3440 Broadway
Manhattan, NY 10031BBL 1-02072-0001Map
Owner of record: 3440 Broadway Bcr LLC
3440 Broadway is an elevator apartment building built in 1906 in Manhattan, 10031. It has 36 residential units across 6 floors. The owner of record is 3440 Broadway Bcr LLC. HPD has recorded 407 housing violations here, most recently on October 14, 2026. 46 of the 50 most recent violations are still open. City tax records listed 21 rent-stabilized apartments here in 2024.
- HPD violations
- 407
- DOB violations
- 31
- ECB violations
- 33
- HPD complaints
- 751
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 407
- BHazardous
Repair the broken or defective connection at sink waste line. in the kitchen located at apt 6a, 6th story, 1st apartment from east at south
Oct 14, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north located at apt 1f, 1st story, 1st apartment from north at east
Oct 14, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood bottom panel at base cabinet in the kitchen located at apt 6a, 6th story, 1st apartment from east at south
Oct 14, 2026 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 4e, 4th story, 1st apartment from west at north
Oct 1, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from north at east
Oct 1, 2026 · Apt 2F
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 1, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at ,,
Oct 1, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household item(bike) at public hall, 2nd story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 2nd story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at public hall, 2nd story
Oct 1, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 2nd story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls at public hall, 3rd story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at public hall, 3rd story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 3rd story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls at public hall, 4th story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at public hall, 4th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at public hall, 5th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls at public hall, 6th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at public hall, 6th story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 6th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of maintenance supplies at bulkhead at public hall
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 1, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 1, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 1, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 1, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 1, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 1, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 1, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective latch set in the entrance located at apt 4e, 4th story, 1st apartment from west at north
Oct 1, 2026 · Apt 4E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls at public hall, 5th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 5d, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5D
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 5d, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5D
Open — Civ14 mailed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at north, south and west walls in the bathroom located at apt 5d, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5D
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4e, 4th story, 1st apartment from west at north
Jun 30, 2026 · Apt 4E
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 4e, 4th story, 1st apartment from west at north
Jun 30, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective lower metal panel at west sidelite at building front
Jun 19, 2026
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the vestibule floor , 1st story
Jun 19, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 4e, 4th story, 1st apartment from west at north
Jun 18, 2026 · Apt 4E
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Jun 18, 2026 · Apt 4E
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Jun 18, 2026 · Apt 4E
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 1st apartment from west at north
Jun 18, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective escutcheon plate at top of heat riser in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Jun 16, 2026 · Apt 4E
Open — Civ14 mailed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4e, 4th story, 1st apartment from west at north
Jun 16, 2026 · Apt 4E
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Jun 16, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Jun 16, 2026 · Apt 4E
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Jun 16, 2026 · Apt 4E
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4e, 4th story, 1st apartment from west at north
Jun 16, 2026 · Apt 4E
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 4e, 4th story, 1st apartment from west at north
Jun 16, 2026 · Apt 4E
Open — Civ14 mailed
DOB building violations · 31
- Construction other optional
Emergency work order due to loose bricks & crack masonry at exp 3 (north elev) & exp4 (east elev) at multiple locations. remedy: immediately repair damage facades. provide safety measures under supervision of licensed registered design professional (pe/ra)
May 7, 2026
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 23, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - dismissed - Immediate emergency anythingoptional
Install approximately 100 linear feet of sidewalk shed along exposure 2 (broadway) to close in the collapse zone and safeguard the public and property
Aug 4, 2020
Dob violation - dismissed - Construction other optional
Structure rendered non-compliant. noted: building fire escapes in disrepair and deteriorated with multiple missing and loose metal steps throughout all 3 fire escape stacks all stories.
Aug 4, 2020
Dob violation - dismissed - Construction other optional
Structure rendered non compliant. building fire escapes in severe state of disrepair with multiple loose and missing steps throughout the entire building all stories, eliminating second means of egress for tenants.
Aug 4, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active
Show 21 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 8, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2010
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 18, 2004
Dob violation - resolved - Elevator elevatorrequired
1p9990
Mar 31, 2003
Dob violation - resolved - Elevator elevatorrequired
1p9990
Jan 14, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Elevator elevatorrequired
Device #1p9990
May 7, 1991
Vp*-violation unserved ecb- dismissed - Electric signs none
Es-electric signs none
Feb 19, 1991
Dob violation - active - Electric signs none
Es-electric signs none
Feb 19, 1991
Dob violation - active - Elevator elevatorrequired
Install capacity plate in elev. replace push plate on hoistway door
Aug 31, 1988
Dob violation - resolved
ECB violations · 33
- Class - 1
Cease use items: door zone restrictor has been tampered with and rendered inoperative. a17.1 section 2.12.5 / door lock monitoring inoperative. a17.1 section 2.26.9 : restore to service immediately. and email t
May 22, 2026 · Penalty $1,250
Active - Class - 2
Failure to file acceptable amended cycle 8c, 9c, and 10c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #1006992. remedy: file acceptable
Apr 20, 2026 · Penalty $6,250
Active - Class - 1
Failure to provide adequate safety measures such as sidewalk sheds as per technical report unsafe-1006992-10c-001.noted:no sidewalk shed in place at exp 1(s.elev),exp 4(e.elev)these conditions exist on ecb vio
Apr 16, 2026 · Penalty $10,000
Active - Class - 1
5/l/10 car & gate switch defective repair.
Dec 8, 2025
Resolve - Class - 1
Failure to maintain building exterior wall(s) or appurtenances. note:-at the time of inspection observed at expo #3 and 4 north and east elevation damaged mortar joints and deterioratimng masonary at multiple l
May 15, 2025 · Penalty $5,000
Active - Class - 1
Failure to provide adequate safety measures such as shed, netting etc.where required to protect public and property from documented unsafe facade as per 1rcny 103-04. note: at time of inspection on a designated
May 7, 2025
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #906992. agg1: prior nov 3702276
Apr 8, 2025 · Penalty $6,250
Active - Class - 2
Failure to maintain exterior building facade and appurtenances. note-observed step cracks at bricks at exposure 2 west elevation. -missing mortar joints at exposure 2 west elevation. -and spalding and deteriora
Dec 7, 2023 · Penalty $1,250
Active - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#806992.agg1 prior nov#37018103z under 2
Oct 19, 2022 · Penalty $3,125
Active - Class - 1
Door zone restrictor has been tampered with and rendered inoperative. repair restrictor or device will be cease used.
Aug 20, 2021 · Penalty $6,250
Active
Show 23 more ↓
- Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39026341r issued on 08/04/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain buil
Nov 24, 2020
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy : file application, install dlm
Sep 28, 2020 · Penalty $1,250
Active - Class - 1
Failure to maintain building in a code compliant manner. noted: building fire escapes in disrepair and deteriorated with multiple missing and loose metal steps throughout all 3 fire escape stacks all stories.,
Aug 4, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#806992. remedy: submit acceptable required technica
Feb 13, 2020 · Penalty $1,250
Active - Class - 3
Work without a permit. noted: at time of inspection observed at rear of mexican/restaurant/apartment building garbage storage area, metal and plastic over hang attached on to parapet of mezzanine roof approx. 4
Aug 2, 2017 · Penalty $100
Active - Class - 2
Work w/o permit.@ time of insp observed shed constructed @rear yard,size apprx 8'lx4'wx8'h w/sloping roof use for storage of food items.100%of work done w/o permit.rem:obtain all permits required.
Jun 28, 2017
Resolve - Class - 2
Work w/o permit.noted installed accessory business sign awning (illuminated) approx 14'x2.5'x2' & 6'x1.5' illuminated projecting sign.text for both include "magd deli" rem obtain all necessary permits
Jun 22, 2015 · Penalty $830
Active - Class - 1
Sec. 3314.6.1 safe points of anchorage include structural members of abldg. -tiebacks for c-hooks attached to fire escape -foreman on site -men on suspended scaffold. remedy: comply w/code,partial stop work
May 22, 2013 · Penalty $1,600
Resolve - Class - 2
32h11,34q3,35q3,56y13,67m7,68b7,71x10. 32h- replace worn car guide shoes. 34q- install covers for electrical boxes in shaftway. 35q- installcovers for electrical boxes top of car. 67m- provide communication in
May 8, 2013
Resolve - Class - 1
97x10,59x10: cease use to elev not stopping until it goes into this finals most do breaks test with full load & 125% weights. only elev in building call 212-566-5544 for brake test & return to service.
Aug 5, 2012 · Penalty $1,000
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Jan 9, 2009 · Penalty $800
Resolve - Non-hazardous
21b01.08v10.46e10 21b01 adjust 6th fl interlock 08v10 repair fl stops1 to 2 off level 46e10 repair noise in drum machine
Apr 23, 2008 · Penalty $180
Resolve - Non-hazardous
28h01/ 08v01/ 11q03/ (28) adjust car guide shoes (08) adjust floor stop (11) install guard at light in car
Oct 1, 2002 · Penalty $2,500
Resolve - Non-hazardous
57o02/ 57z02/ 48b07/ 49b07/ 11q07/ 48 & 49 - tag expired
Jul 25, 2002 · Penalty $350
Resolve - Non-hazardous
15l1/8j1/ door slamming -adjust check or replace 1st floor door sticking adjust
Oct 4, 2000
Resolve - Non-hazardous
Violation : failure to provide a system of automatic sprinklers where required . automatic sprinklers where required. remedy: provide automatic sprinklers commercial gas dryers not protected /do not comply wit
Dec 16, 1999 · Penalty $400
Active - Non-hazardous
Violation: use or installation of plumbing materials or equipment which does not comply with rs-16 of the n.y.c building code. remedy: remove non- complying material or equioment . flexible gas connectors not a
Dec 16, 1999 · Penalty $400
Resolve - Non-hazardous
8y,57o,17i. car not leveling with floors landing, pit dirty, vision panel damaged.
Dec 1, 1998
Resolve - Non-hazardous
10t, 14m, 17r, 25l, 25m, 28l, 31m, 32m, 33i, 37g, 37r, 50y, 57z. 10t-floor numbers and stop switch. 17r-for wire-glass. 25m-cover. 31-32covers. 33i-walls. 37r-jumped fuses.
Mar 22, 1995
Resolve - Non-hazardous
73x, restore to proper working orders
Jun 13, 1994
Resolve - Non-hazardous
09h,15i,17r,18l,25m,28l,32m,37g,48k,52l,57z,57o,74o,15l, 15.bsmt.door and buck. 17.wire glass. 18l-5th floor. 25m cover. 32.covers. 37g for proper amperage. 74.car top. 15l door checks.
Nov 27, 1992 · Penalty $200
Resolve - Non-hazardous
11q,17m,18l,21l,22d,34i,37g,46k,49k,50y,50y,62k,62m,73o,74m, 17-6th fl 18-bsmt. 62k-underside cab sheeting rotten 62m- kick plate 74- primary contacts on bsmt. door
Feb 28, 1992
Resolve - Non-hazardous
35p,03t,57o,03 provide capacity plate.
May 7, 1991
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 13, 2026 · Apt 1F
Close - Plumbing
Basin/sink
Oct 8, 2026 · Apt 6A
Close - Line of travel
Line of travel
Oct 1, 2026 · Apt 4E
Close - Line of travel
Line of travel
Oct 1, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Sep 10, 2026 · Apt 8B
Close - Electric
Outlet/switch
Aug 14, 2026 · Apt 3B
Close - General
Janitor/super
Aug 14, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Aug 14, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jul 18, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 8, 2026 · Apt 5D
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 8, 2026 · Apt 5D
Close - General
Mailbox
Jul 8, 2026 · Apt 5D
Close - Water leak
Slow leak
Jul 8, 2026 · Apt 5D
Close - Unsanitary condition
Mold
Jul 8, 2026 · Apt 5D
Close - Unsanitary condition
Garbage/recycling storage
Jul 8, 2026 · Apt 5D
Close - Appliance
Electric/gas range
Jul 8, 2026 · Apt 5D
Close - Electric
Outlet/switch
Jul 8, 2026 · Apt 5D
Close - Paint/plaster
Ceiling
Jun 26, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Jun 26, 2026 · Apt 4E
Close - Door/window
Window frame
Jun 26, 2026 · Apt 4E
Close - Paint/plaster
Wall
Jun 26, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Jun 26, 2026 · Apt 4E
Close - Flooring/stairs
Floor
Jun 26, 2026 · Apt 4E
Close - General
Mailbox
Jun 26, 2026 · Apt 4E
Close - Appliance
Electric/gas range
Jun 26, 2026 · Apt 4E
Close - Unsanitary condition
Garbage/recycling storage
Jun 26, 2026 · Apt 4E
Close - Water leak
Slow leak
Jun 26, 2026 · Apt 4E
Close - Plumbing
Basin/sink
Jun 26, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Jun 26, 2026 · Apt 4E
Close - Water leak
Slow leak
Jun 26, 2026 · Apt 4E
Close - Unsanitary condition
Mold
Jun 26, 2026 · Apt 4E
Close - Plumbing
Basin/sink
Jun 26, 2026 · Apt 4E
Close - Flooring/stairs
Floor
Jun 26, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Jun 15, 2026 · Apt 4E
Close - Plumbing
Radiator
Jun 15, 2026 · Apt 4E
Close - Plumbing
Basin/sink
Jun 15, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Jun 15, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Jun 15, 2026 · Apt 4E
Close - General
Mailbox
Jun 15, 2026 · Apt 4E
Close - Unsanitary condition
Pests
Jun 15, 2026 · Apt 4E
Close - Unsanitary condition
Pests
Jun 15, 2026 · Apt 4E
Close - Water leak
Heavy flow
Jun 15, 2026 · Apt 4E
Close - Flooring/stairs
Floor
Jun 15, 2026 · Apt 4E
Close - Plumbing
Bathtub/shower
Jun 15, 2026 · Apt 4E
Close - Unsanitary condition
Garbage/recycling storage
Jun 11, 2026 · Apt BLDG
Close - General
Mailbox
Jun 11, 2026 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Jun 7, 2026 · Apt 6D
Close - Water leak
Damp spot
Jun 1, 2026 · Apt 4E
Close - General
Mailbox
Jun 1, 2026 · Apt 4E
Close - Unsanitary condition
Garbage/recycling storage
Jun 1, 2026 · Apt 4E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1906
- Floors
- 6
- Residential units
- 36
- Building area
- 47,714 ft²
- Lot area
- 10,000 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 2072 / 1
- Assessed value
- $1,661,400
- Landmark / historic district
- No
HPD registration #113934, last renewed Oct 21, 2025.
Questions about 3440 Broadway
Who owns 3440 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 3440 Broadway Bcr LLC.
Does 3440 Broadway have violations?
Yes. NYC HPD has recorded 407 housing violations at this property.
Is 3440 Broadway rent stabilized?
NYC Department of Finance tax bills listed 21 rent-stabilized units here in 2024 (about 58% of its 36 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3440 Broadway built?
City records list 1906 as the year it was built.
How many apartments are in 3440 Broadway?
It has 36 residential units and 42 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.