545 West 144 Street
Manhattan, NY 10031BBL 1-02076-0014Map
Owner of record: 545 West 144 LLC C/O
545 West 144 Street is a walk-up apartment building built in 1910 in Manhattan, 10031. It has 19 residential units across 5 floors. The owner of record is 545 West 144 LLC C/O. HPD has recorded 634 housing violations here, most recently on September 18, 2026. 40 of the 50 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.
- HPD violations
- 634
- DOB violations
- 6
- ECB violations
- 3
- HPD complaints
- 720
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 634
- BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at north wall in the bathroom located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at ceiling and all walls in the bathroom located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the private hallway located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at south wall in the kitchen located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the kitchen located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at south wall in the kitchen located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at south wall in the 5th room from north located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose upper wall cabinet at south wall in the kitchen located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 15, 4th story, 2nd apartment from west at north
Sep 18, 2026 · Apt 15
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from north at west located at apt 4, 2nd story, 1st apartment from east at south
Jul 1, 2026 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 4, 2nd story, 1st apartment from east at south
Jul 1, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at east wall in the private hallway located at apt 8, 3rd story, 1st apartment from east at south
Jun 20, 2026 · Apt 8
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jun 20, 2026 · Apt 8
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jun 20, 2026 · Apt 8
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling, east and south walls in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jun 20, 2026 · Apt 8
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, east and south walls in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jun 20, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). picture moulding at north wall, picture moulding at south wall, west wall in the 3rd room from north located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). picture moulding at north wall, picture moulding at south wall, west wall in the 3rd room from north located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). picture moulding at north wall, picture moulding at south wall, west wall in the 3rd room from north located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 3rd room from north located at apt 1, 1st story, 1st apartment from north at east
Jun 17, 2026 · Apt 1
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jun 15, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jun 15, 2026 · Apt 8
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 8, 3rd story, 1st apartment from east at south
Jun 15, 2026 · Apt 8
Closed — Violation closed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at public hall, 3rd story
Jun 15, 2026
Open — Nov certified on time - ANon-hazardous
Cleanse to the satisfaction of this department the floors and landings at all stories. at public hall
Jun 15, 2026
Open — Nov certified on time - BHazardous
Remove all encumbrances consisting of ladder, construction material, electric bikeand household items at public hall, 1st story
Jun 15, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of consisting of construction and household items at public hall, 1st story
Apr 7, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 7, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9, 3rd story, 2nd apartment from east at south
Apr 1, 2026 · Apt 9
Open — False certification - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Mar 25, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective air valve at radiator in the 4th room from north at east located at apt 1, 1st story, 1st apartment from north at east
Mar 25, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 25, 2026 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north located at apt 1, 1st story, 1st apartment from north at east
Mar 25, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 25, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 25, 2026 · Apt 1
Closed — Violation dismissed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 3
- Non-hazardous
Work w/o a permit. work noted-laminated walls & ceiling-erected-new partitions, new bathroom & kitchen at 3rd flr apt #1l. remedy: stop all work & obtain permits.
Apr 4, 2008 · Penalty $250
Resolve - Hazardous
Section 27-1039. failure to carry out demolition work in safe matter. ceiling cracked in hallway of apt #7 2nd flr due to construction work directly above apts 7 known as apt #11 3rd flr, stop order issued.
Apr 4, 2008 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior bldg wall. defect is : at front facade metal cornice is defective with sections missing. remedy : make safe immediatly, erect sidewalk shed, make all necessary repairs immedialty
Aug 2, 2006 · Penalty $2,500
Resolve
Complaints
- Safety
Window guard broken/missing
Sep 16, 2026 · Apt 15
Close - Paint/plaster
Ceiling
Sep 16, 2026 · Apt 15
Close - General
Cabinet
Sep 16, 2026 · Apt 15
Close - General
Cabinet
Sep 16, 2026 · Apt 15
Close - Plumbing
Toilet
Jul 22, 2026 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Jul 22, 2026 · Apt 1
Close - Appliance
Refrigerator
Jul 22, 2026 · Apt 1
Close - Paint/plaster
Wall
Jul 22, 2026 · Apt 1
Close - Appliance
Electric/gas range
Jul 22, 2026 · Apt 1
Close - Plumbing
Water supply
Jun 30, 2026 · Apt BLDG
Close
Show 40 more ↓
- Electric
Outlet/switch
Jun 19, 2026 · Apt APT8
Close - Unsanitary condition
Mold
Jun 19, 2026 · Apt APT8
Close - Paint/plaster
Ceiling
Jun 19, 2026 · Apt APT8
Close - Electric
Outlet/switch
Jun 15, 2026 · Apt 8
Close - Unsanitary condition
Mold
Jun 15, 2026 · Apt 8
Close - Paint/plaster
Ceiling
Jun 15, 2026 · Apt 8
Close - Plumbing
Toilet
Jun 15, 2026 · Apt 1
Close - Plumbing
Radiator
Jun 15, 2026 · Apt 1
Close - Paint/plaster
Window/frame
Jun 15, 2026 · Apt 1
Close - Paint/plaster
Wall
Jun 15, 2026 · Apt 1
Close - Plumbing
Bathtub/shower
Jun 15, 2026 · Apt 1
Close - Appliance
Refrigerator
Jun 15, 2026 · Apt 1
Close - Appliance
Electric/gas range
Jun 15, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jun 13, 2026 · Apt 8
Close - Paint/plaster
Ceiling
Jun 13, 2026 · Apt 8
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 6, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 30, 2026 · Apt 1
Close - Appliance
Refrigerator
Mar 18, 2026 · Apt 1
Close - Plumbing
Toilet
Mar 18, 2026 · Apt 1
Close - Plumbing
Radiator
Mar 18, 2026 · Apt 1
Close - Plumbing
Bathtub/shower
Mar 18, 2026 · Apt 1
Close - Door/window
Window frame
Mar 18, 2026 · Apt 1
Close - Door/window
Door
Mar 18, 2026 · Apt 1
Close - Appliance
Electric/gas range
Mar 18, 2026 · Apt 1
Close - Paint/plaster
Wall
Mar 18, 2026 · Apt 1
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 6, 2026 · Apt 9
Close - Flooring/stairs
Floor
Feb 6, 2026 · Apt 9
Close - Paint/plaster
Ceiling
Feb 6, 2026 · Apt 9
Close - Unsanitary condition
Mold
Feb 6, 2026 · Apt 9
Close - Plumbing
Bathtub/shower
Feb 6, 2026 · Apt 9
Close - Safety
Carbon monoxide detector
Feb 6, 2026 · Apt 9
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Jan 9, 2026 · Apt 3
Close - Water leak
Heavy flow
Jan 9, 2026 · Apt 3
Close - Paint/plaster
Wall
Jan 9, 2026 · Apt 3
Close - Unsanitary condition
Mold
Jan 9, 2026 · Apt 3
Close - Unsanitary condition
Pests
Jan 9, 2026 · Apt 3
Close - Flooring/stairs
Floor
Jan 9, 2026 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 5
- Residential units
- 19
- Building area
- 14,190 ft²
- Lot area
- 3,997 ft²
- Zoning
- R7A
- Community board
- 109
- Council district
- 7
- Block / lot
- 2076 / 14
- Assessed value
- $599,400
- Landmark / historic district
- No
HPD registration #118941, last renewed Jun 17, 2025.
Questions about 545 West 144 Street
Who owns 545 West 144 Street?
The owner of record in NYC Department of City Planning PLUTO data is 545 West 144 LLC C/O.
Does 545 West 144 Street have violations?
Yes. NYC HPD has recorded 634 housing violations at this property.
Is 545 West 144 Street rent stabilized?
NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 545 West 144 Street built?
City records list 1910 as the year it was built.
How many apartments are in 545 West 144 Street?
It has 19 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.