3420 Broadway
Manhattan, NY 10031BBL 1-02071-0001Map
Owner of record: Cob 3420 Broadway LLC
3420 Broadway is an elevator apartment building built in 1910 in Manhattan, 10031. It has 36 residential units across 6 floors. The owner of record is Cob 3420 Broadway LLC. HPD has recorded 279 housing violations here, most recently on September 22, 2026. 3 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 279
- DOB violations
- 24
- ECB violations
- 29
- HPD complaints
- 361
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 279
- BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 42, 4th story, 2nd apartment from south at west
Sep 22, 2026 · Apt 42
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 42, 4th story, 2nd apartment from south at west
Sep 22, 2026 · Apt 42
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Mar 7, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Mar 7, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Mar 7, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Mar 7, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 26, 2nd story, 2nd apartment from north at east
Mar 5, 2026 · Apt 26
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 26, 2nd story, 2nd apartment from north at east
Mar 5, 2026 · Apt 26
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 5, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 24, 2nd story, 4th apartment from south at west
Mar 5, 2026 · Apt 24
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 24, 2nd story, 4th apartment from south at west
Mar 5, 2026 · Apt 24
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the foyer located at apt 66, 6th story, 2nd apartment from south at west
Jan 14, 2026 · Apt 66
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 66, 6th story, 2nd apartment from south at west
Jan 14, 2026 · Apt 66
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 66, 6th story, 2nd apartment from south at west
Jan 14, 2026 · Apt 66
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 66, 6th story, 2nd apartment from south at west
Jan 14, 2026 · Apt 66
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective defective radiator shut-off knob at west wall in the 4th room from east located at apt 41, 4th story, 1st apartment from south at west
Nov 18, 2025 · Apt 41
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st bathroom from east, the 8th room from east at south, the 4th room from east, the kitchen located at apt 41, 4th story, 1st apartment from south at west
Nov 18, 2025 · Apt 41
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the kitchen located at apt 52, 5th story, 2nd apartment from south at west
Jun 23, 2025 · Apt 52
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 52, 5th story, 2nd apartment from south at west
Jun 23, 2025 · Apt 52
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at 1st window at west wall lower sash fire escape in the 3rd room from east at south located at apt 52, 5th story, 2nd apartment from south at west
Jun 23, 2025 · Apt 52
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at noth wall in the bathroom located at apt 52, 5th story, 2nd apartment from south at west
Jun 23, 2025 · Apt 52
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 41, 4th story, 1st apartment from south at west
Jun 12, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door at room entrance in the 1st room from east located at apt 41, 4th story, 1st apartment from south at west
Jun 12, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective upper wall wood cabinet at east wall in the kitchen located at apt 41, 4th story, 1st apartment from south at west
Jun 12, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from east located at apt 41, 4th story, 1st apartment from south at west
Jun 12, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wash basin cabinet in the bathroom located at apt 41, 4th story, 1st apartment from south at west
Jun 12, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet flushing apparatus in the bathroom located at apt 41, 4th story, 1st apartment from south at west
Jun 12, 2025 · Apt 41
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective sink wood base cabinet in the kitchen located at apt 41, 4th story, 1st apartment from south at west
Jun 12, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 8th room from east at north located at apt 41, 4th story, 1st apartment from south at west
May 20, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of discarded fridge with doors attached at public hall, 4th story
May 20, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at baseboard at west wall in the 4th room from east located at apt 41, 4th story, 1st apartment from south at west
May 20, 2025 · Apt 41
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 8th room from east at north located at apt 41, 4th story, 1st apartment from south at west
May 20, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 1st bathroom from east located at apt 41, 4th story, 1st apartment from south at west
May 20, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at west wall in the 1st bathroom from east located at apt 41, 4th story, 1st apartment from south at west
May 20, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from east located at apt 41, 4th story, 1st apartment from south at west
May 20, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective silicone caulk at tiles around bathtub in the bathroom located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles south wall in the bathroom located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the 2nd room from east located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at washbasin in the bathroom located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective hinges on entrance door in the 1st room from east located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of loose electrical wires at west wall in the bathroom located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the 1st window frame from south at west wall in the 7th room from east at south located at apt 41, 4th story, 1st apartment from south at west
May 14, 2025 · Apt 41
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 24, 2nd story, 4th apartment from south at west
Mar 18, 2025 · Apt 24
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 24, 2nd story, 4th apartment from south at west
Mar 18, 2025 · Apt 24
Closed — Violation closed
DOB building violations · 24
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 30, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 16, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2010 cat 1 insp/tst
Aug 15, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2011
Dob violation - resolved
Show 14 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2003
Dob violation - resolved - Construction other optional
C-construction other optional
Jul 19, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
May 30, 2001
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
1p9976
May 26, 2000
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Electric signs none
Es-electric signs none
Mar 9, 2000
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jan 12, 1996
Dob violation - dismissed - Electric signs none
Es-electric signs none
Feb 15, 1991
Dob violation - dismissed - Electric signs none
Es-electric signs none
Feb 15, 1991
Dob violation - dismissed - Electric signs none
Es-electric signs none
Feb 15, 1991
Dob violation - dismissed - Elevator elevatorrequired
(51)repair cab floor (52)clean installation(53)test and tag gover nor
Sep 6, 1988
Dob violation - resolved
ECB violations · 29
- Class - 1
Failure to maintain at time of inspection observed exit doors at two locations partially obstructed by tables chairs and junctions items.also location in use(fire hazard)also no exit signs installed tto direct
Oct 17, 2025 · Penalty $2,500
Active - Class - 1
Failure to maintain illegal hardware at time of inspection observed padlock able side left installed on door leading to rear yard(exit door)rem:provide legal hardware.
Oct 17, 2025 · Penalty $2,500
Active - Class - 2
Atoi at apt #55, 3 bedroom class a apt occupied by 6 adults and 2 children with one bedroom rented out as a b room occupied by 2 adults and 1 child, discontinue illegal occupancy or amend c of o; restore premis
Aug 19, 2024 · Penalty $1,250
Resolve - Class - 1
Atoi at apt #55 on 5th floor of premises, illegal locking devices on all 3 bedroom doors, provide legal hardware; remove illegal locking devices on all bedroom doors at apt # 55 immediately
Aug 19, 2024 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment onsite-expired permit.at time of inspection on a 6 story building,observed sws and pipe scaffold erected.observed the permit#m00310940-i7-sf pipe scaffold expired on 2/7/2021.cr
Mar 5, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specifications.at time of inspection on a 6 story building,observed sws erected the caps from the bolts where missing can create a hazardous condition for pedestrians in
Mar 5, 2021 · Penalty $2,400
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation#39006381n issued on 7/25/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi
Aug 3, 2020 · Penalty $1,250
Resolve - Class - 1
Hoist way lock misaligned repair. machine brake switch defective repair. communication defective repair.
Jun 25, 2020 · Penalty $3,125
Resolve - Class - 1
42-m-07, 02-x-10. 42-m-07 no door lock monitoring installed in controller as mandated by 3-10-12 of apendix 3 of 2014 of nyc building code. remedy:-fire application install 02-x+10 repair outside communication
Jun 23, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to provide 72 hour notice. note: during time of inspection, contractor stated he did not know he needed to notify department 72 hours prior to work beginning. failed to notify the department of any wo
Jul 25, 2019 · Penalty $1,250
Resolve
Show 19 more ↓
- Class - 2
Failure to post or distribute safe construction bill of rights. note: during time of inspection, observed no safe construction bill of rights posted and contractor stated he did not know he needed to distribut
Jul 25, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to post or distribute tenant protection plan. note: during time of inspection, observed tenant protection plan posted on entrance door only and not on any other floor in occupied building while work is
Jul 25, 2019 · Penalty $1,250
Resolve - Class - 2
70z09
Dec 8, 2014 · Penalty $530
Resolve - Class - 2
03i10.16m7.31q3.36q3.37t7.42d6.71q3.36q3 install covers for electricalboxes in shaftway 37t7 provide sign for overhead sheave rm door 42d6 secure relay on controller
Jan 7, 2010 · Penalty $500
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. outrigger on exp 3, tie backs on plan call for 1/2" cable double wrapped bulkhead extended to other bulkhead for tie backs.
Sep 17, 2009
Resolve - Class - 1
Sec. 3314.4.3. failure to provide supported scaffold daily inspection report. no daily inspection report at site at time of inspection for supported scaffold. remedy: comply w/code.
Sep 17, 2009 · Penalty $1,600
Resolve - Non-hazardous
Failure to provide approved plans @ premises at time of inspection : location 1st fl store north store under application # 104594173 issued11/27/07 ( quequsen ) restaurant remedy : stop all work & provide
Feb 21, 2007
Resolve - Non-hazardous
Work without a permit.work noted:constructed a curb cut at north side of west 139 street sidewalk illegally without a permit from buildings department.location:north side of sidewalk at 571 w 139 st 14'-0" long
Aug 24, 2004
Resolve - Non-hazardous
Work w/out a permit work noted complete demolitions to interior ground floor commercial space to replace with new concrete blocks, sheetroch to make new layout no permit remedy: stop all work immediately obtain
Jul 19, 2001
Resolve - Non-hazardous
Work without a permit. noted: at rear of the titanic seafood shop 1 floor common space a non-bearing wall has been removed to an large this shop. they have created space. they have also created bedroom. remedy:
May 30, 2001
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of oo or building department records. noted: illegal bedroom 1st floor common space has been set up in a room behind the kitchen in the titianic lobster and shrimp st
Mar 9, 2000
Resolve - Non-hazardous
Work without a pemrit : noted; at the rear of the titanic seafood shop 1st floor common space a non-bearing wall has been removed to enlarge this shop . they have created space. they have also created a bedroom
Mar 9, 2000
Resolve - Non-hazardous
35p,36p,47h,57o,75u,15i,74o, 15-repair basement sin
Jan 13, 1998 · Penalty $180
Resolve - Non-hazardous
Work does not conform to approved plans. work noted: (1) construction under application #101095832 01-fw-mh- at ground floor restaurant installed duct work & ceiling registers not as approved (2) removal of mas
Aug 2, 1996 · Penalty $350
Resolve - Non-hazardous
50y,50f,33m,33q,17r,30r,30t,61m,61k,62i,75u. 33 ladder.33 skylight.33 light switch at door.17 with clear wire glass.30 file for sealing up hoistway windows.61 key hole.
Apr 2, 1996 · Penalty $200
Resolve - Non-hazardous
15j, 31m, 32m, 33o, 33m, 33q, 33x, 40l, 46l, 49l, 50y, 50y, 75t. 31--32--covers. 33m-ladder. 33q-skylight. 33x-light.
Mar 22, 1995 · Penalty $100
Resolve - Non-hazardous
10i,03r.
Jun 13, 1994 · Penalty $1,000
Resolve - Non-hazardous
15j1, 57z9, 50y14, 10q3, 33o2, 33q3, 33m7, 33i11, 33m12, 31q3, 73m#
Feb 2, 1994
Resolve - Non-hazardous
03m,14m,01i,18m,18l,17r,35p,33p,28h,57o,62m. 18 3rd floor cover. 62 toe guard.
Nov 24, 1992 · Penalty $100
Resolve
Complaints
- Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Safety
Fire escape
Oct 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt 41
Close - Heat/hot water
Entire building
Mar 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt 42
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Mar 6, 2026 · Apt 24
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 3, 2026 · Apt 24
Close - Unsanitary condition
Mold
Jan 7, 2026 · Apt 66
Close - Water leak
Slow leak
Jan 7, 2026 · Apt 66
Close - Paint/plaster
Ceiling
Nov 11, 2025 · Apt 41
Close - Paint/plaster
Window/frame
Nov 11, 2025 · Apt 41
Close - Paint/plaster
Wall
Nov 11, 2025 · Apt 41
Close - Plumbing
Radiator
Nov 11, 2025 · Apt 41
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt 24
Close - Heat/hot water
Apartment only
Oct 18, 2025 · Apt 24
Close - Electric
Power outage
Jun 22, 2025 · Apt 52
Close - Unsanitary condition
Mold
Jun 22, 2025 · Apt 52
Close - Door/window
Window frame
Jun 22, 2025 · Apt 52
Close - Electric
Wiring
Jun 22, 2025 · Apt 52
Close - Plumbing
Toilet
May 13, 2025 · Apt 41
Close - General
Cabinet
May 13, 2025 · Apt 41
Close - Unsanitary condition
Pests
May 13, 2025 · Apt 41
Close - Unsanitary condition
Mold
May 13, 2025 · Apt 41
Close - Plumbing
Radiator
May 13, 2025 · Apt 41
Close - Flooring/stairs
Floor
May 13, 2025 · Apt 41
Close - Electric
Wiring
May 13, 2025 · Apt 41
Close - Plumbing
Bathtub/shower
Mar 17, 2025 · Apt 242NDF
Close - Plumbing
Bathtub/shower
Mar 17, 2025 · Apt 242NDF
Close - Paint/plaster
Cabinet
Mar 17, 2025 · Apt 242NDF
Close - Heat/hot water
Entire building
Feb 1, 2025 · Apt 52
Close - Heat/hot water
Apartment only
Dec 30, 2024 · Apt 66
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Nov 20, 2024 · Apt 636THF
Close - Plumbing
Radiator
Nov 20, 2024 · Apt 636THF
Close - Heat/hot water
Entire building
Nov 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2024 · Apt 24
Close - Heat/hot water
Entire building
Nov 16, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 15, 2024 · Apt 35
Close - Heat/hot water
Entire building
Nov 15, 2024 · Apt 24
Close - Unsanitary condition
Mold
Nov 14, 2024 · Apt 64
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1910
- Floors
- 6
- Residential units
- 36
- Building area
- 47,166 ft²
- Lot area
- 9,992 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 2071 / 1
- Assessed value
- $1,873,800
- Landmark / historic district
- No
HPD registration #113807, last renewed Sep 11, 2025.
Questions about 3420 Broadway
Who owns 3420 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Cob 3420 Broadway LLC.
Does 3420 Broadway have violations?
Yes. NYC HPD has recorded 279 housing violations at this property.
Is 3420 Broadway rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 64% of its 36 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3420 Broadway built?
City records list 1910 as the year it was built.
How many apartments are in 3420 Broadway?
It has 36 residential units and 42 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.