706 Riverside Drive
Manhattan, NY 10031BBL 1-02094-7501Map
Owner of record: The 706 Riverside Condominum
706 Riverside Drive is a condominium built in 1913 in Manhattan, 10031. It has 51 residential units across 10 floors. The owner of record is The 706 Riverside Condominum. HPD has recorded 996 housing violations here, most recently on July 21, 2026. 40 of the 50 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 996
- DOB violations
- 20
- ECB violations
- 73
- HPD complaints
- 5,309
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 996
- BHazardous
Properly repair or replace the broken or defective escutcheon plate at top and bottom of heat riser in the 3rd room from east located at apt 1a, 1st story, 1st apartment from north at east
Jul 21, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 1a, 1st story, 1st apartment from north at east
Jul 21, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective escutcheon plate at top and bottom of heat riser in the 1st room from east located at apt 1a, 1st story, 1st apartment from north at east
Jul 21, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1a, 1st story, 1st apartment from north at east
Jul 21, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Jul 21, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 6e, 6th story, 1st apartment from south at west
Jun 17, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from east located at apt 6e, 6th story, 1st apartment from south at west
Jun 17, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, the west wall, the south wall, the north wall, and the ceiling in the kitchen located at apt 6e, 6th story, 1st apartment from south at west
Jun 17, 2026 · Apt 6E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
May 17, 2026 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north located at apt 9a, 9th story, 1st apartment from north at east
May 12, 2026 · Apt 9A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at north located at apt 9a, 9th story, 1st apartment from north at east
May 12, 2026 · Apt 9A
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 7e, 7th story, 1st apartment from south at west
Apr 16, 2026 · Apt 7E
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 7e, 7th story, 1st apartment from south at west
Apr 16, 2026 · Apt 7E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window at south wall in the kitchen located at apt 7e, 7th story, 1st apartment from south at west
Apr 16, 2026 · Apt 7E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wall cabinet at east in the kitchen located at apt 2c, 2nd story, 4th apartment from south at west
Apr 16, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from east located at apt 2c, 2nd story, 1st apartment from west at north
Mar 7, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 2nd bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Mar 7, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north
Mar 7, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq feet at ceiling and west wall in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north
Mar 7, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Mar 7, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sqft at ceiling and north wall in the 2nd room from east located at apt 2c, 2nd story, 1st apartment from west at north
Mar 7, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater then 30 sqft at ceiling and west wall in the 2nd bathroom from east located at apt 2c, 2nd story, 1st apartment from west at north
Mar 7, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 7e, 7th story, 1st apartment from south at west
Feb 25, 2026 · Apt 7E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 7e, 7th story, 1st apartment from south at west
Feb 25, 2026 · Apt 7E
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 7e, 7th story, 1st apartment from south at west
Feb 25, 2026 · Apt 7E
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at the ceiling light fixture and all wall electrical outlets in the 1st room from east located at apt 7e, 7th story, 1st apartment from south at west , section at west
Jan 29, 2025 · Apt 7E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window casing in the 1st room from east at north located at apt 7e, 7th story, 1st apartment from south at west
Jan 11, 2025 · Apt 7E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7e, 7th story, 1st apartment from south at west
Dec 9, 2024 · Apt 7E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east
Oct 24, 2024 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from north located at apt 2c, 2nd story, 1st apartment from north at east
Oct 24, 2024 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 2c, 2nd story, 1st apartment from north at east
Oct 24, 2024 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 7e, 7th story, 4th apartment from south at west
Sep 25, 2024 · Apt 7E
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 7e, 7th story, 4th apartment from south at west
Sep 25, 2024 · Apt 7E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 7e, 7th story, 4th apartment from south at west
Sep 25, 2024 · Apt 7E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 7e, 7th story, 1st apartment from west at north
Sep 23, 2024 · Apt 7E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 7e, 7th story, 1st apartment from west at north
Sep 23, 2024 · Apt 7E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 7e, 7th story, 1st apartment from west at north
Sep 23, 2024 · Apt 7E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 7e, 7th story, 1st apartment from south at west
Aug 28, 2024 · Apt 7E
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 7e, 7th story, 1st apartment from south at west
Aug 28, 2024 · Apt 7E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd bathroom from east located at apt 7e, 7th story, 1st apartment from south at west
Aug 28, 2024 · Apt 7E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 7e, 7th story, 1st apartment from south at west
Aug 28, 2024 · Apt 7E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from east at north located at apt 9a, 9th story, 1st apartment from north at east
Jul 3, 2024 · Apt 9A
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing , door stopper at vestibule door at public hall, 1st story
Jul 3, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing , door stopper at building front entrance door , 1st story
Jul 3, 2024
Closed — Violation closed - BHazardous
Refit entrance door in the entrance located at apt 7e, 7th story, 1st apartment from south at west
May 24, 2024 · Apt 7E
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame in the entrance located at apt 7e, 7th story, 1st apartment from south at west
May 24, 2024 · Apt 7E
Closed — Violation closed - BHazardous
Repair the broken or defective connection drain pipe at sink in the kitchen located at apt 9a, 9th story, 1st apartment from north at east
Oct 11, 2023 · Apt 9A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from east located at apt 9a, 9th story, 1st apartment from north at east
Oct 11, 2023 · Apt 9A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 9a, 9th story, 1st apartment from north at east
Oct 11, 2023 · Apt 9A
Open — Nov sent out
DOB building violations · 20
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 22, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 20, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed
Show 10 more ↓
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2014
Sep 1, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2015)
Sep 1, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 8, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2011
Dob violation - resolved - Elevator elevatorrequired
(10) provide elev door switch. (51) proovide toe guard. (52) cover all spince in shaft (53) provide cut off switch fon elev when not in use (file for key sw) (54) repair parking lock
Dec 10, 1988
Dob violation - resolved - Elevator elevatorrequired
(51) cease use until items 11 and 12 are completed with. (52) provide capacity plate in cab
Dec 10, 1988
Dob violation - resolved
ECB violations · 73
- Class - 2
At the time of inspection of a 10-story building, i observed sidewalk shed in place exp#1-2, during my inspection i noticed sidewalk shed has no building information panel. this create a hazardous situation for
Sep 3, 2026 · Penalty $1,250
Active - Class - 2
At the time of inspection of a 10-story building, i observed a sidewalk shed erected exp#1-2 not maintained as per bc 3307.6.5.5 cleaning, sidewalk shed deck not clean free of debris, equipment and materials le
Sep 3, 2026 · Penalty $2,400
Active - Class - 1
Atoi observed exterior of 10-story dwelling at exposure 1. construction in progress under job #m00957826 with workers on suspended scaffold performing work. windows not sealed and ac units vents not covered, in
Apr 24, 2026 · Penalty $5,000
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #907037.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building facade and appurtenances.note:asprevious violation#35669182m issued on 10-14-2022 as today time of inspection observed at exposures 2,3,4 west,north,east elevation cracks,s
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to maintain. noted at apts 9e, 8e, 7e, 6e rear bedrooms at right side, ceilings in disrepair, drywall has become detached at the joints and shows water damage; apts 8e and 4e bathroom ceilings in disrep
Nov 29, 2022 · Penalty $625
Active - Class - 2
Failure to maintain exterior building facade & appurtenances.as of today time of inspection observed at exp #2 #3 #4(west,north,east elevations) cracks,spalled bricks & coating in several locations at roof obse
Oct 14, 2022 · Penalty $1,250
Active - Class - 1
Failure to repair swarmp conditions in timely manner.note:as of today 10/14/22 time of inspection owner failed to repair conditions of cracks,spalled brick,spalled terra cotta,missing/crack coping stone at seve
Oct 14, 2022 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code complaint manner i observed on the 10 floor apartment 10 a lack support on the gas line by the gas meter, repair and/replace
Sep 13, 2022
Resolve - Class - 1
Failure to maintain building in code complaint manner i observed on 8 floor in apartment 8c in the kitchen area lack support on gas line, repair and/replace
Sep 6, 2022 · Penalty $1,250
Active
Show 40 more ↓
- Class - 1
Work w/o permit.noted:during inspection of at #8a observed worker drilling incisions/openings throughout apt walls for new electrical install consisting of new running bx cable electrical wire in ceiling walls
Mar 14, 2022
Resolve - Class - 2
Water piping not capped-water column blow down valve handle broken-water piping not supported- body drains not installed; correct all violating conditions, submit a certificate of correction.
Apr 30, 2020
Resolve - Class - 3
Work does not conform to approved construction documents and or approved amendments. at time of inspection approved plans provided for job#123790503 shows a smoke soffit separating the kitchen and living area.
Feb 28, 2020
Resolve - Class - 1
Filed a certificate for, application etc. containing a material false statement(s) noted the owner/representative made false certification on section #26 of pwi joe application 12353940 9/12/18 by check marking
Nov 12, 2018
Resolve - Class - 2
Temporary construction equipment on site expired permit. note:observedsidewalk shed is in place sidwalk shed permit #140188375 is expired on 5/6/17. renew permit.
Oct 30, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in sum/vio#35249537l issued on 08/23/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway: noted: at exp#2&3
Sep 30, 2017
Resolve - Class - 1
3307.6.5.3 failure to maintain sidewalk shed in order. noted: at time of inspection a few parapet panels for the sidewalk shed fell off, a few are loose. rem: maintain sidewalk shed in order
Sep 12, 2017 · Penalty $1,600
Resolve - Class - 2
Failure to maintain as per 3307.6.5.3.note:at time of inspection i observed sidealk shed in place not maintained.light bulbs not all in working condition.parapet on ground not in place.rem:comply with code main
Sep 8, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to provide sidewalk shed parapet sign.noted:at time of inspection sidewalk shed missing parapet sign accordign to 3301.9.2.itmust contain the address of the site,name of the contractor responsible for
Aug 30, 2017 · Penalty $800
Resolve - Class - 2
Temporary construction equipment on site-expd permit.noted;at time of inspection permit for the sidewalk shed expd on 5/6/17.recurring condition.previous summs#35259662j issued on 7/13/17.rem:renew shed permit
Aug 30, 2017 · Penalty $2,000
Resolve - Class - 2
Sidewalk shed doesn't meet code specs. observed a non permitted sidewalk erected extending approx 120ft l on exp#1, @ the corner of exp.#1 &4 the shed extended approx. 11ft of front of bldg & is missing a secti
Aug 23, 2017 · Penalty $2,400
Resolve - Class - 2
Work w/o a permit. observed @ exp. 1 approx. 120 linear ft of sidewalkshed erected extending approx. 11ft off front of bldg @ corner of exp.1 & 4 (missing a section approx. 3ft x 4ft) & @ exp. 1 & 2 corner exte
Aug 23, 2017 · Penalty $800
Resolve - Class - 1
Failure to provide unobstructed exit passageway: observed in rear of courtyard of bldg @ corner @ exp. #2 & 3 stairs leading to street,for rear fire escapes to exit,blocked on stairs by bags of garbage & a larg
Aug 23, 2017
Resolve - Class - 2
Temporary construction equipment on site expried permit. note:observedsidewalk shed is in place. sw shed permit #140188375-01-eq-sm expired on 05=06-2017. rmdy: renew permit.
Jul 13, 2017 · Penalty $400
Resolve - Class - 2
Scaffold training certificate card not readily available for inspection.note:at time of inspection 4 workers on 2 suspended scaffolds where not able to provide proper suspended scaffold safety documentation.wor
Jun 16, 2017 · Penalty $2,000
Resolve - Class - 1
Sec. 3314.4.2.4 partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises. designated foreman is not on site. noted: at time of inspection suspended scaffold being used at exp#4 w/o desig
Dec 2, 2016
Resolve - Class - 2
Sec. 3314.6.2 failure to protect life line from sharp edges & abrasion. note: at time of inspection i observed life line for scaffold on exp#3 was not protected from sharp edges & abrasion. remedy: comply w/cod
Dec 2, 2016
Resolve - Class - 2
Partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises. failure to provide approved plans. noted: at time of inspection no approved plans(c-d5)is on site. job site is active. men worki
Dec 2, 2016
Resolve - Class - 2
Sec. 3314.4.5 scaffold training certificate card not readily avalible for inspection. noted: at time of inspection following workers: rajinder kumar & alfredo dutin who working on suspended scaffold failed to
Dec 2, 2016
Resolve - Class - 2
Sec. 3307.6.5.3 failure to maintain sidewalk shed. noted: at time of inspection several lights for sidewalk shed are out of order including red light that indicates sprinkler system hydrant. remedy: maintain
May 24, 2016 · Penalty $830
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. noted: alt-2 #121890882 issued 11/23/15 exp 11/20/16 for repair facade/bricks concrete etc. noted 2 workers observed at pulley
May 12, 2016
Resolve - Class - 2
Partial stop work order for suspended scaffold issued pursuant to 28-207.2 & posted at premises. installation/use of suspended scaffold w/o a notification. note: observed suspended scaffolds in correction w/out
Mar 25, 2016 · Penalty $400
Resolve - Class - 2
Temporary construction equipment on site expired permit.noted @ time of inspection permit for sidewalk sued @ exp1 & 2 expired on 4/23/15.rem:renew the permit
Apr 28, 2015
Resolve - Class - 2
3314.4.8,maintenance of supported scaffold.noted:@ time of insp safetynetting for supported scaffold @ exp#1 & #2 is torn/detached.rem:maintain supported scaffold.
Apr 23, 2015 · Penalty $400
Resolve - Class - 1
Failure to safeguard all person and property affected by construction operation note at time of inspection observes supported scaffolding ontop of sidealk shed under permit #140197123,netting torn loose unsecur
Apr 17, 2015 · Penalty $1,200
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical reports in compliance w/ code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dept of bldg rules & regulations.rem:
Aug 24, 2014
Resolve - Class - 1
Pswo(supported scaffold)issued pursuant to 28-207.2 posted erected supported scaffold w/o a scaffold on cert of completion noted the following workers erecting supported scaffold on exp#1 did not have 32 hr ere
Aug 1, 2014 · Penalty $2,400
Resolve - Class - 2
Sidewalk shed parapet panel is not provided.noted:@ time of insp sidewalk shed @ exp#1 & #2 missing sidewalk shed parapet panel.rem:comply w/ code.
Jun 6, 2014 · Penalty $4,000
Resolve - Class - 2
59h11,57j01,56y10,56o02,56bl10,42g11,42al10,61m07,05l10,32j01,10l11,67l10. 59-linings; 57-hoist motor vibrating; 56-oil leak; 56a-clean; 56b-noise in gear box; 42-wrong size fuses in controller; 42a-relay ar
Oct 29, 2013 · Penalty $500
Resolve - Class - 2
Failure to maintain building in a code compliant manner: noted: side entrance to building on west 148th street does not have handrails at front entrance door: there are 2 steps w/o a landing. steps are greater
Aug 18, 2012 · Penalty $500
Active - Class - 2
Sec. 27-292.1, 1107.6.1.3. people w/physical disabilities - failure toprovide adequate access. failure to provide handicap landing at door entrance. remedy: maintain bldg as per code.
Jun 1, 2012 · Penalty $800
Resolve - Class - 2
28-301.1:failure to maintain building in code compliant manner. no toplanding for exterior ramp as per bc 1010.6.1 thru 1010.6.5. noted:at main entry steel access ramp installed without required top landing as
Jan 28, 2012 · Penalty $800
Resolve - Class - 1
1105.1 people w/physical disabilities def. mech.noted:new wheel-cha ir lift has defective inclined plane ramp-not to code,too small w/ split level.remedy:comply w/ notice of violation.
Jun 30, 2010
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dob.noted:respondent failed to comply w/ the commis sioner's order to correct the violating condition(s) & file a certific
Jun 30, 2010
Resolve - Class - 1
People w/ physical disabilities defective mechanism etal not to code noted new wheel chair lift installed under appl ea 2187/08 found w/ defective incline plane ramp being not to code too small w/ split level
Feb 5, 2010
Resolve - Class - 3
Fence exceeds the permitted height defects noted: at right of bldg entry found w/a 12'-0" fence installed w/door for access to basement corridor at right which exceeds the permitted height for residential which
Dec 29, 2009 · Penalty $100
Resolve - Class - 2
Work w/o a permit illegal work noted iron ramp found installed @ sidewalk area @ right of front courtyard encroaching citys sidewalk used to provide access to entry to bldg for people w/ physical disabilities
Dec 29, 2009 · Penalty $800
Resolve - Class - 3
Misc 27-308(b)installation of non-compliant handicap access ramp.notedpre 1987 bldg w/replaced entry door has steel hc access ramp approx 8'long which terminates @entry door approx 9"above court yard fl w/o the
Sep 15, 2009 · Penalty $300
Resolve - Class - 2
Work without a permit. on inspection wheel chair ramps have been installed approx 25' linear feet, 1st ramp in front of entrance door approx 5' long directly in front without a landing. 3rd ramp with guardrail
Nov 25, 2008 · Penalty $800
Resolve - Class - 2
52b14.53b14.98m05.99m05.42r08.11.32h10.39m07.15m07. 52b14 hoist ropes ct/w to springs 3"-4" existing 53b14 gov ropes need shorten tension weight too low 98,99 m-05 5yr 2yr missing on gov 42r09,11 remove jumper
Aug 8, 2008 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt 4D
Open - Heat/hot water
Entire building
Oct 19, 2026 · Apt 7E
Close - Heat/hot water
Entire building
Oct 17, 2026 · Apt WHOLEB
Close - Heat/hot water
Entire building
Oct 17, 2026 · Apt 7E
Close - General
Janitor/super
Sep 1, 2026 · Apt 7EITSN
Close - General
Janitor/super
Aug 22, 2026 · Apt 7E
Close - Flooring/stairs
Floor
Jun 17, 2026 · Apt 7E
Close - Plumbing
Water supply
Jun 15, 2026 · Apt 7E
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jun 15, 2026 · Apt 6E
Close - Plumbing
Water supply
Jun 15, 2026 · Apt 6E
Close - Water leak
Heavy flow
Jun 15, 2026 · Apt 6E
Close - Unsanitary condition
Pests
Jun 1, 2026 · Apt 1A
Close - Door/window
Door
May 26, 2026 · Apt BLDG
Close - Water leak
Heavy flow
May 13, 2026 · Apt 2C
Close - Paint/plaster
Wall
May 13, 2026 · Apt 2C
Close - Unsanitary condition
Mold
May 13, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
May 13, 2026 · Apt 2C
Close - Paint/plaster
Wall
May 12, 2026 · Apt 2C
Close - Unsanitary condition
Mold
May 12, 2026 · Apt 2C
Close - Water leak
Heavy flow
May 12, 2026 · Apt 2C
Close - Unsanitary condition
Pests
May 11, 2026 · Apt 1A
Close - Unsanitary condition
Pests
May 11, 2026 · Apt 1A
Close - Door/window
Window frame
Apr 2, 2026 · Apt 9A
Close - Paint/plaster
Ceiling
Apr 2, 2026 · Apt 9A
Close - Paint/plaster
Window/frame
Apr 2, 2026 · Apt 9A
Close - Paint/plaster
Ceiling
Apr 2, 2026 · Apt 9A
Close - Water leak
Damp spot
Apr 2, 2026 · Apt 9A
Close - General
Bell/buzzer/intercom
Mar 27, 2026 · Apt 7E
Close - Door/window
Door
Mar 27, 2026 · Apt 7E
Close - Plumbing
Toilet
Mar 27, 2026 · Apt 7E
Close - Door/window
Window frame
Mar 27, 2026 · Apt 7E
Close - Plumbing
Basin/sink
Mar 27, 2026 · Apt 7E
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 7E
Close - Door/window
Window frame
Feb 7, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt 7D
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Plumbing
Toilet
Feb 7, 2026 · Apt 7E
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 7E
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Feb 6, 2026 · Apt 2C
Close - Paint/plaster
Wall
Feb 6, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Feb 6, 2026 · Apt 2C
Close - Water leak
Heavy flow
Jan 27, 2026 · Apt 2C
Close - General
Cabinet
Dec 21, 2025 · Apt 2C
Close - Paint/plaster
Ceiling
Dec 21, 2025 · Apt 2C
Close - Unsanitary condition
Mold
Dec 21, 2025 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R4)
- Year built
- 1913
- Floors
- 10
- Residential units
- 51
- Building area
- 67,447 ft²
- Lot area
- 10,492 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 2094 / 7501
- Assessed value
- $5,301,460
- Landmark / historic district
- No
HPD registration #106432, last renewed Dec 3, 2025.
Questions about 706 Riverside Drive
Who owns 706 Riverside Drive?
The owner of record in NYC Department of City Planning PLUTO data is The 706 Riverside Condominum.
Does 706 Riverside Drive have violations?
Yes. NYC HPD has recorded 996 housing violations at this property.
Is 706 Riverside Drive rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 35% of its 51 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 706 Riverside Drive built?
City records list 1913 as the year it was built.
How many apartments are in 706 Riverside Drive?
It has 51 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.