged coping stone above main entrance (ii)exp#2, west elevation:deteroiorated mortar joints, damaged window sill &masonry step cracks.(ii

    Dec 20, 2016 · Penalty $200

    Active
  • Class - 2

    B254,43,16,50a,b,c,d,e,f. 50a- manhole cover leaking. 50b- drain valveleaking. 50c- control cover missing. 50d- hot water relief valve on coil missing. 50e- hot water pipes from coil corroded and leaking. 50f

    Oct 22, 2013 · Penalty $2,500

    Resolve
  • Class - 2

    B254,4a,19b,16,32a,b,50a. 50a- boiler room not a storage room.

    Oct 22, 2013 · Penalty $2,500

    Resolve
  • Class - 1

    *failure to take and provide safety measures (sidewalk shed,netting) where required to protect and secure public safety from unsafe facade as per 1 rcny 103-04. *facade technical report file unsafe by pe/ra 2/

    Feb 21, 2013 · Penalty $12,000

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98report.36007399r.rem:file an amended report following remedial

    Jun 11, 2010 · Penalty $8,000

    Resolve
  • Class - 2

    Work w/o a permit work noted: basement creating 2 sro apt at n/e sheet rock walls in apt at n/e all 4 walls. remedy: obtain a permit or restore to prior.

    Oct 23, 2009

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the c of o co#621301965 noted: basement 2 (sao) apt with at entrance door at n/e & ne. ne no 2nd(meansof egress). remedy: discontinue illegal use and/or amend c of o.

    Oct 23, 2009

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local 11/98 report. remedy: file an amended report following remedial repairs

    Jan 9, 2009 · Penalty $4,000

    Resolve
  • Class - 2

    08u01,02x10,60m07,100l10,98bb05,100bb05,71m07,70o02,39o02. 08u01 flr stops not level need to be adjusted. 02x10 alarm bell not working repair 60m07 provide guardrails for machine room lights. 100l10 main line

    Dec 17, 2008

    Resolve
  • Class - 2

    Following the receipt of a permit to erect a sidewalk shed. the permit holder shall post a readily visible sign on the sidewalk shed,such sign shall include 1.name/address #,2.permit #,3.expiration date(no sign

    Dec 5, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to file an amended 6th round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedia

    May 9, 2008 · Penalty $700

    Resolve
  • Non-hazardous

    83x10. 83-x-10-return to full service to be inspected by a d.o.b. elevator inspector

    Jun 29, 2005 · Penalty $180

    Resolve
  • Non-hazardous

    73u07/ 37b07/ 20b10/ 08v01/ 73 - use correct city i.d. number 37 - provide door open ( hold time between calls 20 provide missing hall dir lts on top floors 08 - adj. floor stops

    Jul 2, 2002

    Resolve
  • Hazardous

    Failure to file an ammended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5),indicating correction of hazardous conditions described in initial ll11/98report remedy file an am

    May 3, 2002 · Penalty $400

    Resolve
  • Non-hazardous

    Interior stairs. noted: the interior stair approx. 10'-6" wide constructed with no guard rails on bath sides of stairs (2) stair more than eighty eight inches wide shall have intermediate halls devidins the sta

    Jul 31, 2001

    Resolve
  • Non-hazardous

    35l11/ 10i10/ 15b09/ second offence 03b07/ 40f11/ 37l12/ 28h11/ 73l11/ 35- repaire car der to m. r. 10- renew car buttons with numbers (floor) remove base button id all 5 wights 15- remove knob from in side lob

    Jul 11, 2001 · Penalty $180

    Resolve
  • Non-hazardous

    8v1, 11q3, 2l11, 15l11, 22y2, 25q3, 50y11, 50y2, 73u16, 2l11-alarm button 15l11-3rd fl slams 22y2-car top 73u16-incorrect city id tag 26022 correct #151p12990.

    Jun 21, 2001

    Resolve
  • Non-hazardous

    74 a 07, 35 d 11, 17 i 12, 20 b 11, 15 d 09, 10 i 10, 74-cornect capacity is 2500 35-repair m.r. door + ladder 17-replace vision wire class on 3,5 20-repair hall button dir.lights on all floors 15- remove knob

    May 29, 2001 · Penalty $350

    Resolve
  • Non-hazardous

    18q3 50y14 50y2 51f11 39h12 9k12 3k11 74h12 74l11 57o2 3rusted cab door.(74)worn saddle (74)repair skylight.

    Sep 6, 2000 · Penalty $180

    Resolve
  • Non-hazardous

    73u16,38m12,37g10,75u5,8j1,57o2,3o2,25o2,36w6.

    Nov 15, 1997

    Resolve
  • Unknown

    03i,47h,35o,74o. repair or renew cab interior

    Feb 22, 1996

    Resolve
  • Non-hazardous

    15m, 3m, 63h, 30i, 74y, 40t, 46q, 62m, 50y. 15-floor number. 3-capa-city plate. 30-wall. 74-top car. 40-data plate. 62-toe guard.

    Mar 1, 1995 · Penalty $100

    Resolve
  • Hazardous

    3m,14m,30i,58d,35p, 3 capacity plate 14 card 30 wall & cease use until rail are secured. call 312-8730 before returning to service

    Apr 29, 1994 · Penalty $500

    Resolve
  • Non-hazardous

    14m,3m,63h,60m,30i,74y,40t,39h,17i,54l,46q,36w,37g,62m. 14 card 3 capacity plate 60 cwt 30 wall 74 oily rag top car 40 data plate. 17 glass 62 toe guard.

    Jul 19, 1993 · Penalty $200

    Resolve
  • Non-hazardous

    3i,17i,14m,3m,63h,60m,30i,74y,53l,31r,40h,40t,50y,39h,35d, 17 car glass 3b capacity plate 60 cwt 30 wall 74 oily ray top car 31 from light in motor going down side of building 40 data plate 35 ladder

    Oct 27, 1992

    Resolve
  • Non-hazardous

    35p,40p,33p,03o,57o

    Feb 27, 1991 · Penalty $150

    Resolve

Complaints

  • Paint/plaster

    Radiator

    Apr 16, 2026 · Apt 45FORT

    Close
  • Paint/plaster

    Door/frame

    Mar 5, 2026 · Apt 45

    Close
  • Water leak

    Damp spot

    Mar 5, 2026 · Apt 45

    Close
  • Paint/plaster

    Wall

    Mar 5, 2026 · Apt 45

    Close
  • Paint/plaster

    Wall

    Mar 5, 2026 · Apt 45

    Close
  • Paint/plaster

    Wall

    Feb 28, 2026 · Apt 45

    Close
  • Paint/plaster

    Wall

    Feb 28, 2026 · Apt 45

    Close
  • Door/window

    Window frame

    Feb 28, 2026 · Apt 45

    Close
  • Paint/plaster

    Wall

    Feb 28, 2026 · Apt 45

    Close
  • Door/window

    Window pane

    Feb 10, 2026 · Apt 45

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Feb 10, 2026 · Apt 45

    Close
  • Appliance

    Refrigerator

    Feb 10, 2026 · Apt 44

    Close
  • Plumbing

    Toilet

    Feb 10, 2026 · Apt 44

    Close
  • Electric

    Outlet/switch

    Feb 10, 2026 · Apt 44

    Close
  • Safety

    Window guard broken/missing

    Feb 10, 2026 · Apt 45

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 61

    Close
  • Paint/plaster

    Wall

    Jan 25, 2026 · Apt 45

    Close
  • Door/window

    Window frame

    Jan 25, 2026 · Apt 45

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2025 · Apt 22

    Close
  • Heat/hot water

    Apartment only

    Dec 8, 2025 · Apt 22

    Close
  • Heat/hot water

    Apartment only

    Dec 3, 2025 · Apt 44

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2025 · Apt 44

    Close
  • Plumbing

    Basin/sink

    Nov 29, 2025 · Apt 44

    Close
  • Plumbing

    Toilet

    Nov 29, 2025 · Apt 44

    Close
  • Heat/hot water

    Entire building

    Nov 29, 2025 · Apt 44

    Close
  • Flooring/stairs

    Floor

    Nov 26, 2025 · Apt 45

    Close
  • Paint/plaster

    Ceiling

    Nov 26, 2025 · Apt 45

    Close
  • Paint/plaster

    Wall

    Nov 26, 2025 · Apt 45

    Close
  • Unsanitary condition

    Mold

    Nov 26, 2025 · Apt 45

    Close
  • Door/window

    Window frame

    Nov 26, 2025 · Apt 45

    Close
  • Paint/plaster

    Wall

    Nov 26, 2025 · Apt 45

    Close
  • Paint/plaster

    Wall

    Nov 26, 2025 · Apt 45

    Close
  • Unsanitary condition

    Pests

    Nov 26, 2025 · Apt 45

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2025 · Apt 64

    Close
  • General

    Signage missing

    Nov 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 11, 2025 · Apt 44

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2025 · Apt 45

    Close
  • Water leak

    Heavy flow

    Apr 15, 2025 · Apt 62

    Close
  • Unsanitary condition

    Mold

    Apr 15, 2025 · Apt 62

    Close
  • General

    Signage missing

    Apr 4, 2025 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Apr 4, 2025 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Mar 31, 2025 · Apt 62

    Close
  • Unsanitary condition

    Mold

    Mar 30, 2025 · Apt 63

    Close
  • Water leak

    Heavy flow

    Mar 17, 2025 · Apt 62

    Close
  • Water leak

    Heavy flow

    Mar 6, 2025 · Apt 62

    Close
  • Flooring/stairs

    Floor

    Mar 6, 2025 · Apt 62

    Close
  • General

    Bell/buzzer/intercom

    Mar 6, 2025 · Apt 62

    Close
  • Water leak

    Damp spot

    Mar 6, 2025 · Apt 63

    Close
  • Water leak

    Slow leak

    Mar 5, 2025 · Apt 63

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
1924
Floors
6
Residential units
54
Building area
64,816 ft²
Lot area
13,822 ft²
Zoning
R8
Community board
112
Council district
10
Block / lot
2142 / 100
Assessed value
$3,318,750
Landmark / historic district
No

HPD registration #109035, last renewed Aug 20, 2025.

Questions about 4079 Broadway

Who owns 4079 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is Mrs Realty LLC.

Does 4079 Broadway have violations?

Yes. NYC HPD has recorded 381 housing violations at this property.

Is 4079 Broadway rent stabilized?

NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 78% of its 54 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 4079 Broadway built?

City records list 1924 as the year it was built.

How many apartments are in 4079 Broadway?

It has 54 residential units and 62 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.