665 Lenox Avenue
Manhattan, NY 10037BBL 1-02012-0029Map
Owner of record: 665 Lenox Ave Holdings LLC
665 Lenox Avenue is a walk-up apartment building built in 1920 in Manhattan, 10037. It has 20 residential units across 6 floors. The owner of record is 665 Lenox Ave Holdings LLC. HPD has recorded 288 housing violations here, most recently on June 11, 2026. 16 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 288
- DOB violations
- 19
- ECB violations
- 21
- HPD complaints
- 854
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 288
- CImmediately hazardous
Remove the illegal fastening self locking panic bar installed on roof door that does not allow re-entry from roof to public hall
Jun 11, 2026
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 8, 2nd story, 1st apartment from north at east
May 25, 2026 · Apt 8
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline pipe at sink in the kitchen located at apt 16, 4th story, 1st apartment from north at east
May 25, 2026 · Apt 16
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 8, 2nd story, 1st apartment from north at east
Mar 27, 2026 · Apt 8
Open — Violation will be reinspected - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 8, 2nd story, 1st apartment from north at east
Mar 27, 2026 · Apt 8
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 8, 2nd story, 1st apartment from north at east
Mar 27, 2026 · Apt 8
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 8, 2nd story, 1st apartment from north at east
Mar 27, 2026 · Apt 8
Open — Violation will be reinspected - BHazardous
Repair the leaky and/or defective faucets drain at sink in the kitchen located at apt 8, 2nd story, 1st apartment from north at east
Mar 27, 2026 · Apt 8
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 8, 2nd story, 1st apartment from north at east
Mar 27, 2026 · Apt 8
Open — Violation will be reinspected
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 8, 2nd story, 1st apartment from north at east
Mar 27, 2026 · Apt 8
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 16, 4th story, 1st apartment from north at east
Mar 9, 2026 · Apt 16
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 16, 4th story, 1st apartment from north at east
Mar 9, 2026 · Apt 16
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 16, 4th story, 1st apartment from north at east
Mar 9, 2026 · Apt 16
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 16, 4th story, 1st apartment from north at east
Mar 9, 2026 · Apt 16
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 4th story, 1st apartment from south at west
Mar 6, 2026 · Apt 10
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Mar 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 6, 2026 · Apt 2
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 2, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and east wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at the ceiling and west wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation metal riser in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and west wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 20 square feet at the ceiling, north wall, and west wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Mar 2, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective radiator shut-off releasing steam and water in the 5th room from east located at apt 1, 2nd story, 2nd apartment from south at west
Feb 27, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective radiator shut-off releasing steam and water in the 1st room from east located at apt 1, 2nd story, 2nd apartment from south at west
Feb 27, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9, 3rd story, 2nd apartment from south at west
Nov 29, 2025 · Apt 9
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9, 3rd story, 2nd apartment from south at west
Nov 29, 2025 · Apt 9
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Nov 29, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling and all walls throughout in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Nov 5, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Nov 5, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Oct 18, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors missing at all stories at public hall
Oct 15, 2025
Open — Violation will be reinspected - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Oct 15, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 4th story, 1st apartment from south at west
Oct 15, 2025 · Apt 10
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 2nd apartment from south at west
Oct 11, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Oct 11, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 2nd story, 2nd apartment from south at west
Oct 11, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Oct 6, 2025
Closed — Violation closed
DOB building violations · 19
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 25, 2020
Dob violation - dismissed - Emergency none
Install approx. 110 linear feet of sidewalk shed along exp#1(west 143 st)& approx.50 liner feet of sidewalk shed along exposure#4(lenox ave) add additional 5 linear feet of sidewalk shed to overlap adjacent properties to safeguard the public and property
Aug 26, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed
Show 9 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jul 28, 1995
Dob violation - active - Electric signs none
Es-electric signs none
Jul 25, 1995
Dob violation - active - Electric signs none
Es-electric signs none
Jul 25, 1995
Dob violation - active
ECB violations · 21
- Class - 2
Failure to maintain building in code-compliant manner. observed at 1st floor main lobby 2 piles of combustible material cardboard boxes & wood stored at rear breeze way door creating potential fire condition fo
Aug 8, 2026
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #390275785 issued on 08/26/20 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.failure to maintain bldg wall
Nov 2, 2020 · Penalty $625
Resolve - Class - 2
3314.10.2-partial stop work order on suspended scaffold note at the time of my inspection observed suspended scaffold in place with c hook reating on cornice with parapet comply with code provide (ongoing) per
Oct 21, 2020
Resolve - Class - 2
Pedestrian protection does not meet code specifications note at the time of my inspection i observed sidewalk shed in place wthout information panel on parapet comply with code provide information panel
Oct 21, 2020
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances: noted: upon inspection observed the facade at exposure 1 and 4 deteriorating. exposure 1 observed several holes in the cornice and cracks. exposure 4 obser
Aug 26, 2020 · Penalty $2,500
Resolve - Class - 2
Failrue to comply w/the comm's order to file a c of c w/the dob's for ecb vio#35257702x issued on 6-13-17. remedy: d file a c of c.
Mar 14, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dob's for ecb vio#35257759r issued on 6-13-17. remedy: file a c of c.
Mar 14, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dob's for ecb vio#35257760y issued on 6-13-17. remedy: file a c of c.
Mar 14, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dob's for ecb vio#35257761x issued on 6-13-17. remedy: file a c of c.
Mar 14, 2018 · Penalty $1,250
Resolve - Class - 1
Work w/o a permit. work noted: gained access to apt 8 & observed the layout of original plumbing system changed. in particular,the kitchen area was moved & renovated. new gas lines,water lines,vent lines,& wast
Aug 9, 2017
Resolve
Show 11 more ↓
- Class - 1
Failure to have new or altered plumbing system tested. work noted: gained access to apt 8 & observed the layout of original plumbing system changed. new gas lines,water lines,vent lines & waste lines installed
Aug 9, 2017 · Penalty $1,000
Resolve - Class - 1
Electrical work w/o a permit. work noted: gained access to apt 8 & observed the kitchen area rewired w/the addition of new branch wiring to feed lighting fixtures,switches,outlets,etc. all of this electrical
Aug 9, 2017
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent residentialpurposes.dob records indicates 20 class "a" apts m/d now apt #11 used/converted to transient use.rem:discontinue illegal occupancy.
Jun 13, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to maintain building in code compliant manner.failure to provide number of required means of egress for every floor per bc1018.1 and27-366 for transient use.rem:discontinue illegal occupancy.
Jun 13, 2017 · Penalty $1,200
Resolve - Class - 1
Bc907.2.8/failure to provide fire alarm system for transient use.rem:discontinue illegal occupancy.
Jun 13, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of a systemof automatic sprinklers where is required as per bc902.1 and 27-854 for transient use.rem:discontinue illegal occupancy.
Jun 13, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to maintain building interior defect noted: at 1st fl rear concrete floor partially collapsed approx 12x12 area at rear of store. concrete slab partially collapsed into cellar. vacate order issed for
Jan 27, 2012 · Penalty $1,000
Resolve - Class - 3
Work w/o a permit noted at the 1fl commercial space has been cleared out of all existing partitions and ceiling coverings thus exposing the ceiling joist and erected new partitions w/ new electric outlets and c
Sep 2, 2008
Resolve - Hazardous
Failure to maintain exterior wall defect is brick masonary are defective w/vertical cracks & horizontal at front wall of the 1 story bldg.remedy:make all necessary repairs.
Jan 18, 2007 · Penalty $2,000
Resolve - Non-hazardous
Failure to maintain exterior wall defect is brick masonry are defective with vertical cracks @ rear & horizontal cracks @ front wall of the one story bldg @ west side.remedy:make all necessary repairs in a safe
Sep 22, 2006 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior bldg wall defects noted: at sixth floor exterior wall south east corner of window sill is broken, loose & in disrepair. also noted south cornice of roof rotten with holes at four
Oct 12, 2005 · Penalty $800
Resolve
Complaints
- Flooring/stairs
Floor
Jun 23, 2026 · Apt 6
Close - General
Cabinet
Jun 23, 2026 · Apt 6
Close - Unsanitary condition
Pests
May 24, 2026 · Apt 1STFLO
Close - Appliance
Electric/gas range
May 22, 2026 · Apt 20
Open - Unsanitary condition
Pests
May 7, 2026 · Apt 8
Close - Appliance
Electric/gas range
Apr 29, 2026 · Apt 20
Open - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 17, 2026 · Apt 8
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 1, 2026 · Apt 1
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt 6
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 1
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 3
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt 2
Close - Plumbing
Basin/sink
Oct 16, 2025 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 20
- Building area
- 19,546 ft²
- Lot area
- 4,000 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 2012 / 29
- Assessed value
- $1,485,900
- Landmark / historic district
- No
HPD registration #106089, last renewed Jul 23, 2026.
Questions about 665 Lenox Avenue
Who owns 665 Lenox Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 665 Lenox Ave Holdings LLC.
Does 665 Lenox Avenue have violations?
Yes. NYC HPD has recorded 288 housing violations at this property.
Is 665 Lenox Avenue rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 25% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 665 Lenox Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 665 Lenox Avenue?
It has 20 residential units and 27 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.