roofy

563 West 171 Street

Manhattan, NY 10032BBL 1-02128-0026Map

Owner of record: 171 St. Nick LLC

563 West 171 Street is an elevator apartment building built in 1927 in Manhattan, 10032. It has 43 residential units across 6 floors. The owner of record is 171 St. Nick LLC. HPD has recorded 188 housing violations here, most recently on December 15, 2025. 8 of the 50 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.

HPD violations
188
DOB violations
14
ECB violations
28
HPD complaints
416

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 15, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
42
About 98% of the building's 43 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 188

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east

    Dec 15, 2025 · Apt 3C

    Open — Invalid certification
  • C

    Provide ready access to buildings heating system door locked at basement at boiler room

    Dec 15, 2025

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 2nd apartment from north at east

    Dec 15, 2025 · Apt 3D

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 6th story balcony on west fire escape at building front

    Sep 10, 2025

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west

    Aug 30, 2025 · Apt 3D

    Open — Notice of issuance sent to tenant
  • B

    Replace with new the missing electrical light fixture at ceiling in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west

    Aug 30, 2025 · Apt 3D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceiling at public hall, 6th story

    Nov 15, 2023

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 6d, 6th story, 2nd apartment from south at west

    Nov 15, 2023 · Apt 6D

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak above ceiling in the 1st room from north located at apt 6d, 6th story, 2nd apartment from south at west

    Nov 15, 2023 · Apt 6D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Nov 15, 2023 · Apt 6D

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Nov 15, 2023 · Apt 6D

    Open — Notice of issuance sent to tenant
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Nov 15, 2023 · Apt 6D

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Nov 15, 2023 · Apt 6D

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Nov 15, 2023

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Nov 15, 2023 · Apt 6D

    Open — Nov sent out
  • C

    Remove the illegal fastening push bar at bulkhead door that does not allow reentry from roof into the building at bulkhead at public hall, 6th story

    Oct 12, 2023

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 1c, 1st story, 1st apartment from south at west

    Sep 26, 2023 · Apt 1C

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 1c, 1st story, 1st apartment from south at west

    Sep 26, 2023 · Apt 1C

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 1c, 1st story, 1st apartment from south at west

    Sep 26, 2023 · Apt 1C

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Sep 26, 2023 · Apt 1A

    Closed — Violation dismissed
  • B

    Replace with new the missing knob at entrance door in the 3rd room from east at north located at apt 1e, 1st story, 3rd apartment from south at west

    Sep 26, 2023 · Apt 1E

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of a key operated lock at door leading to fire escape window in the 1st room from north located at apt 4e, 4th story, 3rd apartment from south at west

    Sep 26, 2023 · Apt 4E

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation steam riser at west in the kitchen located at apt 5f, 5th story, 1st apartment from west at north

    Sep 26, 2023 · Apt 5F

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation steam riser at east in the bathroom located at apt 5f, 5th story, 1st apartment from west at north

    Sep 26, 2023 · Apt 5F

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = .0; wg to repair = 0; in the entire apartment located at apt 6b, 6th story, 1st apartment from east at south

    Sep 26, 2023 · Apt 6B

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of a key operated lock at door leading fire escape window in the 3rd room from north located at apt 6a, 6th story, 2nd apartment from north at east

    Sep 26, 2023 · Apt 6A

    Closed — Violation dismissed
  • C

    Remove the illegal fastening push/panic bar at door to roof preventing re-entry to building from roof

    Sep 26, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door , roof

    Sep 26, 2023

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall, 2nd window frame from east at south wall in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, west wall in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, east wall in the kitchen located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from east at south wall in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 3rd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the 3rd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at west wall in the 3rd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color 5 sq. ft. at ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Open — Defect letter issued
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Open — Defect letter issued
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Open — Not complied with
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2023 · Apt 1A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallway located at apt 1e, 1st story, 3rd apartment from south at west

    May 21, 2023 · Apt 1E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the private hallway located at apt 1e, 1st story, 3rd apartment from south at west

    May 21, 2023 · Apt 1E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 1e, 1st story, 3rd apartment from south at west

    May 21, 2023 · Apt 1E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the private hallway located at apt 1e, 1st story, 3rd apartment from south at west

    May 21, 2023 · Apt 1E

    Closed — Violation closed

DOB building violations · 14

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 4, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 2, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 19, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 27, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 24, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    1p15101

    Dec 11, 2002

    Dob violation - resolved
Show 4 more ↓
  • Elevator elevatorrequired

    1p15101

    Nov 17, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    1p15101

    Apr 13, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    (03) no capacity plate in cab (73) perform 5 year test and file

    Nov 28, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (51)cover car light (52)clean installation

    Oct 26, 1988

    Dob violation - resolved

ECB violations · 28

  • Class - 2

    Fire signage missing, provide. in car communication inoperative, repair. hallway call buttons inoperative, activate. machine room inaccessible, provide access.

    Apr 3, 2023 · Penalty $655

    Resolve
  • Class - 2

    1. repair outside communication . 2. repair vision panel on 5th floor

    Jun 18, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: failure to comply w/law for drainage system per 702.1;27-911. at the time 11:14am of my inspection on 9/22/16 at the above address. i observed in cellar area

    Sep 22, 2016 · Penalty $500

    Resolve
  • Class - 1

    Filed a certificate,form,application etc. containing a material false statements. at the time 11:14am of my inspection on 9-22-16 at the above address i observed in cellar area (fernco) couplings on sewer line

    Sep 22, 2016 · Penalty $4,800

    Resolve
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner. at the time 11:14am of my inspection on 9-22-16 at the above address,i observed in cellar area fernco couplings on sewer line,nov was issued on

    Sep 22, 2016 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. failure to observe law of drainage observed on 11/28/15. per 702.1 in cellar-fernco waste rubber carplug 27-911 installed in ceiling.

    Nov 28, 2015 · Penalty $250

    Resolve
  • Class - 2

    11#076,37#07,16j10,40#07,70#07. 16j-6th flr dropkey hole-misaligned- repair; 70#-comply w/section 8.1; 11#-comply with section 8.1(basementlockout) 37# comply w/section 8.1. 40#comply with section (machine rm)

    Nov 9, 2015

    Resolve
  • Class - 2

    03d06,33q03,35q03,36q03,56y13,59q11,75m11,76q03. 03d- secure handrail in car. 33q- install guard for counterweight in pit. 35q- install cover for electrical box top of car. 36q- install covers for electrical

    Dec 24, 2012 · Penalty $250

    Resolve
  • Class - 2

    03m11,20m11,39o02,40p16,70o02,76q03. 03m- replace hand rail in car. 20m- replace 6th flr hoistway door vision glass. 76q- install cover for plank switch top of car.

    Jun 27, 2012 · Penalty $530

    Resolve
  • Non-hazardous

    02l10.165i10.74m07.23i11.36p16.84b10.66o02. 02l10 repair alarm system 16i10 repair bsmt door pivot & door check 74m07 provide missing counter weight buffer 23i11 replace 5 fl hall button 84b10 repair ab phone

    Jun 24, 2008 · Penalty $350

    Resolve
Show 18 more ↓
  • Non-hazardous

    Cease use.66o0z,52b14,16l10,02l10,31h10,69m07,16j10.16l10-basement hatchway door doesn't close properly have to pull close.02l10-alarm bell does not work provide working alarm bell.31h10-car shoes are worn.cu

    Mar 28, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    16b01.20i11. 16 adjust lobby fl mechanism dooroperator for proper closing of lobby & 2nd hoistway vision panel doors

    Mar 19, 2008

    Resolve
  • Non-hazardous

    83x7:(83)restore to service & call for inspection (212)566-5542

    Dec 20, 2006 · Penalty $180

    Resolve
  • Non-hazardous

    84x10/39p16/36p16 84 elevator not stoping on 1st floor. remedy: repairso that a full inspection can be made by this dept.

    May 12, 2006

    Resolve
  • Non-hazardous

    11l10/16l01/39p07/44q10/74p07. 11- elev. does not come down to the 1st flr. 16- 5th flr & whenever needed. 44- replace lock & repair door.

    Apr 28, 2006 · Penalty $180

    Resolve
  • Non-hazardous

    10m11. 10-replace missing car door gibs.

    Aug 16, 2005 · Penalty $180

    Resolve
  • Non-hazardous

    85u05

    Nov 8, 2004 · Penalty $180

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall noted at front left side west side above sixth floor window mortar joint open approx one haalf inch x 2 ft long remedy maintain building wall

    Aug 30, 2002 · Penalty $180

    Resolve
  • Non-hazardous

    3i11-9h12-15i11-17i12-18l11-51b7-50y2-62m7-73n7-74b7 3i11=car post 15i11=slam 3rd fl. 17i12=1st fl 18l11=stops car in flight when 2nd fl door is pulled 51b7=oil 62m7=cwt 73n7=provide service to 6th fl.

    Dec 14, 2001 · Penalty $180

    Resolve
  • Non-hazardous

    18i12,06j01,08j01,10l11,57o02,74o02,18-lobby.06-door has too much gap adjust door.to be equal.08-4fl.10-turn station around fl1,2,3,4,5,6,not reersed.74-clean car top.

    Oct 18, 2000 · Penalty $2,500

    Resolve
  • Non-hazardous

    18m,30o,57o,20f,47b. replace lock cover in shaft, clean pit, clean machine of oil leak, replace hall button, 6 floor. shorthen governor saftey cable.

    Jul 17, 1999

    Resolve
  • Non-hazardous

    02l,75u,57o,18b,08v,50y,09i,74x, 18-adjust interlock 1st floor 74-4th floor car does't work when car move from up to down.

    Jan 20, 1998 · Penalty $180

    Resolve
  • Non-hazardous

    03i,05i,08i.

    Feb 14, 1996 · Penalty $100

    Resolve
  • Non-hazardous

    21i,8v,74#,36w,33#,15r 74have elev ans all call 33replace skylight 15manual lock

    Sep 28, 1994

    Resolve
  • Non-hazardous

    73o 31q 22d 21i 33p 35p 8v 74# 74 have elv ans all call

    Dec 3, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    35p,57o,

    Feb 20, 1992 · Penalty $1,000

    Resolve
  • Non-hazardous

    73x

    Jul 13, 1991 · Penalty $150

    Resolve
  • Non-hazardous

    35p;73x;

    Jun 18, 1991 · Penalty $150

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jun 24, 2026 · Apt 5F

    Close
  • Paint/plaster

    Wall

    Jun 24, 2026 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2025 · Apt 5F

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2025 · Apt 6B

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2025 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Aug 24, 2025 · Apt 3D

    Close
  • Paint/plaster

    Ceiling

    Aug 24, 2025 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Aug 24, 2025 · Apt 3D

    Close
  • Electric

    Lighting

    Aug 24, 2025 · Apt 3D

    Close
  • Flooring/stairs

    Floor

    Aug 24, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Mold

    Jun 19, 2025 · Apt 6C

    Close
  • Appliance

    Refrigerator

    Jun 19, 2025 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Jun 19, 2025 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Jun 19, 2025 · Apt 6C

    Close
  • Door/window

    Door

    Apr 29, 2025 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2025 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Apr 26, 2024 · Apt 5C

    Close
  • Paint/plaster

    Ceiling

    Mar 19, 2024 · Apt 5C

    Close
  • Elevator

    Maintenance

    Jan 24, 2024 · Apt BLDG

    Close
  • Door/window

    Door

    Jan 8, 2024 · Apt 5C

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2024 · Apt 5C

    Close
  • Door/window

    Door to dumbwaiter

    Jan 5, 2024 · Apt 5C

    Close
  • Elevator

    Maintenance

    Dec 5, 2023 · Apt 1FL

    Close
  • Electric

    Outlet/switch

    Dec 5, 2023 · Apt 5C

    Close
  • Water leak

    Damp spot

    Dec 5, 2023 · Apt 5C

    Close
  • Door/window

    Door

    Dec 5, 2023 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2023 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Aug 7, 2023 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Aug 7, 2023 · Apt 1A

    Close
  • General

    Cooking gas

    May 18, 2023 · Apt 1E

    Close
  • Plumbing

    Water supply

    May 3, 2023 · Apt 1E

    Close
  • Paint/plaster

    Wall

    May 3, 2023 · Apt 1E

    Close
  • Appliance

    Electric/gas range

    May 3, 2023 · Apt 1E

    Close
  • Electric

    No lighting

    May 3, 2023 · Apt 1E

    Close
  • Paint/plaster

    Ceiling

    May 3, 2023 · Apt 1E

    Close
  • Paint/plaster

    Ceiling

    May 3, 2023 · Apt 1E

    Close
  • Paint/plaster

    Wall

    Apr 25, 2023 · Apt 1E

    Close
  • Plumbing

    Basin/sink

    Apr 12, 2023 · Apt 1E

    Close
  • Electric

    No lighting

    Apr 12, 2023 · Apt 1E

    Close
  • Appliance

    Electric/gas range

    Apr 12, 2023 · Apt 1E

    Close
  • Flooring/stairs

    Floor

    Apr 12, 2023 · Apt 1E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1927
Floors
6
Residential units
43
Building area
31,668 ft²
Lot area
7,125 ft²
Zoning
R7-2
Community board
112
Council district
10
Block / lot
2128 / 26
Assessed value
$940,500
Landmark / historic district
No

HPD registration #113019, last renewed Jul 24, 2025.

Questions about 563 West 171 Street

Who owns 563 West 171 Street?

The owner of record in NYC Department of City Planning PLUTO data is 171 St. Nick LLC.

Does 563 West 171 Street have violations?

Yes. NYC HPD has recorded 188 housing violations at this property.

Is 563 West 171 Street rent stabilized?

NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 98% of its 43 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 563 West 171 Street built?

City records list 1927 as the year it was built.

How many apartments are in 563 West 171 Street?

It has 43 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.