70 Haven Avenue
Manhattan, NY 10032BBL 1-02139-0214Map
Owner of record: Haven Equities INC
70 Haven Avenue is an elevator apartment building built in 1925 in Manhattan, 10032. It has 54 residential units across 6 floors. The owner of record is Haven Equities INC. HPD has recorded 125 housing violations here, most recently on September 4, 2026. 18 of the 50 most recent violations are still open.
- HPD violations
- 125
- DOB violations
- 9
- ECB violations
- 6
- HPD complaints
- 19
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 125
- BHazardous
Repair the leaky and/or defective water supply pipe at hot water shut off valve of wash/basin in the bathroom located at apt 4g, 4th story, 2nd apartment from west at north
Sep 4, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at wash/basin in the bathroom located at apt 4g, 4th story, 2nd apartment from west at north
Sep 4, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Aug 30, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east and west wall in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Aug 30, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures throughout in the entire apartment located at apt 4g, 4th story, 2nd apartment from south at west
Aug 30, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3g, 3rd story, 1st apartment from south at west , section ''north''
Mar 8, 2026 · Apt 3G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at basement
Mar 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at boiler room at basement
Mar 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3g, 3rd story, 2nd apartment from south at west
Feb 20, 2026 · Apt 3G
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of air conditionerlocated at center window at 6th sty balcony at south stack at building front at fire escape
Sep 11, 2019
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all componets at south stack at building front at fire escape
Sep 11, 2019
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of air conditionerlocated at center window at 3rd sty balcony at north stack at building front at fire escape
Sep 11, 2019
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all componets at north stack at building front at fire escape
Sep 11, 2019
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, all stories at rear of building, south and north stack at fire escape
Apr 19, 2019
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, all stories at building front, north and south stack at fire escape
Apr 19, 2019
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, balconies and components building rear at fire escape
Jul 30, 2018
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 4e, 4th story, 2nd apartment from south at west , section at south
Jul 16, 2018 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 4e, 4th story, 2nd apartment from south at west , section at south
Jul 16, 2018 · Apt 4E
Closed — Violation dismissed - BHazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 5e, 5th story, 2nd apartment from south at west
Jul 16, 2018 · Apt 5E
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 16, 2018
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Jul 16, 2018
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling bulkhead at public hall, 6th story, section at south
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at bulkhead at public hall, 6th story, section at south
Jul 16, 2018
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling at bulkhead at public hall, 6th story, section at south
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 6th story, section at south
Jul 16, 2018
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 6th story, section at north
Jul 16, 2018
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story, section at south
Jul 16, 2018
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 3rd story, section at south
Jul 16, 2018
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 3rd story, section at north
Jul 16, 2018
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th story, section at south
Jul 16, 2018
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story, section at north
Jul 16, 2018
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th story, section at north
Jul 16, 2018
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes dropladder obstred by sidewalk bridge at 1st fire escape from north at east, 1st story
Oct 23, 2000
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate illegal . in the bedroom located at apt 3c, 3rd story, apartment at southwest
Dec 20, 1999 · Apt 3C
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of evidence of water leak at ceilings northeast room & southeast room 6 sty north apt 6h. , section '' ''
Sep 24, 1999 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & east wall northeast room 6 sty north apt 6h. , section '' ''
Sep 24, 1999 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over kitchen 6 sty northeast apt 61. located at apt 61
Sep 18, 1999 · Apt 61
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling northeast room 6 sty northeast apt 61. located at apt 61
Sep 18, 1999 · Apt 61
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of evidence of water leak ceiling northeast room 6 sty northeast apt 61. located at apt 61
Sep 18, 1999 · Apt 61
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutcheon plate riser at bathroom 6 sty northeast apt 61. located at apt 61
Sep 18, 1999 · Apt 61
Open — Nov sent out - BHazardous
Provide screen at bulkhead skylight no wire glass present.
Sep 18, 1999
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of lockable slide bolt at bulkhead door to roof.
Sep 18, 1999
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailboxes 1 sty public hall.
Jul 23, 1999
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors at wall of fire stairs public hall all stys.
Jul 23, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarding walls & ceiling stair bulkhead at roof south section.
Jul 23, 1999
Closed — Violation closed
DOB building violations · 9
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2008
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2004
Dob violation - resolved - Elevator elevatorrequired
(04) restore all hall indicators to operating orders
Nov 22, 1988
Dob violation - resolved
ECB violations · 6
- Class - 1
Sec. 3314.8 partial swo issued for suported scaffold pursuant 28-207.2& posted on premises. failed to provide toeboards guardrails. noted: at time of inspection supported scaffold at exp #1 missing toeboards &
Sep 18, 2014 · Penalty $1,630
Resolve - Class - 2
Partial swo issued for suspended scaffold pursautn 28-207.2 and postedon premises.failed to notify dept prior to installation of outrigger beam.noted:at time of inspection 2 outrigger beams installed at the ro
Sep 18, 2014 · Penalty $830
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial repa
Jan 9, 2009 · Penalty $400
Resolve - Non-hazardous
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial
May 9, 2008 · Penalty $700
Resolve - Non-hazardous
75r,08v,09m,353. 35 remove all material not pertaining to elevator.
Jul 30, 1993 · Penalty $1,000
Resolve - Non-hazardous
33#,08v,47k,73o,33# skylight
Jul 22, 1991 · Penalty $75
Resolve
Complaints
- Plumbing
Steam pipe/riser
Sep 4, 2026 · Apt 4G
Close - Plumbing
Water supply
Sep 1, 2026 · Apt 4G
Close - Plumbing
Steam pipe/riser
Sep 1, 2026 · Apt 4G
Close - Plumbing
Steam pipe/riser
Aug 28, 2026 · Apt 4G
Close - Water leak
Heavy flow
Aug 27, 2026 · Apt 4G
Close - Plumbing
Water supply
Aug 21, 2026 · Apt 4G
Close - Heat/hot water
Apartment only
Apr 21, 2026 · Apt 3G
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt 3G
Close - Heat/hot water
Entire building
Feb 17, 2026 · Apt 3G
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt 3G
Close
Show 9 more ↓
- Plumbing
Water supply
Jul 16, 2019 · Apt 5B
Close - Plumbing
Water supply
Jul 16, 2019 · Apt 3C
Close - Unsanitary condition
Garbage/recycling storage
Jan 25, 2019 · Apt BLDG
Close - Appliance
Electric/gas range
Jul 7, 2009 · Apt 5H
Close - Appliance
Refrigerator
Jul 7, 2009 · Apt 5H
Close - Nonconst
Vermin
Jul 7, 2009 · Apt 5H
Close - General
Doors
Jul 7, 2009 · Apt 5H
Close - Heating
Heat related
Nov 2, 2007 · Apt BLDG
Close - Heating
Heat related
Dec 14, 2003 · Apt 1H
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Mar 27, 2026 | $642,500 | Coops - elevator apartments | — |
| Sep 11, 2025 | $340,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1925
- Floors
- 6
- Residential units
- 54
- Building area
- 61,356 ft²
- Lot area
- 14,000 ft²
- Zoning
- R8
- Community board
- 112
- Council district
- 10
- Block / lot
- 2139 / 214
- Assessed value
- $2,195,100
- Landmark / historic district
- No
HPD registration #116607, last renewed Sep 9, 2025.
Questions about 70 Haven Avenue
Who owns 70 Haven Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Haven Equities INC.
Does 70 Haven Avenue have violations?
Yes. NYC HPD has recorded 125 housing violations at this property.
Is 70 Haven Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 70 Haven Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 70 Haven Avenue?
It has 54 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.