roofy

2591 Fredrick Douglass Bl

Manhattan, NY 10030BBL 1-02041-0047Map

Owner of record: 2591 Realty LLC

2591 Fredrick Douglass Bl is a walk-up apartment building built in 1920 in Manhattan, 10030. It has 8 residential units across 5 floors. The owner of record is 2591 Realty LLC. HPD has recorded 435 housing violations here, most recently on July 29, 2026. 4 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.

HPD violations
435
DOB violations
9
ECB violations
0
HPD complaints
462

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
4
About 50% of the building's 8 apartments
Down from 8 in 2020

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 435

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 2nd door from west at north wall in the private hallway located at apt 3b, 4th story, 1st apartment from east at south

    Jul 29, 2026 · Apt 3B

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the bathroom , the 2nd room from east at south located at apt 3b, 4th story, 1st apartment from east at south

    Jul 29, 2026 · Apt 3B

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 3b, 4th story, 1st apartment from east at south

    Jul 29, 2026 · Apt 3B

    Open — First no access to re- inspect violation
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3b, 4th story, 1st apartment from east at south

    Jul 29, 2026 · Apt 3B

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department at east wall at public hall, 2nd story

    Jul 21, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 5th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 3B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 2nd story

    Jul 21, 2026

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north, south and west walls in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east

    Jul 21, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east

    Jul 21, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east

    Jul 21, 2026 · Apt 2A

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective base cabinet in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east

    Jul 21, 2026 · Apt 2A

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 2a, 2nd story, 1st apartment from north at east

    Jul 21, 2026 · Apt 2A

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Jul 21, 2026 · Apt 2A

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak above ceiling at public hall, 1st story

    Apr 22, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant matrial at ceiling at public hall, 1st story

    Apr 22, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door

    Mar 24, 2026

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 1st room from east at south located at apt 3b, 4th story, 1st apartment from east at south

    Mar 6, 2026 · Apt 3B

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling and west wall in the bathroom located at apt 3b, 4th story, 1st apartment from east at south

    Feb 20, 2026 · Apt 3B

    Closed — Violation closed
  • A

    Refit doors at sink base cabinet in the kitchen located at apt 3b, 4th story, 1st apartment from east at south

    Feb 20, 2026 · Apt 3B

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroom located at apt 3b, 4th story, 1st apartment from east at south

    Feb 20, 2026 · Apt 3B

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 3b, 4th story, 1st apartment from east at south

    Feb 20, 2026 · Apt 3B

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective glass pane at building front entrance door , 1st story

    Aug 19, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south

    Aug 19, 2025 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective wash basin in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south

    Aug 19, 2025 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1b, 2nd story, 1st apartment from east at south

    Aug 19, 2025 · Apt 1B

    Open — First no access to re- inspect violation
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Jul 22, 2025

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3b, 4th story, 1st apartment from east at south

    Jun 10, 2025 · Apt 3B

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of window guard at window leading to fire escape in the 2nd room from east at south located at apt 3b, 4th story, 1st apartment from east at south

    Jun 10, 2025 · Apt 3B

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 4th story, 1st apartment from east at south

    Jun 10, 2025 · Apt 3B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3b, 4th story, 1st apartment from east at south

    Jun 10, 2025 · Apt 3B

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3b, 4th story, 1st apartment from east at south

    Jun 10, 2025 · Apt 3B

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Oct 23, 2024

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 23, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Oct 23, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Oct 23, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Oct 23, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    May 2, 2024

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceilng and all walls in the kitchen located at apt 1a, 1st story, 1st apartment from north at east

    May 2, 2024 · Apt 1A

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    May 2, 2024

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    May 2, 2024 · Apt 1A

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    May 2, 2024

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceilng in the foyer located at apt 1a, 1st story, 1st apartment from north at east

    May 2, 2024 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    May 2, 2024

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    May 2, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective bell/buzzer intercom system from building entrance to return unit at west wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east

    May 2, 2024 · Apt 1A

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing

    May 2, 2024

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceilng and all walls in the foyer located at apt 1a, 1st story, 1st apartment from north at east

    May 2, 2024 · Apt 1A

    Closed — Violation closed
  • B

    Provide adequate supply of cold water for the fixtures .. in the bathroom located at apt 1a, 1st story, 1st apartment from north at east

    May 2, 2024 · Apt 1A

    Closed — Violation closed

DOB building violations · 9

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jul 27, 1995

    Dob violation - active
  • Electric signs none

    Es-electric signs none

    Jul 27, 1995

    Dob violation - active

ECB violations · 0

No ECB violations on record

Complaints

  • Paint/plaster

    Wall

    Mar 21, 2026 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Mar 21, 2026 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Mar 21, 2026 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Mar 21, 2026 · Apt 3A

    Close
  • Electric

    Wiring

    Mar 21, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Mar 21, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Mar 21, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Mar 21, 2026 · Apt 3A

    Close
  • Door/window

    Door

    Mar 21, 2026 · Apt 3A

    Close
  • Electric

    Outlet/switch

    Mar 21, 2026 · Apt 3A

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Mar 21, 2026 · Apt 3A

    Close
  • Water leak

    Damp spot

    Mar 21, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Mar 21, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Mar 21, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Sep 25, 2025 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Jul 19, 2025 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Jul 19, 2025 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jul 19, 2025 · Apt 3A

    Close
  • General

    Bell/buzzer/intercom

    Jul 19, 2025 · Apt 3A

    Close
  • Electric

    Wiring

    Jul 19, 2025 · Apt 3A

    Close
  • Electric

    Outlet/switch

    Jul 19, 2025 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Jul 19, 2025 · Apt 3A

    Close
  • General

    Cabinet

    Jul 19, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Jul 19, 2025 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Jul 19, 2025 · Apt 3A

    Close
  • Door/window

    Door

    Oct 8, 2024 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    May 9, 2024 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    May 5, 2024 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 2, 2024 · Apt 3A

    Close
  • Electric

    Outlet/switch

    May 2, 2024 · Apt 3A

    Close
  • Paint/plaster

    Wall

    May 2, 2024 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 2, 2024 · Apt 1A

    Close
  • General

    Bell/buzzer/intercom

    May 2, 2024 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 2, 2024 · Apt 3A

    Close
  • Paint/plaster

    Wall

    May 2, 2024 · Apt 3A

    Close
  • Door/window

    Door

    May 2, 2024 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    May 2, 2024 · Apt 3A

    Close
  • Plumbing

    Water supply

    May 2, 2024 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 2, 2024 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 2, 2024 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 2, 2024 · Apt 3A

    Close
  • Safety

    Smoke detector

    May 2, 2024 · Apt 3A

    Close
  • Safety

    Carbon monoxide detector

    May 2, 2024 · Apt 3A

    Close
  • Plumbing

    Water supply

    May 2, 2024 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    May 2, 2024 · Apt 3A

    Close
  • Plumbing

    Water supply

    May 2, 2024 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    May 2, 2024 · Apt 1A

    Close
  • General

    Bell/buzzer/intercom

    Apr 16, 2024 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Apr 4, 2024 · Apt 3A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1920
Floors
5
Residential units
8
Building area
7,010 ft²
Lot area
1,500 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
2041 / 47
Assessed value
$371,250
Landmark / historic district
No

HPD registration #128203, last renewed May 1, 2026.

Questions about 2591 Fredrick Douglass Bl

Who owns 2591 Fredrick Douglass Bl?

The owner of record in NYC Department of City Planning PLUTO data is 2591 Realty LLC.

Does 2591 Fredrick Douglass Bl have violations?

Yes. NYC HPD has recorded 435 housing violations at this property.

Is 2591 Fredrick Douglass Bl rent stabilized?

NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 50% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2591 Fredrick Douglass Bl built?

City records list 1920 as the year it was built.

How many apartments are in 2591 Fredrick Douglass Bl?

It has 8 residential units and 10 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.