56 Ft Washington Avenue
Manhattan, NY 10032BBL 1-02137-0052Map
Owner of record: Fort Washington Estates, INC.
56 Ft Washington Avenue is an elevator apartment building built in 1915 in Manhattan, 10032. It has 42 residential units across 6 floors. The owner of record is Fort Washington Estates, INC.. HPD has recorded 547 housing violations here, most recently on February 26, 2026. 4 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 547
- DOB violations
- 32
- ECB violations
- 30
- HPD complaints
- 1,390
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 547
- BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling, north and east walls in the bathroom located at apt 41, 4th story, 2nd apartment from south at west original violation 18669515 issued 26-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 26, 2026 · Apt 41
Open — Notice of issuance sent to tenant - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... in the entrance located at apt 41, 4th story, 2nd apartment from south at west
Feb 26, 2026 · Apt 41
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at public hall, 6th story
Feb 26, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 41, 4th story, 2nd apartment from south at west
Feb 26, 2026 · Apt 41
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling, north and east walls in the bathroom located at apt 41, 4th story, 2nd apartment from south at west
Feb 26, 2026 · Apt 41
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
Feb 26, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at celing and west wall at public hall, 6th story
Feb 26, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at celing, south and west walls at public hall, 6th story
Feb 20, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the celing, south and west walls at public hall, 6th story
Feb 20, 2026
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over celing at public hall, 6th story
Feb 20, 2026
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door at public hall, 1st story
Jan 6, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 51, 5th story, 2nd apartment from south at west
Jan 6, 2026 · Apt 51
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective steam air valve on radiator at south in the 2nd room from east at south located at apt 5, 1st story, 2nd apartment from north at east
Dec 30, 2025 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 1st story, 2nd apartment from north at east
Dec 30, 2025 · Apt 5
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of excessive trash bags at building front court
Nov 3, 2025
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Nov 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 45, 4th story, 3rd apartment from north at east
Sep 13, 2025 · Apt 45
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and east and south walls in the bathroom located at apt 45, 4th story, 3rd apartment from north at east
Sep 13, 2025 · Apt 45
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 64, 6th story, 1st apartment from west at north
Aug 18, 2025 · Apt 64
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective window lower counter balance at east wall in the 1st room from north at west located at apt 64, 6th story, 1st apartment from west at north
Aug 18, 2025 · Apt 64
Closed — Violation dismissed - ANon-hazardous
Refit lower sash of the window at east wall in the 2nd bathroom from east located at apt 21, 2nd story, 2nd apartment from south at west
Jul 11, 2025 · Apt 21
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 21, 2nd story, 2nd apartment from south at west
Jul 11, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at south wall in the 1st room from east located at apt 21, 2nd story, 2nd apartment from south at west
Jul 11, 2025 · Apt 21
Open — False certification - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash of window at south wall in the 1st bathroom from east located at apt 21, 2nd story, 2nd apartment from south at west
Jul 11, 2025 · Apt 21
Open — False certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 21, 2nd story, 2nd apartment from south at west
Apr 1, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 21, 2nd story, 2nd apartment from south at west
Apr 1, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lock at door leading to fire escape window in the 1st room from east located at apt 21, 2nd story, 2nd apartment from south at west
Apr 1, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 21, 2nd story, 2nd apartment from south at west
Apr 1, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash in the 2nd bathroom from east located at apt 21, 2nd story, 2nd apartment from south at west
Apr 1, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 21, 2nd story, 2nd apartment from south at west
Apr 1, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 4th room from east located at apt 21, 2nd story, 2nd apartment from south at west
Apr 1, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash in the 1st room from east located at apt 21, 2nd story, 2nd apartment from south at west
Apr 1, 2025 · Apt 21
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 21, 2nd story, 2nd apartment from south at west
Dec 31, 2024 · Apt 21
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 21, 2nd story, 2nd apartment from south at west
Dec 31, 2024 · Apt 21
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 21, 2nd story, 2nd apartment from south at west
Dec 31, 2024 · Apt 21
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 21, 2nd story, 2nd apartment from south at west
Dec 31, 2024 · Apt 21
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling. in the kitchen located at apt 21, 2nd story, 2nd apartment from south at west
Dec 31, 2024 · Apt 21
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wash basin in the 3rd bathroom from east located at apt 26, 2nd story, 1st apartment from east at south
Apr 16, 2024 · Apt 26
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd bathroom from east located at apt 26, 2nd story, 1st apartment from east at south
Apr 16, 2024 · Apt 26
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls throughout in the 4th bathroom from east located at apt 26, 2nd story, 1st apartment from east at south
Apr 16, 2024 · Apt 26
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlets at north and south walls in the 4th bathroom from east located at apt 26, 2nd story, 1st apartment from east at south
Apr 16, 2024 · Apt 26
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls throughout in the 1st room from east located at apt 26, 2nd story, 1st apartment from east at south
Apr 16, 2024 · Apt 26
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls throughout in the kitchen located at apt 26, 2nd story, 1st apartment from east at south
Apr 16, 2024 · Apt 26
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 4th bathroom located at apt 26, 2nd story, 1st apartment from east at south
Apr 16, 2024 · Apt 26
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 6, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 6
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 6, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 6
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 64, 6th story, 1st apartment from north at east
Mar 18, 2024 · Apt 64
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at public hall, 6th story
Mar 18, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 6th story
Mar 18, 2024
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall at public hall, 6th story
Mar 18, 2024
Closed — Violation closed
DOB building violations · 32
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Plumbing none
The borough commissioner intends to revoke all plumbing approvals and permit in connection with job #140855750 due to revocation of license master plumber #1762 , all plumbing work in connection with above mentioned permit has ordered stopped immediately.
Mar 18, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 19, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2011
Dob violation - resolved
Show 22 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
1p10479
Dec 16, 2002
Dob violation - resolved - Elevator elevatorrequired
1p10479-cease use
Jan 24, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
1p10479
Apr 6, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatorrequired
Device #1p10479
Apr 24, 1991
Vp-violation unserved ecb-active - Elevator elevatorrequired
05-6th floor-31-top of car
Apr 23, 1990
Dob violation - resolved - Elevator elevatorrequired
(51)cease of elevator until missing vision glass and guards are replaced
Sep 29, 1988
Dob violation - resolved
ECB violations · 30
- Class - 2
Class 2: communications not working, restore service for communications. second floor out of service, restore service to second floor. missing braille tags, install braille tags as needed. fire evacuation signs
Apr 29, 2025
Resolve - Class - 1
Cease use items: dlm inoperative. door zone restrictor inoperative. this is a safety feature which ensures passenger safety. . remedy: restore to service and call the dob elevator division at (212) 393-2144 or
Dec 20, 2024 · Penalty $1,250
Active - Class - 2
Class 2: car button station not tagged with device number provide tag. lobby hall button damaged replace button. alarm bell not wired into stop switch wire in. evacuation signs missing provide required signage.
Jan 23, 2024 · Penalty $625
Resolve - Class - 1
Found door lock monitorting is not working. repair. if door lock monitoring not installed in this controller as per 3.10.12 of appendix k3 of the 2014 nycbc. remedy : install dlm and perform, and file test with
May 19, 2021 · Penalty $1,250
Resolve - Class - 1
Class 1 car cease use car door restrictor is not working plunger tie in up direction with wire tie. no access to motor room provide.
Oct 19, 2020
Resolve - Class - 1
Cease use 05-a-10,03-d-10,40-o-09,59-bb-07,68-b-07,37-d-10,98-bb-05,99-m-05,60-q-07=05-a-10 cease use item door zone restriuctor has been rendered inoperative this is a safety device to ensure elvator passenger
Oct 16, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to provide approved documents at time of inspection. note: during time of inspection observed construction work being performed in apartment 1 on the 1st floor. approved issued plans were not on-site
Jul 15, 2019 · Penalty $312
Resolve - Class - 2
02x10,03i10,52bb12,54b07,40#07,21j01,37d06,08v01,37m07,16d06,98b07. 02x-2wa communication missing; 40#-comply with section 8.1 (machine room); 21j-adjust 5th flr lock; 98b-provide updated 5 yr tag; 54b-provide
Dec 3, 2015 · Penalty $500
Resolve - Class - 1
Cu-59m07,05e01,67b10,cu-08b01,cu-10m07. 59m07cu-machine brake missingpin provide; 05e01-car door rubbing adjust; 67b10-communication insuf fcient repair in car phone; 08b01-car landing to sill insufficient adj
Sep 8, 2015 · Penalty $1,000
Resolve - Class - 2
58h10,49m07,59l10,59h11,37l06,37i10,37l10,39l10,34m07,68l1002l10,09l10,60l10,13m07,05m07. 58-worm & gear play; 49-cover; 37-secure; 37-secure ladder to building; 37-wall is crumbling; 34-buard on windows and
Dec 10, 2014 · Penalty $1,250
Resolve
Show 20 more ↓
- Class - 2
67b07,100bb07,12m10,97b02,64m07,100m07,36m07. 67b07-communication to code; 100bb07-reshackle tags to code cw & ( ); 12m10-repair cab light to code; 97b02-clean entire device; 64m07-providecity id in car; 100m
Oct 2, 2013
Resolve - Class - 2
12q03,08v10,32h10,37d06,58f10,16l10,16x10,67x10,94b12,59b12. 37-door lock inoperative; 16l10-basement hoistway doro not self closing and sticks on hall floor bangs on closing; 16x10-34d flr hoistway door-un
Sep 9, 2013
Resolve - Hazardous
Cease use.16i10.83x10,12q03,15m07,55y13,57h10,58e01,59q03,12x10,05j01.cease use item:damaged & misaligned basement door exposing hoistway-repair.83x-car shut down during inspection.12x,q-broken & unguarded cab
Dec 27, 2007
Resolve - Non-hazardous
Failure to maintain bldg.defect noted:in apt # 21 the fl sinks approx 2 1/2" to 3" at corridor near closet & bedroom # 1 also fl become uneven thru-out.remedy:repair all detects and maintain the bldg.
Mar 23, 2007 · Penalty $350
Resolve - Hazardous
Failure to maintain exterior bldg wall: defects noted: metal siding coping parapet level become loose & separated from joints & in danger ofcollapsed. location: roof level along w 161 st. remedy: provide
Mar 5, 2007 · Penalty $800
Resolve - Hazardous
Failure to maintain. noted : @ front of premises south west corner, balconies @ 2nd & 6th fl have concrete erosion & cracks. remedy : repairdefects, maintain building
Oct 26, 2006 · Penalty $10,000
Resolve - Hazardous
Failure to maintain.noted at front of premises south west corner. balcony at 2nd floor has concrete errosion and cracks and balcony at 6th floor has crack at the edge of corner. remedy:repair defects.
Jun 28, 2006 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior bldg wall. noted at south side of front facade a 2nd story lintel of bldg is missing a hugh piece also lintel at front of bldg entrance missing a small section 8" wide. remedy: repa
Mar 7, 2006 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior building wall south west cornice at roof sheet metal approx 20' long loose and blowing in wind rest of cornice looks unstable remedy:immediately provide protection for sidewalk obt
Apr 7, 2005 · Penalty $800
Resolve - Non-hazardous
39p7/32m7/71k10/5k10/10m7/8v1/20i11/85bb5/86bb5/38o2/66o2/33o2/67o2/68o2 32 counter weight spring 20 3rd fl.
Nov 17, 2003 · Penalty $350
Resolve - Non-hazardous
34a 34a)door must open towards egress and self closing
Nov 14, 2003 · Penalty $350
Resolve - Non-hazardous
33b07-75b05-50b10-09i06-03b11-17b07-10b11-20b11. 33-repair lock on ovlid door & provide access, repair ovhd. grating to cover holes. 75-perform 5 year tests as reg 50-return machines limits to open main feeders
Oct 15, 2001 · Penalty $180
Resolve - Non-hazardous
03i,32m,46o,49b,57o, 03-strike jump lower section required replacing
Jan 20, 1998
Resolve - Non-hazardous
05i,08v,09h,17r,30i,32q,49l,50y,57z,61k,60m,30m,75t. 05i saddle 17r for wire glass 30i walls 57z install sump-pump 61k sheet metal 60m counterweight 30m shaftway signs.
Feb 23, 1996 · Penalty $100
Resolve - Non-hazardous
05i,08v,09h,17r,17q,18l,03m,30i,31l,32q,49l,33p,61k,57z,57o,60m. 05i- saddle.17r-for wire glass.18l-lobby and 2nd floor.03m fan.30i-walls 61k-sheet metal.counterweight.
Jun 21, 1995
Resolve - Non-hazardous
17r,61k,62m,50y,50f,3m,30i,40i,40u,3m. 12 with wire glass 62-toe guard3 capacity plate 30-walls 3-hand rail.
Sep 23, 1994 · Penalty $1,000
Resolve - Non-hazardous
02l,03m,05i,08v,14m,09h,17r,17r,31l,32q,46l,49l,29r,05l,33p,35p,61k,62s,62m. 03m cut out on floor for safty key. 05 saddle. 29 landed. 62 toe guard.
Dec 27, 1993 · Penalty $500
Resolve - Non-hazardous
03m,08v,14m,17r,17q,31l,32q,37g,46l,47i,49l,29m,57o,05l,61k, 03m- cut-out on floor for safety key 17r- for wire glass 31l- exposed wiring 47i- kinked 29m- buffer 05l- cover hand hole
Mar 30, 1993 · Penalty $200
Resolve - Non-hazardous
35p
Mar 3, 1992
Resolve - Non-hazardous
17l,14m,73o, (17) inner door vision guard.
Apr 24, 1991 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
May 13, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Apr 24, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Apr 21, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Apr 20, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt 3
Close - Unsanitary condition
Mold
Mar 30, 2026 · Apt 22
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 24, 2026 · Apt 3
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Mar 22, 2026 · Apt 3
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Door/window
Window frame
Dec 24, 2025 · Apt 5
Close - Flooring/stairs
Floor
Dec 24, 2025 · Apt 5
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2025 · Apt 5
Close - Heat/hot water
Apartment only
Oct 29, 2025 · Apt 3
Close - Unsanitary condition
Mold
Sep 6, 2025 · Apt 45
Close - Door/window
Window frame
Aug 13, 2025 · Apt 64
Close - Paint/plaster
Ceiling
Aug 13, 2025 · Apt 64
Close - Paint/plaster
Ceiling
Jul 8, 2025 · Apt 21
Close - Flooring/stairs
Floor
Jul 8, 2025 · Apt 21
Close - Unsanitary condition
Mold
Jul 8, 2025 · Apt 21
Close - Paint/plaster
Wall
Jul 8, 2025 · Apt 21
Close - Door/window
Window frame
Jul 8, 2025 · Apt 21
Close - Paint/plaster
Ceiling
Jul 8, 2025 · Apt 21
Close - Electric
Outlet/switch
Jul 8, 2025 · Apt 21
Close - Electric
No lighting
Jul 8, 2025 · Apt 21
Close - Paint/plaster
Wall
Jun 20, 2025 · Apt 21
Close - Water leak
Slow leak
Jun 20, 2025 · Apt 21
Close - Electric
Wiring
Jun 20, 2025 · Apt 21
Close - Unsanitary condition
Mold
Jun 20, 2025 · Apt 21
Close - Door/window
Window frame
Jun 20, 2025 · Apt 21
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1915
- Floors
- 6
- Residential units
- 42
- Building area
- 55,302 ft²
- Lot area
- 11,954 ft²
- Zoning
- R8
- Community board
- 112
- Council district
- 7
- Block / lot
- 2137 / 52
- Assessed value
- $1,919,250
- Landmark / historic district
- No
HPD registration #121131, last renewed Sep 4, 2025.
Questions about 56 Ft Washington Avenue
Who owns 56 Ft Washington Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Fort Washington Estates, INC..
Does 56 Ft Washington Avenue have violations?
Yes. NYC HPD has recorded 547 housing violations at this property.
Is 56 Ft Washington Avenue rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 17% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 56 Ft Washington Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 56 Ft Washington Avenue?
It has 42 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.