550 West 156 Street
Manhattan, NY 10032BBL 1-02114-0018Map
Owner of record: Green Cloth Apartments Housing
550 West 156 Street is a walk-up apartment building built in 1896 in Manhattan, 10032. It has 13 residential units across 4 floors. The owner of record is Green Cloth Apartments Housing. HPD has recorded 92 housing violations here, most recently on January 3, 2025. 23 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 92
- DOB violations
- 20
- ECB violations
- 1
- HPD complaints
- 98
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 92
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 4th room from north located at apt 1, 1st story, 1st apartment from north at east
Jan 3, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 2, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 2, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jan 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jan 2, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jan 2, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jan 2, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 24, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 24, 2024 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 24, 2024 · Apt 2
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 24, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective bell and buzzer system from building entrance to panel at private hall east wall. in the entrance located at apt fl1, 1st story, 1st apartment from north at east
May 15, 2024 · Apt FL1
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell and buzzer system from building entrance to panel at east wall in the private hallway located at apt 1, 1st story, 1st apartment from north at east
May 15, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt 1, 1st story, 1st apartment from north at east
Jan 22, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the 4th room from north located at apt 1, 1st story, 1st apartment from north at east
Jan 22, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north located at apt flr1, 1st story, 1st apartment from north at east
Dec 5, 2023 · Apt FLR1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from north located at apt flr1, 1st story, 1st apartment from north at east
Dec 5, 2023 · Apt FLR1
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 5th room from north located at apt 1, 1st story, 1st apartment from north at east
Dec 4, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 5th room from north located at apt flr1, 1st story, 1st apartment from north at east
Dec 4, 2023 · Apt FLR1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 5th room from north located at apt 1, 1st story, 1st apartment from north at east
Dec 4, 2023 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 5th room from north located at apt flr1, 1st story, 1st apartment from north at east
Dec 4, 2023 · Apt FLR1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 5th room from north located at apt flr1, 1st story, 1st apartment from north at east
Dec 4, 2023 · Apt FLR1
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 5th room from north located at apt flr1, 1st story, 1st apartment from north at east
Dec 4, 2023 · Apt FLR1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 2, 2023 · Apt 2
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage disposal at public hall stairs, 4th story
Dec 2, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north and south walls in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Dec 2, 2023 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 2, 2023 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 5th room from north located at apt 2, 2nd story, 1st apartment from north at east
Dec 2, 2023 · Apt 2
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in drain pipe at sink in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Dec 2, 2023 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Dec 2, 2023 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west and south wall in the 2nd room from north located at apt flr1, 1st story, 1st apartment from north at east
Aug 29, 2023 · Apt FLR1
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Aug 23, 2023
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt flr1, 1st story, 1st apartment from north at east
Aug 23, 2023 · Apt FLR1
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of excessive heat in the entire apartment located at apt flr1, 1st story, 1st apartment from north at east
Aug 16, 2023 · Apt FLR1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling in the 1st room from north located at apt 3, 1st story, 2nd apartment from north at east
Aug 1, 2023 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at celing in the 1st room from north located at apt 3, 1st story, 2nd apartment from north at east
Aug 1, 2023 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at celing in the 1st room from north located at apt flr1, 1st story, 1st apartment from north at east
Aug 1, 2023 · Apt FLR1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt flr1, 1st story, 1st apartment from north at east
Aug 1, 2023 · Apt FLR1
Open — Notice of issuance sent to tenant - BHazardous
M/d law abate the nuisance consisting of heat on in summer in the entire apartment located at apt flr1, 1st story, 1st apartment from north at east
Jul 24, 2023 · Apt FLR1
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
May 24, 2023
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 4th room from north located at apt 1, 1st story, 1st apartment from north at east
May 24, 2023 · Apt 1
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 24, 2023
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... aprrox . 2 sq. ft at the ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east original violation 15999302 issued 24-may-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
May 24, 2023 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in the wasteline at sink in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
May 24, 2023 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall and the ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
May 24, 2023 · Apt 3
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... aprrox . 2 sq. ft at the ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
May 24, 2023 · Apt 3
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of slide bolt capable of being padlocked on the entrance door in the 1st room from north located at apt 1, 1st story, 1st apartment from north at east
Dec 21, 2022 · Apt 1
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed on door leading to the fire escape window in the 5th room from north located at apt 1, 1st story, 1st apartment from north at east
Dec 21, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Dec 21, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Dec 21, 2022
Closed — Violation dismissed
DOB building violations · 20
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Dec 19, 2000
V%*-dob violation - dismissed
Show 10 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 27, 1993
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jan 27, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 26, 1988
Dob violation - active
ECB violations · 1
- Non-hazardous
Altered building occupied without a valid certificate of occupancy alteration ub 13/86 remedy discontinue illegal use obtain a valid certificate of occupancy
Oct 26, 1988 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
Jun 13, 2026 · Apt 1
Close - Heat/hot water
Entire building
Mar 28, 2025 · Apt ALL
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 21, 2024 · Apt 2
Close - General
Bell/buzzer/intercom
Jul 16, 2024 · Apt FLR1
Close - General
Bell/buzzer/intercom
Apr 11, 2024 · Apt FL1
Close - General
Bell/buzzer/intercom
Apr 6, 2024 · Apt FL1
Close - General
Bell/buzzer/intercom
Apr 1, 2024 · Apt FL1
Close - General
Bell/buzzer/intercom
Mar 20, 2024 · Apt 1
Close
Show 40 more ↓
- Water leak
Slow leak
Jan 11, 2024 · Apt 1
Close - Electric
Lighting
Dec 23, 2023 · Apt 1
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt FLR1
Close - Water leak
Damp spot
Nov 25, 2023 · Apt FLR1
Close - Appliance
Electric/gas range
Nov 25, 2023 · Apt FLR1
Close - Paint/plaster
Wall
Nov 3, 2023 · Apt 2
Close - Unsanitary condition
Pests
Nov 3, 2023 · Apt 1
Close - Unsanitary condition
Pests
Nov 3, 2023 · Apt 2
Close - Safety
Smoke detector
Nov 3, 2023 · Apt 2
Close - Safety
Carbon monoxide detector
Nov 3, 2023 · Apt 2
Close - Paint/plaster
Wall
Nov 3, 2023 · Apt 2
Close - Paint/plaster
Wall
Nov 3, 2023 · Apt 1
Close - Outside building
Roof door/hatch
Nov 3, 2023 · Apt BLDNG
Close - Unsanitary condition
Garbage/recycling storage
Nov 3, 2023 · Apt BLDNG
Close - General
Janitor/super
Nov 3, 2023 · Apt BLDNG
Close - General
Signage missing
Nov 3, 2023 · Apt BLDNG
Close - Water leak
Damp spot
Oct 26, 2023 · Apt FLR1
Close - Unsanitary condition
Mold
Oct 26, 2023 · Apt FLR1
Close - Unsanitary condition
Mold
Oct 18, 2023 · Apt FLR1
Close - Water leak
Damp spot
Oct 18, 2023 · Apt FLR1
Close - Water leak
Damp spot
Oct 2, 2023 · Apt FLR1
Close - Unsanitary condition
Mold
Oct 2, 2023 · Apt FLR1
Close - Water leak
Damp spot
Sep 29, 2023 · Apt FLR1
Close - Unsanitary condition
Mold
Sep 29, 2023 · Apt FLR1
Close - Water leak
Damp spot
Sep 14, 2023 · Apt FLR1
Close - Unsanitary condition
Mold
Sep 14, 2023 · Apt FLR1
Close - Water leak
Damp spot
Sep 12, 2023 · Apt FLR1
Close - Water leak
Damp spot
Sep 5, 2023 · Apt FLR1
Close - Heat/hot water
Entire building
Aug 21, 2023 · Apt FLR1
Close - Water leak
Damp spot
Aug 21, 2023 · Apt FLR1
Close - Water leak
Damp spot
Aug 15, 2023 · Apt FLR1
Close - Heat/hot water
Entire building
Aug 15, 2023 · Apt FLR1
Close - Heat/hot water
Entire building
Aug 10, 2023 · Apt FLR1
Close - Water leak
Damp spot
Aug 10, 2023 · Apt FLR1
Close - Unsanitary condition
Mold
Jul 28, 2023 · Apt FLR1
Close - Water leak
Damp spot
Jul 28, 2023 · Apt FLR1
Close - Water leak
Damp spot
Jul 25, 2023 · Apt FLR1
Close - Heat/hot water
Entire building
Jul 22, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Jul 17, 2023 · Apt FLR1
Close - Water leak
Heavy flow
Jul 16, 2023 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1896
- Floors
- 4
- Residential units
- 13
- Building area
- 4,420 ft²
- Lot area
- 1,699 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2114 / 18
- Assessed value
- $245,250
- Landmark / historic district
- No
HPD registration #122671, last renewed Oct 9, 2025.
Questions about 550 West 156 Street
Who owns 550 West 156 Street?
The owner of record in NYC Department of City Planning PLUTO data is Green Cloth Apartments Housing.
Does 550 West 156 Street have violations?
Yes. NYC HPD has recorded 92 housing violations at this property.
Is 550 West 156 Street rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 31% of its 13 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 550 West 156 Street built?
City records list 1896 as the year it was built.
How many apartments are in 550 West 156 Street?
It has 13 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.