roofy

2413 Adam C Powell Blvd

Manhattan, NY 10030BBL 1-02009-0061Map

Owner of record: 2411 Adam Clayton Powell,

2413 Adam C Powell Blvd is a walk-up apartment building built in 1903 in Manhattan, 10030. It has 13 residential units across 5 floors. The owner of record is 2411 Adam Clayton Powell,. HPD has recorded 55 housing violations here, most recently on November 12, 2024. 25 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.

HPD violations
55
DOB violations
12
ECB violations
3
HPD complaints
138

What to know

Concern
18 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 12, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
4
About 31% of the building's 13 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 55

  • C

    Abate the infestation consisting of rodents rat in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Nov 12, 2024 · Apt 3R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Nov 12, 2024 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 4, 2022 · Apt 3R

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 4, 2022 · Apt 3R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 4, 2022 · Apt 3R

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 4, 2022 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 4, 2022 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperable located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 4, 2022 · Apt 3R

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 4, 2022 · Apt 3R

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 4, 2022 · Apt 3R

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Provide dwelling with a janitor or responsible person or janitorial service.

    Apr 13, 2018

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Apr 13, 2018

    Closed — Violation closed
  • C

    Fire escape defective. properly secure 1st tread up from 4th sty balcony at northwest fire escape at building front

    Jul 11, 2016

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective metal cornice at west section of parapet wall at building front

    Jul 11, 2016

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective metal cornice at east section of parapet wall at building front

    Jul 11, 2016

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Jul 11, 2016

    Closed — Violation closed
  • B

    Replace with new the missing metal cap at lintels over windows at 2nd ,4th and 5th sty at northwest corner at west ssection.

    Jul 11, 2016

    Open — Not complied with
  • B

    Replace with new the missing metal caps at lintels over windows at 2nd and 5th sty at northwest corner north section.

    Jul 11, 2016

    Open — Not complied with
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes meta can lids at 2nd story balcony at northeast fire escape at building front.

    Jul 11, 2016

    Open — Not complied with
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Feb 26, 2016

    Open — Not complied with
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Feb 26, 2016

    Open — Not complied with
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Feb 26, 2016

    Closed — Violation closed
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty latch and lockset at the building entrance door at public hall, 1st story

    Feb 26, 2016

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of an unaccepatable electromagnetic locking device installed at the building entrance door at public hall, 1st story

    Feb 26, 2016

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Feb 26, 2016

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective fire retardant ceiling and east wall at the vestibule at public hall, 1st story

    Feb 26, 2016

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and east wall at the vestibule at public hall, 1st story

    Feb 26, 2016

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches located at apt 3f, 3rd story, 1st apartment from west at north

    Feb 10, 2016 · Apt 3F

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice located at apt 3f, 3rd story, 1st apartment from west at north

    Feb 10, 2016 · Apt 3F

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3r, 3rd story, apartment at east

    Jul 11, 2012 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector ''missing'' in the entire apartment located at apt 3r, 3rd story, apartment at east

    Jul 11, 2012 · Apt 3R

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective escutcheon plate around steam riser in ceiling in the 4th room from east located at apt 2c, 2nd story, 1st apartment from west at north

    Jun 21, 2012 · Apt 2C

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 1st room from east at south located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 29, 2005 · Apt 3R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 5th room from east located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 29, 2005 · Apt 3R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 29, 2005 · Apt 3R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. south radiator in the 1st room from east at south located at apt 4r, 4th story, 1st apartment from north at east

    Apr 4, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. east wall in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from north at east

    Apr 4, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. west wall in the 1st room from east at south located at apt 4r, 4th story, 1st apartment from north at east

    Apr 4, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the private hallway located at apt 4r, 4th story, 1st apartment from north at east

    Apr 4, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the bathroom located at apt 4r, 4th story, 1st apartment from north at east

    Apr 4, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling in the bathroom located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. center riser in the bathroom located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. center door frame in the bathroom located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. center baseboard in the kitchen located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling, east wall in the kitchen located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling, west wall in the private hallway located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. center radiator in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling, east wall, south wall in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. center door, center door frame in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. west wall in the 1st room from east at south located at apt 4r, 4th story, 1st apartment from north at east

    Mar 26, 2004 · Apt 4R

    Open — First no access to re- inspect violation

DOB building violations · 12

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Emergency none

    Egncy-emergency none

    Oct 25, 1994

    Dob violation - dismissed
Show 2 more ↓
  • Construction other optional

    C-construction other optional

    Oct 23, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed

ECB violations · 3

  • Non-hazardous

    Failure to maintain exterior bldg (chimney) defects noted at rear of bldg top section chimney cap have fallen from roof level where chimney extend pass parapet walls. this also caused damage to adj property

    Jan 25, 2007 · Penalty $800

    Resolve
  • Hazardous

    Insufficient containers provided for the storage of demilition debris.noted: demolition combustable wooden construction debris store in the rear yard. creating a hazardous condition. debris 20'-0" x 20'-0" x 12

    May 10, 2002 · Penalty $500

    Resolve
  • Hazardous

    Exit passageway or corridor: total obstruction. obstruction noted: therear fire refuge area totally obstructed with approx. 20'-0" x 20'-0" x 12'-0"high demolished construction debris wooden combustable materia

    May 10, 2002 · Penalty $480

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Jul 21, 2026 · Apt 3R

    Open
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    Oct 5, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2024 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2023 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Feb 22, 2023 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    Mar 3, 2022 · Apt 3R

    Close
  • Plumbing

    Radiator

    Mar 3, 2022 · Apt 3R

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Mar 3, 2022 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Mar 3, 2022 · Apt 3R

    Close
  • Plumbing

    Radiator

    Mar 3, 2022 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Feb 18, 2022 · Apt 3R

    Close
  • Plumbing

    Radiator

    Feb 18, 2022 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Feb 18, 2022 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2022 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2021 · Apt 4C

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2020 · Apt 3R

    Close
  • General

    Janitor/super

    Apr 11, 2018 · Apt BASEME

    Close
  • Safety

    Fire escape

    Jul 11, 2016 · Apt 11

    Close
  • Unsanitary condition

    Pests

    Feb 7, 2016 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Feb 7, 2016 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Feb 7, 2016 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Feb 7, 2016 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Feb 7, 2016 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Feb 7, 2016 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Nov 28, 2014 · Apt 3R

    Close
  • General

    Mold

    Jul 6, 2012 · Apt 3R

    Close
  • Nonconst

    Vermin

    Jul 6, 2012 · Apt 3R

    Close
  • Nonconst

    Vermin

    May 29, 2012 · Apt 2C

    Close
  • General

    Windows

    Mar 19, 2012 · Apt 3R

    Close
  • General

    Cabinet

    Mar 19, 2012 · Apt 3R

    Close
  • Plumbing

    Bathtub/shower

    Mar 19, 2012 · Apt 3R

    Close
  • Electric

    Wiring

    Mar 19, 2012 · Apt 3R

    Close
  • General

    Floor

    Mar 19, 2012 · Apt 3R

    Close
  • Electric

    Wiring

    Mar 19, 2012 · Apt 3R

    Close
  • General

    Cabinet

    Mar 19, 2012 · Apt 3R

    Close
  • Appliance

    Refrigerator

    Mar 19, 2012 · Apt 3R

    Close
  • General

    Floor

    Mar 19, 2012 · Apt 3R

    Close
  • Appliance

    Electric/gas range

    Mar 19, 2012 · Apt 3R

    Close
  • General

    Floor

    Feb 1, 2011 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Feb 1, 2011 · Apt 3R

    Close
  • General

    Mold

    Feb 1, 2011 · Apt 3R

    Close
  • Plumbing

    Bathtub/shower

    Feb 1, 2011 · Apt 3R

    Close
  • Electric

    Wiring

    Feb 1, 2011 · Apt 3R

    Close
  • General

    Floor

    Sep 14, 2010 · Apt F4

    Close
  • General

    Windows

    Sep 14, 2010 · Apt F4

    Close
  • Paint/plaster

    Wall

    Sep 14, 2010 · Apt F4

    Close
  • Nonconst

    Vermin

    Sep 14, 2010 · Apt F4

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1903
Floors
5
Residential units
13
Building area
14,170 ft²
Lot area
3,150 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
2009 / 61
Assessed value
$1,383,300
Landmark / historic district
No

HPD registration #101304, last renewed Sep 12, 2025.

Questions about 2413 Adam C Powell Blvd

Who owns 2413 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is 2411 Adam Clayton Powell,.

Does 2413 Adam C Powell Blvd have violations?

Yes. NYC HPD has recorded 55 housing violations at this property.

Is 2413 Adam C Powell Blvd rent stabilized?

NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 31% of its 13 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2413 Adam C Powell Blvd built?

City records list 1903 as the year it was built.

How many apartments are in 2413 Adam C Powell Blvd?

It has 13 residential units and 15 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.