509 West 161 Street
Manhattan, NY 10032BBL 1-02120-0044Map
Owner of record: Visage Realty INC
509 West 161 Street is a walk-up apartment building built in 1920 in Manhattan, 10032. It has 25 residential units across 5 floors. The owner of record is Visage Realty INC. HPD has recorded 340 housing violations here, most recently on October 15, 2026. 25 of the 50 most recent violations are still open. City tax records listed 25 rent-stabilized apartments here in 2024.
- HPD violations
- 340
- DOB violations
- 16
- ECB violations
- 18
- HPD complaints
- 1,282
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 340
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1c, 1st story, 2nd apartment from west at north
Oct 15, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4c, 4th story, 2nd apartment from west at north
Oct 15, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Oct 15, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood sub floor in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Oct 15, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Oct 15, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the private hallway located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls throughout in the kitchen located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 4th room from north at east located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 4th room from north at west located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 3rd room from north at west located at apt 5e, 5th story, 2nd apartment from east at south
Oct 15, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west yard
Sep 9, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 4c, 4th story, 2nd apartment from west at north
Sep 9, 2026 · Apt 4C
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1c, 1st story, 2nd apartment from west at north
Aug 18, 2026 · Apt 1C
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser in the kitchen located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 2nd room from north located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door in the 1st room from north at west located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective marble saddle in the entrance located at apt 4c, 4th story, 2nd apartment from west at north
Aug 18, 2026 · Apt 4C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, east wall, south wall, west wall, and at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at north wall, east wall, south wall, west wall, and at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Open — Defect letter issued - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective latch set at entrance door in the 1st room from east at south located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective door frame casing at entrance in the 1st room from east at south located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at front entrance door to building
Jul 26, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jul 26, 2026 · Apt 1E
Open — Defect letter issued - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash at fire escape window in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north
Jun 25, 2026 · Apt 4D
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story
Jun 18, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3a, 3rd story, 2nd apartment from north at east
May 4, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door
May 4, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story
Apr 9, 2026
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 1o square feet at the east wall in the bathroom located at apt 5a, 5th story, 1st apartment from east at south original violation 18760967 issued 03-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 3, 2026 · Apt 5A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Apr 3, 2026 · Apt 5A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from east at south wall in the 3rd room from north at west located at apt 5a, 5th story, 1st apartment from east at south
Apr 3, 2026 · Apt 5A
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from north at center, the foyer located at apt 5a, 5th story, 1st apartment from east at south
Apr 3, 2026 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at west wall, south wall in the 3rd room from north at east located at apt 5a, 5th story, 1st apartment from east at south
Apr 3, 2026 · Apt 5A
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at north wall in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Apr 3, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Apr 3, 2026 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Apr 3, 2026 · Apt 5A
Closed — Violation closed
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 31, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 25, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 22, 1995
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 18
- Class - 2
Clamps and bolts missing on rear door of boiler. need tank room sign on door. corrosion on water line before check going into front of boiler.
Feb 9, 2021
Resolve - Class - 2
Failure to comply with the comm order to file a cert of correction with the dob for nov #35014680h issued on 01/31/13 pursuant to 28-204.4 & 1rcny 102-01 for failure to maintain bldg.rem:file a cert of correcti
Jul 29, 2014 · Penalty $2,000
Resolve - Class - 1
Failure to maintain bldg noted: at right front of existing 5 story bldg,metal cornice section approx 3'x20' hanging & in danger of falling &expose elements. remedy: remove hanging metal cornice & install sidewa
Jan 31, 2013
Resolve - Class - 1
Failure to maintain bldg noted: at right front of existing 45 story bldg,metal cornice section apprx 3' x 20' hanging and in danger of falling and exposed elements.rmdy:remove hanging metal cornice and instal
Jan 31, 2013 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner.noted:@ the front gate there is a lock on the gate that blocks the fire passage egress to the street.rem:immediately remove lock @ gate.
Sep 17, 2011
Resolve - Class - 2
B254,15,16,24a,32a,34b,40,41c,44c,46b,50,50a,b,c,d,e. 50- oil shut offvalve. 50a- oil tank sign missing. 50b- chimney base cleanout door, cemented over. 50c- left side, boiler water column corroded. 50d- hot
Aug 31, 2011
Resolve - Class - 1
Occupancy contrary to that allowed by bldg dept records noted at cellar lvl of above premises 2 class a apt observed 1 or 2 apts is legal supers apt at time of insp both apt being used rem: discontinue illegal
Jul 7, 2011 · Penalty $24,000
Active - Class - 2
Failure to comply w/the comm's order to file a cofc w/the dob.respondent failed to comply w/the comm's order to correct the violating conditions and file a cofc pursuant to 28-204.2 for nov34879941n.rem:correct
Jul 7, 2011 · Penalty $2,000
Resolve - Class - 1
Occupancy contrary to that allowed by dob records.legal use-1 supers apt current use-2 apt plug 1 single room occupancy.location-cellar.rem:vacate s.r.rem:discontinue illegal occupancy & restore to prior legal
Apr 14, 2011 · Penalty $12,000
Active - Class - 3
Work w/o permit.work noted:installed partitions,kitchen sink & 2 3pc bathrooms in cellar.note:this is in addition to legal cellar supers apt.rem:obtain permit,restore to prior legal condition.
Apr 14, 2011 · Penalty $500
Active
Show 8 more ↓
- Class - 3
Occupancy contrary to dob records. 2 class "a" apts located in basement where only super's apt should exist. both apts have proper means of egress. remedy: amend certificate of occupancy or restore premises to
Mar 6, 2009 · Penalty $500
Active - Class - 1
Failure to maintain bldg wall or appurtenances. noted: at the front (south elevation) vaults south retaining wall the upper portions are deterorated and sections of it have dislodged leaving the top (sidewalk
Jul 28, 2008 · Penalty $5,000
Active - Class - 1
Failure to maintain exterior bldg walls or apputenances noted underside of entry as it crosses entry alley for cellar is deteriorated w/ a section @ 1'x2'x3" that is in danger of falling stone (cornice) to righ
Jul 11, 2008 · Penalty $5,000
Active - Hazardous
Failure to maintain bldg. (1) a/c installed at fe. windows, debris & misc. objects stored on & causing obstructions on fire escape. (2) eastcourtyard used as a garbage dump & full of household garbage garbage b
Jan 20, 2006 · Penalty $480
Resolve - Hazardous
Failure to maintain bldg-hazardous. in that debris and other house hole goods are being stored on firescape at all levels, last side and rear of bldg creating an obstruction and fire hazard for tenants. exit pa
Sep 12, 2005 · Penalty $800
Resolve - Non-hazardous
Work without a pemit work noted 1 cellar front section noted 1 celalr front sec tion of bldg converted from storage space to restaurant cormer of bldg entrance installed at south/east corner of bldg new metl
Jun 8, 1999 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit: work noted: (1) celler front section of bldg. converted from storage area to restaurant with separate entrance installed at south/east corner of bldg. at cellar with metal access stair to
Sep 5, 1997 · Penalty $1,000
Resolve - Non-hazardous
Illegal use in a residential district. noted: cellar restaurant operating in an r7-2 district when such use is not permitted. remedy: discontinue illegal use forthwith.
Sep 5, 1997 · Penalty $500
Resolve
Complaints
- Electric
Outlet/switch
Oct 6, 2026 · Apt 4C
Open - General
Cooking gas
Sep 3, 2026 · Apt 4C
Close - Heat/hot water
Apartment only
Aug 28, 2026 · Apt 5E
Close - Unsanitary condition
Mold
Aug 7, 2026 · Apt 4C
Close - Paint/plaster
Wall
Aug 7, 2026 · Apt 4C
Close - Paint/plaster
Wall
Aug 7, 2026 · Apt 4C
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt 4C
Close - Appliance
Electric/gas range
Aug 7, 2026 · Apt 4C
Close - Plumbing
Bathtub/shower
Jul 29, 2026 · Apt APT1E
Open - Door/window
Door
Jul 24, 2026 · Apt 4C
Close
Show 40 more ↓
- General
Cooking gas
Jul 24, 2026 · Apt 4C
Close - Flooring/stairs
Floor
Jul 24, 2026 · Apt 4C
Close - Unsanitary condition
Mold
Jul 24, 2026 · Apt 4C
Close - Paint/plaster
Wall
Jul 24, 2026 · Apt 4C
Close - Flooring/stairs
Floor
Jul 24, 2026 · Apt 4C
Close - Unsanitary condition
Mold
Jul 14, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Jul 14, 2026 · Apt 1E
Close - Door/window
Door frame
Jul 14, 2026 · Apt 1E
Close - Flooring/stairs
Floor
Jul 14, 2026 · Apt 1E
Close - Heat/hot water
Entire building
Jun 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 26, 2026 · Apt 1
Close - Unsanitary condition
Pests
Apr 26, 2026 · Apt 1
Close - General
Cooking gas
Apr 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 4, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Mar 26, 2026 · Apt 5A
Close - Door/window
Door
Mar 26, 2026 · Apt 5A
Close - Heat/hot water
Entire building
Mar 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt 5E
Close - Heat/hot water
Apartment only
Feb 6, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Feb 4, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 5D
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 25
- Building area
- 17,495 ft²
- Lot area
- 4,955 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2120 / 44
- Assessed value
- $760,950
- Landmark / historic district
- No
HPD registration #105308, last renewed Jul 17, 2026.
Questions about 509 West 161 Street
Who owns 509 West 161 Street?
The owner of record in NYC Department of City Planning PLUTO data is Visage Realty INC.
Does 509 West 161 Street have violations?
Yes. NYC HPD has recorded 340 housing violations at this property.
Is 509 West 161 Street rent stabilized?
NYC Department of Finance tax bills listed 25 rent-stabilized units here in 2024 (about 100% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 509 West 161 Street built?
City records list 1920 as the year it was built.
How many apartments are in 509 West 161 Street?
It has 25 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.