3856 Broadway
Manhattan, NY 10032BBL 1-02119-0005Map
Owner of record: Gps 3850 LLC
3856 Broadway is an elevator apartment building built in 1909 in Manhattan, 10032. It has 39 residential units across 6 floors. The owner of record is Gps 3850 LLC. HPD has recorded 1,474 housing violations here, most recently on March 15, 2026. 9 of the 50 most recent violations are still open. City tax records listed 36 rent-stabilized apartments here in 2024.
- HPD violations
- 1,474
- DOB violations
- 30
- ECB violations
- 66
- HPD complaints
- 1,658
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,474
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 44, 4th story, 3rd apartment from south at west
Mar 15, 2026 · Apt 44
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 44, 4th story, 3rd apartment from south at west
Mar 15, 2026 · Apt 44
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 44, 4th story, 3rd apartment from south at west
Mar 15, 2026 · Apt 44
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 44, 4th story, 3rd apartment from south at west
Mar 15, 2026 · Apt 44
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinly floor tiles in the kitchen located at apt 44, 4th story, 3rd apartment from south at west
Mar 15, 2026 · Apt 44
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north located at apt 44, 4th story, 3rd apartment from south at west
Mar 15, 2026 · Apt 44
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 44, 4th story, 3rd apartment from south at west
Mar 15, 2026 · Apt 44
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees fahrenheit in the entire apartment located at apt 32, 3rd story, 2nd apartment from south at west
Mar 2, 2026 · Apt 32
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 21, 2nd story, 1st apartment from east at south
Feb 5, 2026 · Apt 21
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Feb 5, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 21, 2nd story, 1st apartment from east at south
Feb 5, 2026 · Apt 21
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Jun 26, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 25, 2nd story, 1st apartment from north at east
Jun 26, 2025 · Apt 25
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 25, 2nd story, 1st apartment from north at east
Jun 26, 2025 · Apt 25
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 25, 2nd story, 1st apartment from north at east
Jun 26, 2025 · Apt 25
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the private hallway located at apt 25, 2nd story, 1st apartment from north at east
Jun 26, 2025 · Apt 25
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and west walls in the private hallway located at apt 67, 6th story, 5th apartment from south at west
Jun 22, 2025 · Apt 67
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 67, 6th story, 5th apartment from south at west
Jun 22, 2025 · Apt 67
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 6th room from east located at apt 67, 6th story, 5th apartment from south at west
Jun 22, 2025 · Apt 67
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, west and south walls in the 8th room from east located at apt 67, 6th story, 5th apartment from south at west
Jun 22, 2025 · Apt 67
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 25, 2nd story, 1st apartment from north at east
May 13, 2025 · Apt 25
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 8th room from east located at apt 67, 6th story, 5th apartment from south at west
May 13, 2025 · Apt 67
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 67, 6th story, 5th apartment from south at west
May 13, 2025 · Apt 67
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 44, 4th story, 3rd apartment from south at west
May 13, 2025 · Apt 44
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 44, 4th story, 3rd apartment from south at west
May 13, 2025 · Apt 44
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 27, 2nd story, 5th apartment from south at west
May 13, 2025 · Apt 27
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 6th room from north located at apt 25, 2nd story, 1st apartment from north at east
May 13, 2025 · Apt 25
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 25, 2nd story, 1st apartment from north at east
May 13, 2025 · Apt 25
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at east and north wall in the 2nd room from north located at apt 25, 2nd story, 1st apartment from north at east
May 13, 2025 · Apt 25
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 25, 2nd story, 1st apartment from north at east
May 13, 2025 · Apt 25
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective laminated wooden floor tiles in the private hallway located at apt 25, 2nd story, 1st apartment from north at east
May 13, 2025 · Apt 25
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic walls tiles at south wall in the bathroom located at apt 25, 2nd story, 1st apartment from north at east
May 13, 2025 · Apt 25
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 8th room from east located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood door frame jamb and casing in the 6th room from east located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of sliding bolt, capable to accept padlock, installed at door in the entrance located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 8th room from east located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 8th room from east located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 8th room from east located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles floor in the bathroom located at apt 67, 6th story, 5th apartment from south at west
Dec 12, 2024 · Apt 67
Closed — Violation closed - BHazardous
Abate the infestation consisting of vermin water bugs in the entire apartment located at apt 4, 1st story, 1st apartment from east at south
Nov 9, 2024 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4, 1st story, 1st apartment from east at south
Nov 9, 2024 · Apt 4
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4, 1st story, 1st apartment from east at south
Nov 9, 2024 · Apt 4
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line pipe at sink in the kitchen located at apt 4, 1st story, 1st apartment from east at south
Nov 9, 2024 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north at east located at apt 4, 1st story, 1st apartment from east at south
Nov 9, 2024 · Apt 4
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection ... in the bathroom located at apt 4, 1st story, 1st apartment from east at south
Nov 9, 2024 · Apt 4
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4, 1st story, 1st apartment from east at south
Nov 9, 2024 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4, 1st story, 1st apartment from east at south
Nov 9, 2024 · Apt 4
Closed — Violation dismissed
DOB building violations · 30
- Construction other optional
Borough commissioner notice of order to stop work immediately due to applicant withdrawal #122126387
Jul 9, 2025
Dob violation - active - Construction other optional
Emergency work order due to imminent hazardous conditions on exp #1 north & exp #4 west elev. conditions are cracks & spalling bricks & terra cotta @ parapet cornice & around windows decoration, water table owner must immediately retain licensed prof to supervise repairs remedy:install safety mesaures to protect the public.file fisp report
Aug 12, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 8, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 20, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active
Show 20 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 7, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - active - High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2012 annual high pressure boiler inspection
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2009
Dob violation - resolved - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Oct 2, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 18, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
1p10271
Nov 19, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 12, 1995
Dob violation - dismissed
ECB violations · 66
- Class - 2
Observed at 6 story building with sidewalk shed erected at exposure 1 & 4. at time of inspection, upon research of dept filings it was found no active permit on file for sidewalk shed. no permit is unsafe to pu
Oct 5, 2026 · Penalty $1,250
Active - Class - 2
Observed at 6 story building with sidewalk shed erected at exposure 1 & 4. at time of inspection, i observed sidewalk shed not maintained as per code. multiple defected and deteriorated mudsills . these conditi
Oct 5, 2026 · Penalty $2,400
Active - Class - 2
Failure to submit certificate of correction of violation #35675941p issued on 01-12-2024 for occupancy contrary to that allowed by the certificate of occupancy or buildings department records., file a certifica
Aug 26, 2026 · Penalty $1,250
Active - Class - 2
Failure to submit certificate of correction of violation #39137720z issued on 02-06-2025 for unlawful acts. failure to comply with commissioner's order., file a certificate of correction
Aug 26, 2026 · Penalty $1,250
Active - Class - 2
Failure to submit certificate of correction of violation #35675944k issued on 01-12-2024 for failure to maintain building in code compliant manner: lack of require d number of means of egress for every floor pe
Aug 26, 2026 · Penalty $1,250
Active - Class - 1
Failure to submit certificate of correction of violation #35675942r issued on 01-12-2024 for work without a permit., comply with commissioner's order
Aug 26, 2026 · Penalty $2,500
Active - Class - 2
Failure to submit certificate of correction of violation #35675943z issued on 01-12-2024 for failure to maintain building in code-complaint manner., file a certificate of correction
Aug 26, 2026 · Penalty $1,250
Active - Class - 2
At time of inspection of 6 story mixed use building observed sidewalk shed in place without information panel causing hazardous conditions.provide sign
Jul 17, 2026 · Penalty $1,250
Active - Class - 1
Class 1: cease use: sheave bearings severely worn replace & retest (cu). door restrictor inoperative repair & test (cu). plank switch jumped out remove jumper (cu). brakes worn change pads & adjust (cu). test w
May 22, 2025 · Penalty $1,250
Resolve - Class - 1
Upon reinspection of commercial space within mixed used mdb. bldg., i observed electrical installation completed, store lighting, devices & equipment operational while stop work order not rescinded, violation i
Feb 6, 2025 · Penalty $5,000
Active
Show 40 more ↓
- Class - 1
I observed new electric panel w/ 17 circuit breakers installed on wall, new wiring installed inside steel conduit along ceilings and walls for 23- lights and switches, new wiring and components for two a/c cond
Dec 9, 2024 · Penalty $1,250
Resolve - Class - 2
At time of inspection of 5 story mixed use building observed sidewalk shed in place with permit 140442974 expired 12-23-16
Sep 24, 2024 · Penalty $1,250
Resolve - Class - 2
At time of inspection of 5 story mixed use building observed sidewalk shed in place with no information panel on parapet.provide sign
Sep 24, 2024 · Penalty $1,250
Resolve - Class - 2
At time of inspection of 5 story mixed use building observed sidewalk shed in place with no lighting installed causing hazardous conditions.provide lighting
Sep 24, 2024 · Penalty $2,400
Resolve - Class - 1
Failure to maintain exterior building walls and appurtenances. as noted: at the time of inspection i observed on exposure #1, 2, 3 and 4 ac units inadequately supported. exposure #1 north elevation and exposure
Aug 12, 2024 · Penalty $2,500
Active - Class - 1
Failure to provide the required light and ventilation for every bedroom having created at cellar level north west section 2 bedrooms withoutnatural light and ventilation as per mdl sec#30 and 27-2057.rem:comply
Jan 12, 2024 · Penalty $1,250
Active - Class - 1
Failure to provide the required number of means of egress for every floor as per bc 1021.1(2014)and 27-366 for sleeping quarters at north west section of cellar level.rem:discontinue illegal occupancy.
Jan 12, 2024 · Penalty $2,500
Active - Class - 1
Occupancy contrary to that allowed by dob records.illegal occupancy noted at cellar level north was section has been converted/occupied as sleeping quarters with 2 bedrooms and 3pcs bathroom/c toilet,sink and t
Jan 12, 2024 · Penalty $2,500
Active - Class - 1
Work without a permit.work noted:at cellar level north west section having erected full height partitions to create 2 bedrooms and 1 3pcs bathroom.installed plumbing waste and water lines for 3pcs bathroom.inst
Jan 12, 2024 · Penalty $2,500
Active - Class - 2
Car call button marked "b" in elevator car station kept inoperative by key. keep operative. no access to the elevator machine room. provide means of access with key to the elevator machine room.
Sep 9, 2021
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Jul 7, 2021 · Penalty $1,250
Resolve - Class - 2
Cat one tags out of date, provide up to date cat 1 tags
Feb 5, 2021 · Penalty $1,562
Resolve - Class - 1
97x17:97-x-17=entire device upon inspection remains inoperative for several weeks on a 6 story building creating a hazardous condition and ahassle to tenants,this is a recurring condition. remedy:repair and con
Jan 7, 2020
Resolve - Class - 1
Failure to provide unobstructed exit passageway.noted:apartment #44 amd 54 kitchen base cabinets and counter tops are obstructing the pathway to the fire-escape window.rem:remove obstruction.
Jun 2, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/v olation#35252940z issued on 02/08/18 and to file a certificate of cor ection pursuant to 28-201.1 and 1rcny 102-01.work without permit.note
Jun 2, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/ violation #35252940z issued on 02/08/18 and to file a certificate of correction pursuant to 28-201.1 & 1rcny102-01. work w/o a permit (apt
Apr 12, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/ violation #35317134z issued on 02/08/18 and to file a certificate of correction pursuant to 28-201.1 & 1rcny102-01. failure to provide un
Apr 12, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passage, at units #49 and 54. noted: kitchen base cabinets & countertops are obstructing pathway to fire escape window. rem: remove obstruction.
Feb 8, 2018 · Penalty $1,000
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35252940z issued on 04/26/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without permit in
Feb 8, 2018 · Penalty $6,000
Resolve - Class - 1
Work without a permit. failure to comply with the commissioner's order contained in summons/violation #35252940z issued 04/26/17 and to filecertificate of correction pursuant to 28-201.1 and 1rcny 102-01. note:
Dec 11, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to provide unobstructed exit passageway. failure to comply with the commissioner's order contained in summons/violation #32571509p issued on 06/22/17 and to file a certificate of correction pursuant to
Dec 11, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35252940z issued on 04/26/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. wokr w/o a permit. at apt#44 & 54 plumbing works for new kitche
Oct 27, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35271509p issued on 06/22/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway @ apt#44 & #54.
Oct 27, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/vio # 35252940z issued on 04/26/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit in apts 44 & 54 plumbing & f
Sep 23, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/vio # 35271509p issued on 06/22/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. obstruction @ fire escape windows in apt. 44 & 54
Sep 23, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/commissioners order contained in summons/violation#35271509p issued on 06/22/17 and to file a cofc pursuant to 28-201.1&1rcny 102-01.kitchen fire escape is obstructed.no cofc filed to show c
Aug 6, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply w/commissioners order contained in summons/violation#35252940z issued on 04/26/17 and to file a cofc pursuant to 28-201.1&1rcny 102-01.no permits pulled for the correction of violating conditi
Aug 6, 2017 · Penalty $2,400
Resolve - Class - 1
Kitchen escape windows obstructed apt#44 & apt 54. remedy: remove obstruction.
Jun 22, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35252940z issued on 4-26-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit @ apt#44& 54. remedy: comply w/comm's order &
Jun 22, 2017 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit. apt 54 has total renovation with changed layout newplumbing work for new kitchen with water,waste & gas lines,apt. 44 installed new kitchen with new plumbing work & new bathroom in both apts.
Apr 26, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: fire escape windows by the kitchen in apt. 44 & 54 are obstructed by the newly installed kitchen counter & ac's on windows. remedy: comply with summons. r
Apr 26, 2017 · Penalty $1,200
Resolve - Class - 2
09i11,67b10,15i11,100x07,40r09,70o02,39o02,40i10. 09i11-car floor dam aged tiles replace; 67b10-communication insufficient repair in car phone; 15i11-certificae frame damaged replace; 100x07-fire phase ii in
Oct 22, 2015 · Penalty $500
Active - Class - 2
09-i-11,67-b-07,15-m-07,37-e-07,99-bb-05,60-m-07,70-o-02,70-m-07:09-i-11-car fl damage replace tiles.67-b-07-communication insufficient provide phone.15-m-07-cert frame missing provide locn.37-e-07-overhead def
Jun 22, 2015 · Penalty $500
Active - Class - 2
02x10,11#01,37#01,39o02,16d06,52bb12,40#01,54m12,70#01,55b12. 02x-2waycommunication inoperable; 70#-comply w/section 8.1 (pit); 16c-secure all keepers on swing doors; 40#-comply with section 8.1 (machine room)
Apr 29, 2015 · Penalty $500
Active - Class - 2
50a.50b.50c.50d.50e.050a draft stat missing 50b chimney base not properly sealed 50c install correct support for flue pipe w/ threaded rod w/ channel for support 50d oil line not properly supported 50e fresh ai
Apr 14, 2009 · Penalty $250
Resolve - Class - 1
B154,51,32a,50,50a. 50 first flr collapsed into boiler room, boiler room in this condition is hazardous as there is no fire protection to tenant apts above boiler is sealed until repair are made. 50 missing ste
Oct 1, 2008 · Penalty $1,000
Resolve - Class - 1
B154,51,50. 50 first collapsed (flr) into boiler room leaving no fire protection for apts in bldg above boiler room.
Oct 1, 2008 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted:1-slab in apt 4 bathroom area collapsed into boiler room cellar level.2-no fire separation between boiler room & apt.remedy:repair and/or replace defects
Oct 1, 2008
Resolve - Class - 2
Failure to comply w/comm's order to file a certificate of correction w/dob sited in nov #34618378h. remedy: (file) certificate of correction.
Oct 1, 2008
Resolve - Hazardous
Failure to maintain on inspection 3pc bathroom fl has been removed fire rated material has been removed existing tub has been braled and toilet remove and bathroom left with open hole in place at apt 4 bathroom
May 31, 2008 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Feb 27, 2026 · Apt 33
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 1
Close - Flooring/stairs
Floor
Jan 21, 2026 · Apt 21
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 21
Close - Unsanitary condition
Mold
Jan 21, 2026 · Apt 21
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 33
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt 33
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 33
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt 33
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jan 16, 2025 · Apt 33
Close - Paint/plaster
Wall
Dec 11, 2024 · Apt 67
Close - Paint/plaster
Ceiling
Dec 11, 2024 · Apt 67
Close - Door/window
Door frame
Dec 11, 2024 · Apt 67
Close - Door/window
Window frame
Dec 11, 2024 · Apt 67
Close - Flooring/stairs
Floor
Dec 11, 2024 · Apt 67
Close - Safety
Fire escape
Dec 11, 2024 · Apt 67
Close - Paint/plaster
Wall
Nov 4, 2024 · Apt 44
Close - General
Cabinet
Nov 4, 2024 · Apt 44
Close - Flooring/stairs
Floor
Nov 4, 2024 · Apt 44
Close - Plumbing
Bathtub/shower
Oct 23, 2024 · Apt 46
Close - Paint/plaster
Wall
Oct 23, 2024 · Apt 46
Close - Plumbing
Bathtub/shower
Oct 15, 2024 · Apt 4
Close - Flooring/stairs
Floor
Oct 15, 2024 · Apt 4
Close - Plumbing
Basin/sink
Oct 15, 2024 · Apt 4
Close - Plumbing
Basin/sink
Oct 15, 2024 · Apt 4
Close - Heat/hot water
Apartment only
Oct 15, 2024 · Apt 4
Close - General
Cabinet
Sep 24, 2024 · Apt 44
Close - Flooring/stairs
Floor
Sep 24, 2024 · Apt 44
Close - Water leak
Heavy flow
Aug 30, 2024 · Apt 4
Close - Paint/plaster
Wall
Jul 22, 2024 · Apt 4
Close - Door/window
Window frame
Jul 22, 2024 · Apt 4
Close - Flooring/stairs
Floor
Jul 22, 2024 · Apt 4
Close - Plumbing
Bathtub/shower
Jul 22, 2024 · Apt 4
Close - Flooring/stairs
Floor
Jul 22, 2024 · Apt 4
Close - Electric
Outlet/switch
Jul 22, 2024 · Apt 4
Close - General
Cabinet
Jul 22, 2024 · Apt 4
Close - Door/window
Window frame
May 1, 2024 · Apt 4
Close - Door/window
Door
May 1, 2024 · Apt 4
Close - Flooring/stairs
Floor
May 1, 2024 · Apt 4
Close - Paint/plaster
Ceiling
May 1, 2024 · Apt 4
Close - Paint/plaster
Ceiling
May 1, 2024 · Apt 4
Close - Heat/hot water
Apartment only
Mar 26, 2024 · Apt 33
Close - Heat/hot water
Entire building
Mar 25, 2024 · Apt 33
Close - Heat/hot water
Apartment only
Feb 13, 2024 · Apt 46
Close - Heat/hot water
Entire building
Jan 29, 2024 · Apt 33
Close - Door/window
Door
Jan 24, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 5, 2024 · Apt 23
Close - Electric
Outlet/switch
Nov 20, 2023 · Apt 25
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1909
- Floors
- 6
- Residential units
- 39
- Building area
- 46,309 ft²
- Lot area
- 9,992 ft²
- Zoning
- R8
- Community board
- 112
- Council district
- 10
- Block / lot
- 2119 / 5
- Assessed value
- $1,395,450
- Landmark / historic district
- No
HPD registration #124016, last renewed Jul 9, 2025.
Questions about 3856 Broadway
Who owns 3856 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Gps 3850 LLC.
Does 3856 Broadway have violations?
Yes. NYC HPD has recorded 1,474 housing violations at this property.
Is 3856 Broadway rent stabilized?
NYC Department of Finance tax bills listed 36 rent-stabilized units here in 2024 (about 92% of its 39 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3856 Broadway built?
City records list 1909 as the year it was built.
How many apartments are in 3856 Broadway?
It has 39 residential units and 45 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.