623 West 170 Street
Manhattan, NY 10032BBL 1-02142-0012Map
Owner of record: Heights 170 Property Owner LLC
623 West 170 Street is a walk-up apartment building built in 1917 in Manhattan, 10032. It has 33 residential units across 5 floors. The owner of record is Heights 170 Property Owner LLC. HPD has recorded 143 housing violations here, most recently on August 22, 2026. 18 of the 50 most recent violations are still open. City tax records listed 21 rent-stabilized apartments here in 2024.
- HPD violations
- 143
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 136
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 143
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household storage at balcony at 2nd story 2nd from west at front at fire escape
Aug 22, 2026
Open — Nov certified on time - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
May 11, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the private hallway located at apt 4e, 4th story, 2nd apartment from west at north
May 11, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt 4e, 4th story, 2nd apartment from west at north
May 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
May 11, 2026 · Apt 4E
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective wood cabinet at wash basin in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
May 11, 2026 · Apt 4E
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
May 11, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Mar 4, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Mar 4, 2026 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Mar 4, 2026 · Apt 4E
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective floor base cabinet at wash/basin in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Mar 4, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in clogged waste line at bathtub in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Dec 29, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 1st apartment from west at north
Dec 29, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 1st room from north located at apt 4e, 4th story, 1st apartment from west at north
Dec 29, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 1st room from north located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door frame from west at north wall, north wall, south wall, east wall, west wall, 1st window frame from north at east wall in the kitchen located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall, north wall in the 3rd room from north located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door frame from west at north wall, 1st window frame from north at east wall in the 3rd room from north located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st closet from south at west wall door frame, 1st door frame from north at east wall in the foyer located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the 1st room from north located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the kitchen located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door knob in the 1st room from north located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in bathtub waste line in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective escutcheon plate at heat riser at ceiling in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of sliding bolt, capable to accept padlock installed at entrance door in the foyer located at apt 4e, 4th story, 2nd apartment from west at north
Dec 24, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective cement floor at west section at public hall, 5th story
Dec 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from west at north
Nov 19, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Oct 22, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north
Oct 22, 2025 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a, 1st story, 1st apartment from south at west
Oct 15, 2025 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 25, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at west fire door at public hall, 5th story
Jun 25, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding maximum temperature 130 degrees at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south , section ''east''
Jan 19, 2025 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 4b, 4th story, 1st apartment from east at south
Dec 30, 2024 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from south at west wall, east wall, west wall in the kitchen located at apt 4b, 4th story, 1st apartment from east at south
Dec 30, 2024 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st closet from north at east wall door frame, east wall in the private hallway located at apt 4b, 4th story, 1st apartment from east at south
Dec 30, 2024 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall, west wall in the 2nd room from north at east located at apt 4b, 4th story, 1st apartment from east at south
Dec 30, 2024 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall, west wall in the 2nd room from north at west located at apt 4b, 4th story, 1st apartment from east at south
Dec 30, 2024 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from south at west wall, east wall in the bathroom located at apt 4b, 4th story, 1st apartment from east at south
Dec 30, 2024 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door frame from west at north wall, east wall, west wall in the foyer located at apt 4b, 4th story, 1st apartment from east at south
Dec 30, 2024 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4b, 4th story, 1st apartment from east at south
Dec 27, 2024 · Apt 4B
Closed — Violation closed
DOB building violations · 4
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to maintain building in code-complaint manner. noted, apt # 1a interior instate of disrepair conditions with cracks on wall & ceiling throughout. also observed various cracks on lobby floor & wall by th
May 9, 2024
Resolve - Class - 2
Found defective blowdown valve, discharge pipes on safety relief valve not properly supported, flue pipe not properly supported, shut off valve on oil supply line missing at tank, body drains missing on safety
May 11, 2022 · Penalty $3,125
Active - Class - 2
Failure to maintain building noted: section of masonry window ledge 20"x 6" x 6" from apartment 3e dislodged and fallen onto easement walkway.also observed spalling of mortar joints throughout. rmdy: repair
Oct 2, 2015 · Penalty $500
Active
Complaints
- Heat/hot water
Entire building
Aug 22, 2026 · Apt BLDG
Close - Door/window
Door
Jun 23, 2026 · Apt 4B
Close - General
Bell/buzzer/intercom
Jun 23, 2026 · Apt 4B
Close - Appliance
Electric/gas range
May 7, 2026 · Apt 4B
Close - Appliance
Refrigerator
May 7, 2026 · Apt 4B
Close - Unsanitary condition
Mold
May 2, 2026 · Apt 4E
Close - Plumbing
Basin/sink
May 2, 2026 · Apt 4E
Close - Heat/hot water
Entire building
May 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 24, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Dec 23, 2025 · Apt 4E
Close - Electric
Wiring
Dec 23, 2025 · Apt 4E
Close - Electric
Outlet/switch
Dec 23, 2025 · Apt 4E
Close - Plumbing
Bathtub/shower
Dec 23, 2025 · Apt 4E
Close - General
Cabinet
Dec 23, 2025 · Apt 4E
Close - Paint/plaster
Ceiling
Dec 23, 2025 · Apt 4E
Close - Door/window
Door
Dec 23, 2025 · Apt 4E
Close - Plumbing
Steam pipe/riser
Dec 23, 2025 · Apt 4E
Close - Door/window
Door
Dec 23, 2025 · Apt 4E
Close - Unsanitary condition
Mold
Dec 23, 2025 · Apt 4E
Close - Unsanitary condition
Pests
Dec 23, 2025 · Apt 4E
Close - Paint/plaster
Wall
Dec 23, 2025 · Apt 4E
Close - Electric
No lighting
Dec 23, 2025 · Apt 4E
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 22, 2025 · Apt 1F
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Jun 25, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Feb 12, 2025 · Apt 4B
Close - Unsanitary condition
Pests
Feb 12, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 14, 2025 · Apt 4C
Close - Heat/hot water
Apartment only
Jan 13, 2025 · Apt 4C
Close - Plumbing
Water supply
Jan 13, 2025 · Apt 4C
Close - Heat/hot water
Entire building
Jan 9, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 4B
Close - Paint/plaster
Wall
Jan 8, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Jan 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1917
- Floors
- 5
- Residential units
- 33
- Building area
- 30,020 ft²
- Lot area
- 8,292 ft²
- Zoning
- R8
- Community board
- 112
- Council district
- 10
- Block / lot
- 2142 / 12
- Assessed value
- $1,422,450
- Landmark / historic district
- No
HPD registration #106208, last renewed Jun 23, 2025.
Questions about 623 West 170 Street
Who owns 623 West 170 Street?
The owner of record in NYC Department of City Planning PLUTO data is Heights 170 Property Owner LLC.
Does 623 West 170 Street have violations?
Yes. NYC HPD has recorded 143 housing violations at this property.
Is 623 West 170 Street rent stabilized?
NYC Department of Finance tax bills listed 21 rent-stabilized units here in 2024 (about 64% of its 33 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 623 West 170 Street built?
City records list 1917 as the year it was built.
How many apartments are in 623 West 170 Street?
It has 33 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.