roofy

2 St Nicholas Place

Manhattan, NY 10031BBL 1-02053-0111Map

Owner of record: Hudson Valley King LLC

2 St Nicholas Place is an elevator apartment building built in 1904 in Manhattan, 10031. It has 30 residential units across 6 floors. The owner of record is Hudson Valley King LLC. HPD has recorded 879 housing violations here, most recently on April 22, 2026. 3 of the 50 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.

HPD violations
879
DOB violations
25
ECB violations
33
HPD complaints
728

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 22, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
20
About 67% of the building's 30 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 879

  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Apr 22, 2026 · Apt 1

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and east wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Apr 22, 2026 · Apt 1

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1, 1st story, 1st apartment from west at north

    Apr 22, 2026 · Apt 1

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Apr 22, 2026 · Apt 1

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Open — Lead docs submitted, acceptable
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st door from west at north wall, 1st door from south at west wall, 1st door frame from west at north wall, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from north at east wall in the 3rd room from north located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall, 1st window frame from north at east wall in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall, north wall and ceiling in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the foyer located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the foyer located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door frame from south at west wall in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • B

    Refit door in the 1st room from north at west located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the private hallway located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, west wall in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective window lower sash inner glass pane in the 1st room from north at west located at apt 2, 1st story, 1st apartment from north at east

    Oct 29, 2025 · Apt 2

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jun 10, 2025 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective lower window sash counter balance at west in the 1st room from north at west located at apt 55, 5th story, 1st apartment from south at west

    May 29, 2025 · Apt 55

    Closed — Violation closed
  • B

    Replace with new the missing upper escutcheon plate at heat riser pipe in the bathroom located at apt 55, 5th story, 1st apartment from south at west

    May 29, 2025 · Apt 55

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 3rd room from north located at apt 55, 5th story, 1st apartment from south at west

    May 29, 2025 · Apt 55

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 25, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 25

    Closed — Violation closed
  • B

    Properly secure the loose light fixture at ceiling in the 1st room from north located at apt 25, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 25

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 6th room from north located at apt 25, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 25

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 25, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 25

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 54, 5th story, 1st apartment from east at south

    Feb 26, 2025 · Apt 54

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electric light fixture at ceiling in the 2nd room from north located at apt 25, 2nd story, 1st apartment from south at west

    Jan 26, 2025 · Apt 25

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls throughout in the 1st room from north at east located at apt 5, 1st story, 2nd apartment from east at south

    Jan 3, 2025 · Apt 5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls throughout in the kitchen located at apt 5, 1st story, 2nd apartment from east at south

    Jan 3, 2025 · Apt 5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls throughout in the bathroom located at apt 5, 1st story, 2nd apartment from east at south

    Jan 3, 2025 · Apt 5

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5, 1st story, 2nd apartment from east at south

    Jan 3, 2025 · Apt 5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls throughout in the 2nd room from north located at apt 5, 1st story, 2nd apartment from east at south

    Jan 3, 2025 · Apt 5

    Closed — Violation dismissed
  • C

    Replace the broken or defective and/or missing water closet in the bathroom located at apt 25, 2nd story, 1st apartment from south at west

    Nov 25, 2024 · Apt 25

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective shut-off valve at radiator in the 1st room from north at west located at apt 25, 2nd story, 1st apartment from south at west

    Nov 25, 2024 · Apt 25

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor by radiator in the 2nd room from north at west located at apt 25, 2nd story, 1st apartment from south at west

    Nov 25, 2024 · Apt 25

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective shut-off valve at radiator in the 2nd room from north at west located at apt 25, 2nd story, 1st apartment from south at west

    Nov 25, 2024 · Apt 25

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective concrete floor in the bathroom located at apt 25, 2nd story, 1st apartment from south at west

    Nov 25, 2024 · Apt 25

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 25, 2nd story, 1st apartment from south at west

    Nov 25, 2024 · Apt 25

    Closed — Violation dismissed

DOB building violations · 25

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Elevator elevatorrequired

    Entire device is shut down. need to repair and re-inspection required. device is shut down due to water damage from fire in the building. cease use

    Mar 7, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain due to 2-alarm fire on 2/23/24.roof has large opening frm smoke vent cuts@roof&at evaluation bulkhead roof stair buckhead door missing.openings in ceilng@top of frm lvl exposing.1.nys pe or ra to immed eval ent bldg&dsgn rpair,2.clear debris,3.pe/ra to submit lettr to feu req prtl lift by 3/4/24

    Feb 27, 2024

    Dob violation - active
  • Immediate emergency anythingoptional

    Remedy : seal all fire damaged openings to protect the public and prop erty

    Feb 26, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 17, 2015

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 20, 2015

    Dob violation - dismissed
Show 15 more ↓
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 7, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 19, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 21, 2009

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 20, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    1p10395

    Dec 13, 2002

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p10395

    Nov 2, 2001

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 25, 1994

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 26, 1993

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 2, 1991

    Vp*-violation unserved ecb- dismissed

ECB violations · 33

  • Class - 3

    Access gain to 6 story building. observe in apt 2 on ground floor small cracks and severe location around the apartment and spalling pant., repair and or replace

    Oct 28, 2025

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #906964. remedy: submit acceptab

    Apr 8, 2025 · Penalty $2,500

    Active
  • Class - 1

    : failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition per 1rcny

    Jul 2, 2024

    Resolve
  • Class - 1

    Class 1: cease use: door lock monitoring inoperative check wires & repair. reinspection required (cu). right side brake pad damaged replace pads (cu). class 2: phone inoperative repair & connect service to 24 h

    Dec 5, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances.note:at time of inspection observed coping at courtyard west elevation broken ant at parate level of east south & west courtyard mortal joint deteriorating

    Dec 8, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit a required cycle 8c report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#806964. remedy: submit acceptable required technica

    Feb 13, 2020

    Resolve
  • Class - 2

    Failure to maintain building in a code compliant manner. at front of building the left wall at the basement area has a spreading crack., repair and/replace

    Nov 29, 2019 · Penalty $312

    Resolve
  • Class - 2

    11b19,16l10,16l10,67x10,68b7. 11b10-5' floor car station button inoperative; 16i10-5'floor door unable to close on its own; 16l10-basement floor door unable to close n its own; 67x10-in car phone not working.

    Mar 12, 2019 · Penalty $312

    Resolve
  • Class - 2

    2x10,52bb12,55bb12,59bb7,56y13,70o2. 2-x-10 outside comm inoperative repair. 52.bb.12 hoist rore tag expired reshackle. 55.bb.12 drum to counter weights tag bb reshackle. 59.bb.7 brake tag expired provide.70.o.

    Jan 4, 2019

    Resolve
  • Class - 1

    05m10,2l10. 05m10-door restrictor missing. this is upon inspection this safety device is missing causing this to be a hazardous conditionthe device was designed for passenger safety (cease use item) rmdy:rep

    Aug 30, 2017 · Penalty $250

    Resolve
Show 23 more ↓
  • Class - 1

    97x10 failure to maintain building in code compliant manner service equipment, elevator as per bc 3001.2 and 27-987. dob records show the only elevator in bldg as active. upon inspection the device is found to

    Oct 25, 2016 · Penalty $1,000

    Resolve
  • Class - 2

    16b01,70o02,71l10,67b11,37o02. 16b01-hoistway door insufficient adjust4th flr door; 70o02-pit dirty clean; 71l10-pit light defective repair replace; 67b11-communication insufficient replace/repair in car phone

    Aug 6, 2015

    Resolve
  • Class - 3

    Failure to maintain bldg in code compliant manner. noted: at front of bldg,exp#1,cellar level 4 brick masonry wall has minor hairline cracksat sealed windows outline. at rear yard fire escape egress to street

    Jul 10, 2015

    Resolve
  • Class - 2

    Failure to file an acceptable amended cycle 7 report to this department indicating correction of unsafe conditions described in initial local law fisp report.rem:file an amended report following remedial repair

    May 29, 2015

    Resolve
  • Class - 1

    Failure to provide safety measures(swat)as sidewalk sited,fence etc to protect public from unsafe conditions as per 1rcny103-04 & as per notification of unsafe complaint#1390499 by ra/pe dated 2/19/15.rem:provi

    Mar 25, 2015

    Resolve
  • Class - 2

    Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35119186n issued on 1/7/15 pursuant to 28-204.4 & 1rcny 102-01. for: the demolition of plaster wall & ceilings in apt#45

    Feb 21, 2015

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. noted: 3 male workers doing demolition,observed tossing heavy bags of debris from plastered(clgs)& walls from 4th fl window in

    Jan 7, 2015

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. noted: the demolition of plaster walls & ceilings in apt 45,produces a great amount of dust that affects residents of the bldg in

    Jan 7, 2015

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35117557y issued on 11/12/14 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Jan 7, 2015

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35117559h issued on 11/12/14 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Jan 7, 2015

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Jan 5, 2015

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at job site at time of inspection.noted: workers unable to provide approved and/or accepted plansfor inspection on 11/12/14.no plans on site for inspection.rmdy:provid

    Nov 12, 2014

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations.noted: construction work taking place in apt#22 affecting persons and property in apartment #2 with damage to window in bedroom

    Nov 12, 2014

    Resolve
  • Class - 1

    3303.10 repair and alteration operations in a occupied bldg. noted: attime of inspection no tenant protection plan posted or available for review.no reasonable protection being provided for tenants against haz

    Nov 12, 2014

    Resolve
  • Non-hazardous

    51b01,51k10,55y13,58e01,41g07,39y02,60t07,52h11,70h11,66o02,64q03,85m05,38o02,08v01,16b01,10b01,10h11,01i11,12q03,71k10,71m07,36o02,28m01. (51b) adjust hoist ropes to properly ride drum (51k) rouge lube/replace

    Nov 5, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    83## restore elevator back to service.

    Aug 8, 2006

    Resolve
  • Non-hazardous

    83-x-10/83-x-10-return to service for proper insp of elevator call dobwhen elevator is put back into service

    Aug 1, 2006 · Penalty $180

    Resolve
  • Non-hazardous

    01i06,03i06,07l11,08j01,16j01,16p07,21j01,28d06,34d06,36o02,38m07,46y10,66o02,72j01. 01- secure 03- repair floors 03-repair car light 07- repair 08-adjust 16-adjust on 5th,4th,3rd and basement for proper operat

    Jul 10, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    45h13 49h13 14o02 57o02 55m07 #74-o-02-clean car top.

    Oct 2, 2000

    Resolve
  • Non-hazardous

    74r,74k,33#,5j,57r, 74-skylight in overhead illegal replace with the right glassv 57-secure in pit.

    May 4, 1998 · Penalty $180

    Resolve
  • Non-hazardous

    57o,48e,48d,50y,37a,36d,35d,5e,75u,26m,33p,8o, 48-dead end rubbing main machine on the side 37-34-49 jumper remove and repair 23-cover missing limit switch.

    Apr 9, 1998

    Resolve
  • Hazardous

    17q,50y,33w,33i,36t,14m,15m,75u,33t,42l,1r.33-skylight 15 push plate cease use until drum machine linit are repaired and stop swwitch is installed as per code 210.2e running elev under cease use order 122894

    Jul 14, 1995 · Penalty $500

    Resolve
  • Non-hazardous

    05j,08v,09h,17q,18l,21x,25m,26m,28l,29m,32m,33i,33q,34i,50l,50x,54m, 46t,57o, (17)-bsmt. 18-5 fl 25x26-cover 29-spring briffor (32)-cover(33)- skylight (50)- machine limit 54- elevator co. name.

    Mar 12, 1992 · Penalty $150

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Oct 12, 2026 · Apt 63

    Open
  • Unsanitary condition

    Pests

    Oct 12, 2026 · Apt 63

    Open
  • Unsanitary condition

    Pests

    Oct 12, 2026 · Apt 63

    Open
  • Unsanitary condition

    Pests

    Jul 2, 2026 · Apt 25

    Close
  • Unsanitary condition

    Pests

    Jul 2, 2026 · Apt 25

    Close
  • Electric

    Outlet/switch

    Jul 2, 2026 · Apt 25

    Close
  • Paint/plaster

    Wall

    Jul 2, 2026 · Apt 25

    Close
  • Paint/plaster

    Wall

    Jul 2, 2026 · Apt 25

    Close
  • Unsanitary condition

    Mold

    Jul 2, 2026 · Apt 25

    Close
  • Plumbing

    Radiator

    Jul 2, 2026 · Apt 25

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Jul 2, 2026 · Apt 25

    Close
  • Water leak

    Damp spot

    Jul 2, 2026 · Apt 25

    Close
  • Water leak

    Damp spot

    Jun 8, 2026 · Apt 25

    Close
  • Flooring/stairs

    Floor

    Jun 8, 2026 · Apt 25

    Close
  • Plumbing

    Radiator

    Jun 8, 2026 · Apt 25

    Close
  • Unsanitary condition

    Mold

    Jun 8, 2026 · Apt 25

    Close
  • Paint/plaster

    Ceiling

    Jun 8, 2026 · Apt 25

    Close
  • Paint/plaster

    Wall

    Jun 8, 2026 · Apt 25

    Close
  • Plumbing

    Basin/sink

    Jun 8, 2026 · Apt 25

    Close
  • Electric

    Outlet/switch

    Jun 8, 2026 · Apt 25

    Close
  • Unsanitary condition

    Pests

    Jun 8, 2026 · Apt 25

    Close
  • Heat/hot water

    Entire building

    Apr 25, 2026 · Apt 53

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt 34

    Close
  • Unsanitary condition

    Pests

    Mar 11, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Mar 11, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2026 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Feb 4, 2026 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jan 28, 2026 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Oct 28, 2025 · Apt 2

    Close
  • Door/window

    Door frame

    Oct 28, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Oct 28, 2025 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2025 · Apt 53

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2025 · Apt 34

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 21, 2025 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Jun 26, 2025 · Apt 22

    Close
  • Paint/plaster

    Ceiling

    Jun 26, 2025 · Apt 22

    Close
  • Unsanitary condition

    Pests

    Jun 26, 2025 · Apt 22

    Close
  • Paint/plaster

    Wall

    Jun 26, 2025 · Apt 22

    Close
  • Paint/plaster

    Ceiling

    Jun 26, 2025 · Apt 22

    Close
  • Water leak

    Heavy flow

    Jun 21, 2025 · Apt 22

    Close
  • Paint/plaster

    Ceiling

    Jun 21, 2025 · Apt 22

    Close
  • Paint/plaster

    Wall

    Jun 21, 2025 · Apt 22

    Close
  • Unsanitary condition

    Pests

    Jun 21, 2025 · Apt 22

    Close
  • Paint/plaster

    Ceiling

    Jun 21, 2025 · Apt 22

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 29, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1904
Floors
6
Residential units
30
Building area
31,470 ft²
Lot area
7,411 ft²
Zoning
R7A
Community board
109
Council district
9
Block / lot
2053 / 111
Assessed value
$1,554,300
Landmark / historic district
Hamilton Heights / Sugar Hill Historic District Extension

HPD registration #104203, last renewed Aug 25, 2025.

Questions about 2 St Nicholas Place

Who owns 2 St Nicholas Place?

The owner of record in NYC Department of City Planning PLUTO data is Hudson Valley King LLC.

Does 2 St Nicholas Place have violations?

Yes. NYC HPD has recorded 879 housing violations at this property.

Is 2 St Nicholas Place rent stabilized?

NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 67% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2 St Nicholas Place built?

City records list 1904 as the year it was built.

How many apartments are in 2 St Nicholas Place?

It has 30 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.