51 Hamilton Place
Manhattan, NY 10031BBL 1-02071-0015Map
Owner of record: Federal National Mortgage Association
51 Hamilton Place is an elevator apartment building built in 1908 in Manhattan, 10031. It has 29 residential units across 6 floors. The owner of record is Federal National Mortgage Association. HPD has recorded 158 housing violations here, most recently on September 1, 2026. 8 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 158
- DOB violations
- 26
- ECB violations
- 23
- HPD complaints
- 179
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 158
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 23a, 2nd story, 1st apartment from south at west
Sep 1, 2026 · Apt 23A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 23a, 2nd story, 1st apartment from south at west
Sep 1, 2026 · Apt 23A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east located at apt 34, 3rd story, 1st apartment from south at west
Jun 12, 2026 · Apt 34
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 34, 3rd story, 1st apartment from south at west
Jun 12, 2026 · Apt 34
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at window frame in the bathroom located at apt 43, 4th story, 1st apartment from east at south
Sep 18, 2024 · Apt 43
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 7th room from east located at apt 43, 4th story, 1st apartment from east at south
Sep 18, 2024 · Apt 43
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 7th room from east located at apt 43, 4th story, 1st apartment from east at south
Sep 18, 2024 · Apt 43
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; at apt# 62, 6 story, e1 in the entire apartment located at apt 62, 6th story, 1st apartment from north at east
Sep 3, 2024 · Apt 62
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the 3rd room from east at north located at apt 61, 6th story, 1st apartment from west at north
Aug 7, 2024 · Apt 61
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of slide bolt capable of being padlocked installed at door in the entrance located at apt 62, 6th story, 1st apartment from north at east
Aug 7, 2024 · Apt 62
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 62, 6th story, 1st apartment from north at east
Aug 7, 2024 · Apt 62
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 62, 6th story, 1st apartment from north at east
Aug 7, 2024 · Apt 62
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 62, 6th story, 1st apartment from north at east
Aug 7, 2024 · Apt 62
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 62, 6th story, 1st apartment from north at east
Aug 7, 2024 · Apt 62
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 62, 6th story, 1st apartment from north at east
Aug 7, 2024 · Apt 62
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of slide bolt capable of being padlocked installed at door in the entrance located at apt 53a, 5th story, 1st apartment from south at west
Aug 7, 2024 · Apt 53A
Open — Invalid certification - CImmediately hazardous
Properly repair or replace the broken or defective locking device on the self-closing vestibule door at public hall, 1st story
Mar 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Mar 6, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 61, 6th story, 1st apartment from west at north
Mar 6, 2024 · Apt 61
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 61, 6th story, 1st apartment from west at north
Mar 6, 2024 · Apt 61
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room at basement
Feb 20, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 61, 6th story, 1st apartment from west at north
Feb 20, 2024 · Apt 61
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 61, 6th story, 1st apartment from west at north
Feb 20, 2024 · Apt 61
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latching device at vestibule door at public hall, 1st story
Feb 19, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective spauilding at building front parapet wall at roof
Feb 19, 2024
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from south at west wall in the 4th room from east at south located at apt 61, 6th story, 1st apartment from west at north
Feb 14, 2024 · Apt 61
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from west at north wall in the 3rd room from east at north located at apt 61, 6th story, 1st apartment from west at north
Feb 14, 2024 · Apt 61
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the private hallway from north located at apt 61, 6th story, 1st apartment from west at north
Feb 14, 2024 · Apt 61
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st window frame from south at west wall in the 4th room from east at south located at apt 61, 6th story, 1st apartment from west at north
Feb 14, 2024 · Apt 61
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at apt 61, 6th story, 1st apartment from west at north
Feb 14, 2024 · Apt 61
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st window frame from west at north wall in the 3rd room from east at north located at apt 61, 6th story, 1st apartment from west at north
Feb 14, 2024 · Apt 61
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Dec 26, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 41, 4th story, 1st apartment from west at north
Dec 26, 2023 · Apt 41
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 22, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 61, 6th story, 1st apartment from west at north
Nov 22, 2023 · Apt 61
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 22, 2nd story, 1st apartment from north at east
Nov 9, 2023 · Apt 22
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 22, 2nd story, 1st apartment from north at east
Nov 9, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 62, 6th story, 1st apartment from north at east
Sep 10, 2023 · Apt 62
Closed — Violation closed - BHazardous
Replace with new the missing 5 ceramic tiles at east wall in the bathroom located at apt 23a, 2nd story, 1st apartment from south at west
Jul 21, 2023 · Apt 23A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 23a, 2nd story, 1st apartment from south at west
Jul 21, 2023 · Apt 23A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 23a, 2nd story, 1st apartment from south at west
Jul 21, 2023 · Apt 23A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 23a, 2nd story, 1st apartment from south at west
Jul 21, 2023 · Apt 23A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the north wall in the 3rd room from east located at apt 61, 6th story, 2nd apartment from south at west
Jul 16, 2023 · Apt 61
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall in the 3rd room from east located at apt 61, 6th story, 2nd apartment from south at west
Jul 16, 2023 · Apt 61
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 23a, 2nd story, 1st apartment from south at west
Jul 9, 2023 · Apt 23A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 23a, 2nd story, 1st apartment from south at west
Jul 9, 2023 · Apt 23A
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at fifth story balcony at south fire escape in the bulding front
Jul 9, 2023
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the kitchen located at apt 22, 2nd story, 1st apartment from south at west
Mar 31, 2023 · Apt 22
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective mortice lock in the entrance located at apt 33, 3rd story, 1st apartment from east at south
Mar 31, 2023 · Apt 33
Closed — Violation closed
DOB building violations · 26
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2016
Dob violation - dismissed
Show 16 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2003
Dob violation - resolved - Elevator elevatorrequired
1p10039
May 26, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Elevator elevatorrequired
Properly tag governor after conducting 2yr safety test.provide capacity plate in elev
Sep 1, 1988
Dob violation - resolved
ECB violations · 23
- Class - 2
Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #916633. remedy: submit acceptab
Apr 8, 2025 · Penalty $2,500
Active - Class - 2
Failure to maintain exterior building facade and appurtenances.as noted building failed to complete necessary repairs to building facade.building has conditions from summons#35319038h issued on 06/19/18 conditi
Oct 28, 2021 · Penalty $625
Active - Class - 2
Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section.at time of inspectionat 6 story building i observed not information panel on sidewalk shed
Aug 12, 2021
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation#35319038h issued on 6/19/2018,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).rem:file a certificat
Jun 29, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#816633.rem:submit acceptable required t
Feb 13, 2020
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of a systemof automatic sprinklers where required per bc903.2'27-954 at time of inspection in cellar i observed 3 gas dryers and no sprinkler protectio
Aug 28, 2018 · Penalty $1,000
Resolve - Class - 1
Work without a permit.at time of inspection in cellar i observed illegal laundry room with 3 gas dryers no permit on dob record to perform the job.certificate of occupancy states that in cellar there are:one ap
Aug 28, 2018
Resolve - Class - 1
Failure to maintain building in code compliant manner.at time of inspection in cellar laundry room i observed 3 gas dryers connected using illegal flex connectors.observed illegal gas union on gas line for drye
Aug 28, 2018 · Penalty $1,250
Resolve - Class - 1
Gas being supplied to building without inspection and certification bydob.at time of inspection in cellar i observed illegal 3 gas dryers,gas meter valve opened-gas in use no permit,no plumbing inspections on d
Aug 28, 2018
Resolve - Class - 1
Failure to maintain exterior bldg facade & appurtenances. note: west elevation,exp#1 crack stone at 2nd & 5th fl & open mortar joint at various location were observe. north elevation exp#2,crack/spalled/open
Jun 19, 2018 · Penalty $2,500
Active
Show 13 more ↓
- Class - 2
2x10,8v1,98bb5,99bb5,5b1,29d3,41q6-98&99bb5)perform cat1 & cat5 tests. 5b1)adjust so car door can not open out of door zone when car safety or door lock opened. 29d3)install cover for door operator properly. 41
Nov 29, 2017 · Penalty $530
Resolve - Class - 1
97-x-17:the (only) elevator in bldg car section of bldg. & of service upon insp the device is found to be out of service creating a hazardous condition as per 1rcny 11-02 rem:restore to service immediately & no
Aug 7, 2017 · Penalty $1,000
Resolve - Class - 2
Partial swo issued for suspended scaffold pursuant 28-207.2 &posted onpremises.failed to notify dept 24hrs prior to suspended scaffold installation.noted:@time of inspection suspended scaffold installed @the ro
Jun 9, 2016 · Penalty $830
Resolve - Class - 1
Failure to provide pedestrian protection for sidewalks.noted@time of inspection suspended scaffold installed @the roof level of 5 stry bldg@exp#1 no pedestrian protection is provided.stop all work on suspended
Jun 9, 2016 · Penalty $12,000
Resolve - Class - 2
29-q-03/37-t-07/37-x-10/37-q-03/60-q-03/43-x-10/67-m-07/69-m-07/71-q-03/72-m-07/99-bb-05/37-t-07provide sign for overhead sheave room door/37-x-10-repair light in overhead/37-q-03-install guard for light in
Jun 3, 2011 · Penalty $500
Resolve - Class - 2
59m07.61m07.68m07.61l11.37i10.39x10.29m07.06b01.80b14.59m provide clip for brake pin 61m provide co. emergencies phone # on maibn line 37i repair overhead door 37x repair light in overhead 39x repair light on
Mar 4, 2009 · Penalty $500
Resolve - Non-hazardous
21,b,3 2,x,10 8,v,1 41,g,11 51,k,11 51,h,14 60,t,15 39,r,9 59,b,10 35,q,3 38,o,2 66,0,2 21 6 fl 60 company on main line 39 remove none elev equipment 35 where covers are needed
Nov 12, 2003 · Penalty $350
Resolve - Non-hazardous
5j11/ 8v1/ 15l11/ 22j6/ 25q3/ 35o2/ 57o2/ 5j11 = too much gap between car door and car post 15l11 = slams 3,4 & 5 th fls 22l6 = secure to code 35-o-2 not for storage only elevator equipment allowed
Jun 6, 2002 · Penalty $350
Resolve - Non-hazardous
Occupancy contrary to that allowed by the building department records.noted: one, appor. 15'x15' room, at basement (southwest corner of bldg.) is being used as social club with seating arrangement & tv
Oct 31, 1994 · Penalty $800
Resolve - Non-hazardous
17m,52j,8v,50f,40h,74#, 17 with wire glass 40 overhaul-calibrate-seal 74 install proper tag on gove. (data & test done)
Feb 4, 1994
Resolve - Non-hazardous
05i,09r,15m,17m,28l,29m,51f,54m,73u, 05i-cover saddle 15m-floors # 17m-3rd floor 28l-top set 29m-pit shield guard 54m-elevator co.name
Apr 14, 1993 · Penalty $100
Resolve - Non-hazardous
57z,31q,08v,33q,33m,33w,35p,74x,73#,33-sky light33-ladder 74-have elev ans all call and stop on all floors 73perform 5yr test file elv 3 form.
Aug 11, 1992 · Penalty $200
Resolve - Hazardous
22w,11q,3t,55x,57z,60m,46t,49t,50y,37r,37g,53l,31q,8v,33i,33x,33i,33m,35r,47l 3 capacity plate -60 cwt 37 light bulb and wiring at back 33 skylight 33 light 33 wall 33 ladder 35 jumper-cease use until items
Aug 26, 1991 · Penalty $500
Resolve
Complaints
- Unsanitary condition
Pests
Aug 28, 2026 · Apt 23A
Close - Plumbing
Water supply
Aug 28, 2026 · Apt 23A
Close - Paint/plaster
Ceiling
Jun 1, 2026 · Apt 34
Close - Heat/hot water
Entire building
May 24, 2026 · Apt 22
Close - Heat/hot water
Entire building
May 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt 51
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 5, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2025 · Apt 34
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2025 · Apt 34
Close - Heat/hot water
Entire building
Jan 19, 2025 · Apt 34
Close - Heat/hot water
Apartment only
Jan 19, 2025 · Apt 34
Close - Heat/hot water
Entire building
Jan 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 14, 2024 · Apt 43
Close - Heat/hot water
Entire building
Mar 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 29, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 27, 2024 · Apt 61
Close - Heat/hot water
Entire building
Feb 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt 31
Close - General
Cooking gas
Jan 31, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2024 · Apt BLDG
Close - Water leak
Slow leak
Jan 28, 2024 · Apt 61
Close - Heat/hot water
Entire building
Jan 11, 2024 · Apt BLDG
Close - Door/window
Window frame
Jan 9, 2024 · Apt 61
Close - Water leak
Slow leak
Jan 9, 2024 · Apt 61
Close - Heat/hot water
Apartment only
Dec 22, 2023 · Apt 41
Close - Heat/hot water
Entire building
Dec 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt 22
Close - Heat/hot water
Entire building
Nov 19, 2023 · Apt 61
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt 22
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt 22
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jan 2, 2026 | $2,200,000 | Rentals - elevator apartments | 29 |
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1908
- Floors
- 6
- Residential units
- 29
- Building area
- 33,880 ft²
- Lot area
- 10,600 ft²
- Zoning
- R7A
- Community board
- 109
- Council district
- 7
- Block / lot
- 2071 / 15
- Assessed value
- $1,140,300
- Landmark / historic district
- No
HPD registration #104351, last renewed Jan 29, 2026.
Questions about 51 Hamilton Place
Who owns 51 Hamilton Place?
The owner of record in NYC Department of City Planning PLUTO data is Federal National Mortgage Association.
Does 51 Hamilton Place have violations?
Yes. NYC HPD has recorded 158 housing violations at this property.
Is 51 Hamilton Place rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 79% of its 29 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 51 Hamilton Place built?
City records list 1908 as the year it was built.
How many apartments are in 51 Hamilton Place?
It has 29 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.