3489 Broadway
Manhattan, NY 10031BBL 1-02089-0033Map
Owner of record: 3489 Broadway LLC
3489 Broadway is an elevator apartment building built in 1910 in Manhattan, 10031. It has 79 residential units across 10 floors. The owner of record is 3489 Broadway LLC. HPD has recorded 957 housing violations here, most recently on October 16, 2026. 7 of the 50 most recent violations are still open. City tax records listed 43 rent-stabilized apartments here in 2024.
- HPD violations
- 957
- DOB violations
- 75
- ECB violations
- 95
- HPD complaints
- 2,314
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 957
- BHazardous
Properly repair with similar material the broken or defective upper and lower refrigerator door rubber gasket in the kitchen located at apt 88, 8th story, 2nd apartment from south at west
Oct 16, 2026 · Apt 88
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 2nd room from east located at apt 57, 5th story, 1st apartment from west at north
Oct 2, 2026 · Apt 57
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 57, 5th story, 1st apartment from west at north
Oct 2, 2026 · Apt 57
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 57, 5th story, 1st apartment from west at north
Aug 28, 2026 · Apt 57
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling and west wall in the bathroom located at apt 36, 3rd story, 2nd apartment from west at north
May 20, 2026 · Apt 36
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at south bulkhead door to roof
May 20, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of a slide bolt with eye, capable of being padlock installed at the door in the entrance located at apt 54, 5th story, 1st apartment from south at west
May 20, 2026 · Apt 54
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at north bulkhead door to roof
May 20, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 41, 4th story, 2nd apartment from north at east
Apr 26, 2026 · Apt 41
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 41, 4th story, 2nd apartment from north at east
Apr 26, 2026 · Apt 41
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 53, 5th story, 1st apartment from east at south
Feb 22, 2026 · Apt 53
Open — False certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 53, 5th story, 1st apartment from east at south
Feb 22, 2026 · Apt 53
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at south and west wall in the bathroom located at apt 83, 8th story, 1st apartment from east at south
Aug 4, 2025 · Apt 83
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles floor in the kitchen located at apt 83, 8th story, 1st apartment from east at south
Aug 4, 2025 · Apt 83
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 83, 8th story, 1st apartment from east at south
Aug 4, 2025 · Apt 83
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 83, 8th story, 1st apartment from east at south
Aug 4, 2025 · Apt 83
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 83, 8th story, 1st apartment from east at south
Aug 4, 2025 · Apt 83
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at south and west wall in the bathroom located at apt 83, 8th story, 1st apartment from east at south original violation 18133770 issued 04-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 4, 2025 · Apt 83
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
Provide a mirror in self-service elevator arranged so as to enable a person entering, to view inside of elevator number at south at public hall, 1st story
Sep 4, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 5th story
Sep 4, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at chute hopper door at public hall, 1st story
Sep 4, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at chute hopper door at public hall, 1st story
Sep 4, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at chute hopper door in compactor closet at public hall, 5th story
Sep 4, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color closet ceiling and all walls in the private hallway located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Refit door at entrance in the bathroom located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroom located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet at wash/basin in the bathroom located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wood floor in the 2nd room from north located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper and lower cabinets at east wall in the kitchen located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at chute hopper door in compactor closet at public hall, 5th story
Sep 4, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective vinyl floor tiles in the kitchen located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective vinyl floor tiles in the private hallway located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 53, 5th story, 1st apartment from east at south
Sep 4, 2024 · Apt 53
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilng and all walls in the kitchen located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet door, at sink in the kitchen located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of glazing at the bathtub in the bathroom located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electric outlet at north wall in the kitchen located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceilng and all walls in the 5th room from east located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at at ceiling in the private hallway located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in east closet in the private hallway located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 53, 5th story, 1st apartment from east at south
Aug 28, 2024 · Apt 53
Closed — Violation dismissed
DOB building violations · 75
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 16, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 21, 2024
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 21, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 16, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 16, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Nov 7, 2018
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 8, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 8, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 8, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 25, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 25, 2013
Dob violation - dismissed - Construction other optional
Unlawfully continue work while on notice (more)
Apr 4, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Aug 24, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2009
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 21, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 14, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 14, 2003
Dob violation - resolved - Elevator elevatorrequired
1p10179
Jul 16, 2002
Dob violation - resolved - Elevator elevatorrequired
1p10173
Jul 16, 2002
Dob violation - resolved - Elevator elevatorrequired
1p10173
May 7, 2001
Dob violation - resolved
ECB violations · 95
- Class - 2
Vf... hoist machine brake maintenance tag expired provide.... maintenance log update missing provide...
Dec 2, 2025
Resolve - Class - 2
Vf... hoist machine brake maintenance tag expired provide.. maintenance log updating missing provide... hoist way door misalignment adjust...
Dec 2, 2025
Resolve - Class - 2
Failure to maintain exterior building facade on exposure(3) missing brick on 1st floor, damaged roof copings, and missing coping metal in the roof. remedy: maintain exterior facade and appurtenances as per 1rcn
Sep 25, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note: (1)hairline crack at masonry watertable at exp #1(east). (2)sagging lintel and deteriorated mortar at 10th story of exp #4 north. remedy: ma
Aug 16, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. note: observed (1)at expsoure #1(east elev.) opened deteriorated mortar joint at terracotta decorative stone cornice between 7th floor and roof. a
Aug 7, 2024
Resolve - Class - 1
Failure to maintain exterior building facade & appurtenances:at time of inspection observed hazardous conditions 1) opened/deteriorated mortar joint at terracotta decorative cornice at exp #1(east elevation)2)
Jun 17, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#807025.agg1:prior nov 37022037l under 28-302.5
Jan 16, 2024 · Penalty $3,125
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #907025.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#807025.remedy:file acceptable report.
Oct 8, 2021 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in controller as mandated in appendix k of the 2014 building code. remedy: install dlm, file and perform test with nyc dob
Aug 19, 2021 · Penalty $3,125
Resolve
Show 40 more ↓
- Class - 1
No door lock monitoring installed in controller as mandated in appendix k of the 2014 building code. remedy: install dlm, file and perform test with nyc dob
Aug 19, 2021 · Penalty $3,125
Resolve - Class - 2
Removal of sidewalk shed and other safety measures without department approval at the time of inspection the building facade was still designated as unsafe this terminal report (tr1) filed by pe/ra on 01-17-21
Jan 25, 2021 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application, install dlm, and perf
Oct 23, 2020 · Penalty $3,125
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application, install dlm, and perf
Oct 23, 2020 · Penalty $3,125
Resolve - Class - 1
1 .no door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dl
Jun 15, 2020 · Penalty $3,125
Resolve - Class - 1
No door lock monitoring installed in this controller
Jun 15, 2020 · Penalty $3,125
Resolve - Class - 2
Bc3307.6.5.6/sharp edges.where located in an area that could pose a danger to the public,bolts and screws without a cap,and sharp edges.shall be protected to prevent injury to the public.noted:at time of inspec
Sep 4, 2019
Resolve - Class - 1
Failure to provide and take adequate safety measures where required tosecure and protect public safety from documented unsafe notification of building facade as per 1rcny-103-04. remedy:provide adequate safety
Oct 30, 2018 · Penalty $10,000
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. noted: observed that the work is installing electric wiring thru out the entire apt# 21 work is being perform against partial stop work order# 353
Jun 20, 2018 · Penalty $12,500
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#807025. remedy: submit required technical report
May 18, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements: noted: @ time of insp in cellar observed excessive construction debris creating a tripping & possible fire hazard. rem: maintain adequate hous
May 10, 2018 · Penalty $625
Resolve - Class - 1
Electrical work w/out a permit. noted: @ time of insp @ apts 21 & 25. removed existing electrical system including circuit breaker panels wiring lights & boxes for power & switch. replaced same to accomidate ne
May 10, 2018 · Penalty $800
Resolve - Class - 1
Unapproved,unsafe,unsuitable electrical equipment,appliances,apparatus,materials or wiring. noted: @ apts 27,82,88,95 & 97 observed no gfci protection in bathrooms,kitchens near sinks, creating a possible shock
May 10, 2018 · Penalty $800
Resolve - Class - 2
40o02,39x10,60x10,37b07,68b07,70o02,55m07. 39x car top light.37b comply with section 8.1 overhead alarmed.68b update log.55m reshackle tag.
Feb 15, 2018 · Penalty $1,250
Resolve - Class - 2
17d06,23x10,39x10,37b07,70o02,68b07. 17d lobby door.23 elevator not responding to hall button calls except for basement.repair 39x light inoperative.37b comply with section 8.1 overhead(alarmed).68b update log.
Feb 15, 2018 · Penalty $1,250
Resolve - Class - 2
97x10 return elevator to service
Jan 10, 2018
Resolve - Class - 2
Failure to provide approved plans at job site at time of inspection. noted: in 1st fl & cellar level observed construction work going on as per job#121380941 however no approved plans present in the for inspect
Aug 1, 2016
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in nov# 35166796m issued on 04/04/16 & to file a c of c pursuant to 28-201.1, 28-204.4 & 1rcny 102-01. no compliance recorded, no related permits obtained
May 20, 2016 · Penalty $2,430
Resolve - Class - 1
Work w/o a permit. work noted: at cellar level observed construction work going on in the apt w/o permit. work as: 1)new full partition erected & new bathrooms & new kitchen. 2)in the 2 bathrooms observed new
Apr 4, 2016 · Penalty $1,600
Resolve - Class - 2
04l10,05m07,39o02,41l06,70o02,100l11. 05-door open button; 05-zone restrictor; 100-toeguard
Jan 13, 2015 · Penalty $500
Resolve - Class - 2
97x10, 110l10. 97-return to service; 100-cover open circuit breaker box in motor room.
Feb 11, 2014 · Penalty $2,500
Resolve - Class - 2
14m07,12q03,61l10,54l12,55l12. 14-car mirror; 12-car lights unguarded;61-machine disconnect; 54,55 redo cable ends drum machine.
Oct 9, 2013
Resolve - Class - 1
Failure to comply w/commissioner's order contained in nov#35004199m issued on 1/24/13.remove celalr stairs & install new one.demolish apts @1st flr work done w/o permit. rmdy: comply w/commissioner's order.
May 7, 2013 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit: noted in apt #4s electrical fuse box has been removed and new circuit breaker panel has been installed new switches & receptacle and cable has been installed. at kitchen also pass through has
Feb 8, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. improper exit/exit access doorway arrangement per bc 1014.2;27-361. noted: at 1st flr stairs to cellar removed therefore eliminating egress from cellartostreet
Jan 25, 2013 · Penalty $1,200
Resolve - Class - 1
Work w/o a permit. work noted: 1) removed stair between lobby and cellar. 2) extended commercial spaces. 3) removed walls, plumbing & electric & demolished apts at 1st stry. 4) new stair installed between 1st
Jan 24, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to take & provide safety measures where required to protect & secure public safety from unsafe facade as per 1rcny 103-04. facade technical report file unsafe by pe/fa on 8-24-12. remedy: provide & take
Oct 11, 2012 · Penalty $2,400
Resolve - Class - 2
Sec. 28-302.5. failure to erect safety measures to protect the public from haz conditions. noted: at site no safety measure has been installed after submitting a fisp 3: notification of unsafe conditions (form)
Jul 31, 2012 · Penalty $800
Resolve - Class - 2
Sec. 28-302.5 failure to provide safety measures,sidewalk shed where required according to the cycle #6 technical report file as unsafe. *east elevation (exposure #2) observe deteriorating & broken off masonry
Sep 22, 2011
Resolve - Class - 2
Failure to maintian.defect is plaster ceiling is broken,cracked and sections are missing due to water leak above 1st flr.store.remedy:immediately repair defect.
Jul 21, 2011 · Penalty $250
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36013967r. remedy: file an amended report following
Jun 14, 2011
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98report.rem:file an amended report following remedial
Aug 27, 2010
Resolve - Class - 2
Failure to maintain exterior bldg. east elevation observed blocks of wood under ac unit on upper facade (entrance court yard); masonry center block under ac unit (north end). south elevation observed bricks
May 26, 2010 · Penalty $500
Resolve - Class - 2
56y13.68m7.69m7.80b14.33u12.11x10. 56y repair and seal glass packing 33u reshackle cwt shackles 372 repair roof in overhead 11x repair lighton push button station in car
Mar 29, 2010 · Penalty $2,500
Resolve - Class - 2
68m7.69m7.70o2.33u12.100b6.67x10.81o2.33u reshackle cwt shackles 10b secure car saddle 67x repair phone system in car 11x repair light on pish button station 216m provide missing sute guards on b 1 on fls 16b
Mar 29, 2010 · Penalty $2,500
Resolve - Class - 1
Inadequate safety measures operation of hoisting equipment in unsafe anner. (3 men on suspended scaffold off outrigger beams) rem: discontinue use.
Jul 15, 2009
Resolve - Class - 1
Failure to provide unobstructed exit passageway - rear yard north exitgate is secured by padlock and chain. remedy: remove obstructions - install hardware as per code.
Mar 12, 2009 · Penalty $1,200
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. lack of emergency lights, lack of exit signs throughout. remedy: submit architectural egress plan. obtain permits make all necessary repairs.
Mar 12, 2009 · Penalty $1,000
Resolve - Class - 2
100x10.75m7.100e1.39o2.100d6.100x10provide two way communication intercom 75m7 spring buffer missing counter weight to spring 100e1 elevatoris hitting rubbing while in flight clutch 39o2 car top clean 100d6 sec
Mar 6, 2009 · Penalty $250
Resolve - Class - 1
B101 50a.50a work w/o permit 2/275 gallon oil tanks are set up in court yd while new tank is to be installed
Feb 11, 2009 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Safety
Window guard broken/missing
Oct 6, 2026 · Apt 88
Close - Appliance
Refrigerator
Oct 6, 2026 · Apt 88
Close - Door/window
Door
Oct 1, 2026 · Apt 67
Open - Appliance
Electric/gas range
Oct 1, 2026 · Apt 67
Open - Appliance
Refrigerator
Oct 1, 2026 · Apt 67
Open - Appliance
Electric/gas range
Oct 1, 2026 · Apt 67
Open - Electric
Outlet/switch
Oct 1, 2026 · Apt 67
Open - Door/window
Door
Sep 15, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 26, 2026 · Apt 57
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Feb 2, 2026 · Apt 53
Close - Door/window
Door
Feb 2, 2026 · Apt 53
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt 23
Close - Plumbing
Bathtub/shower
Jul 24, 2025 · Apt 83
Close - Door/window
Window frame
Jul 24, 2025 · Apt 83
Close - Paint/plaster
Wall
Jul 24, 2025 · Apt 83
Close - General
Cabinet
Jul 24, 2025 · Apt 83
Close - General
Bell/buzzer/intercom
Jul 24, 2025 · Apt 83
Close - Unsanitary condition
Pests
Jul 24, 2025 · Apt 83
Close - Flooring/stairs
Floor
Jul 24, 2025 · Apt 83
Close - Unsanitary condition
Mold
Jul 24, 2025 · Apt 83
Close - Water leak
Slow leak
Jul 24, 2025 · Apt 83
Close - Unsanitary condition
Pests
Jun 3, 2025 · Apt 105
Close - Paint/plaster
Wall
Nov 25, 2024 · Apt 83
Close - Unsanitary condition
Pests
Nov 25, 2024 · Apt 83
Close - General
Bell/buzzer/intercom
Nov 25, 2024 · Apt 83
Close - Flooring/stairs
Floor
Nov 25, 2024 · Apt 83
Close - Paint/plaster
Ceiling
Nov 25, 2024 · Apt 83
Close - Paint/plaster
Wall
Nov 25, 2024 · Apt 83
Close - Plumbing
Bathtub/shower
Nov 25, 2024 · Apt 83
Close - Unsanitary condition
Mold
Nov 25, 2024 · Apt 83
Close - Plumbing
Basin/sink
Nov 25, 2024 · Apt 83
Close - Paint/plaster
Ceiling
Nov 25, 2024 · Apt 83
Close - Unsanitary condition
Mold
Nov 21, 2024 · Apt 82
Close - Flooring/stairs
Floor
Sep 2, 2024 · Apt 53
Close - General
Cabinet
Sep 2, 2024 · Apt 53
Close - Unsanitary condition
Pests
Sep 2, 2024 · Apt 53
Close - Paint/plaster
Wall
Sep 2, 2024 · Apt 53
Close - Electric
Lighting
Sep 2, 2024 · Apt 53
Close - Unsanitary condition
Pests
Sep 2, 2024 · Apt 53
Close - Unsanitary condition
Pests
Aug 28, 2024 · Apt 103
Close - Paint/plaster
Wall
Aug 8, 2024 · Apt 53
Close - General
Cabinet
Aug 8, 2024 · Apt 53
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1910
- Floors
- 10
- Residential units
- 79
- Building area
- 99,946 ft²
- Lot area
- 12,500 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 2089 / 33
- Assessed value
- $3,189,150
- Landmark / historic district
- No
HPD registration #109659, last renewed Nov 25, 2025.
Questions about 3489 Broadway
Who owns 3489 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 3489 Broadway LLC.
Does 3489 Broadway have violations?
Yes. NYC HPD has recorded 957 housing violations at this property.
Is 3489 Broadway rent stabilized?
NYC Department of Finance tax bills listed 43 rent-stabilized units here in 2024 (about 54% of its 79 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3489 Broadway built?
City records list 1910 as the year it was built.
How many apartments are in 3489 Broadway?
It has 79 residential units and 86 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.