2403 Adam C Powell Blvd
Manhattan, NY 10030BBL 1-02009-0003Map
Owner of record: Pact Renaissance Collaborative LLC
2403 Adam C Powell Blvd is a walk-up apartment building built in 1910 in Manhattan, 10030. It has 10 residential units across 5 floors. The owner of record is Pact Renaissance Collaborative LLC. HPD has recorded 40 housing violations here, most recently on April 29, 2026.
- HPD violations
- 40
- DOB violations
- 9
- ECB violations
- 1
- HPD complaints
- 65
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 40
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east located at apt 5a, 5th story, 1st apartment from north at east
Apr 6, 2024 · Apt 5A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling 2sq. ft in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Apr 6, 2024 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective metal rails at stairs leading to basement door at building front
Apr 6, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 5a, 5th story, 1st apartment from north at east
Apr 6, 2024 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Apr 6, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Apr 4, 2024 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at north located at apt 5a, 5th story, 1st apartment from north at east
Mar 23, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 3rd room from east at north located at apt 5a, 5th story, 1st apartment from north at east
Mar 23, 2024 · Apt 5A
Closed — Violation closed
Show 30 more ↓
- BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east
Mar 20, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at north wall at public hall, 2nd story
Apr 16, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Apr 16, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls at public hall, 1st story
Apr 16, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Jan 17, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Jan 17, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Nov 26, 2022 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Nov 26, 2022 · Apt 1A
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from south at west
Nov 1, 2022 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Nov 1, 2022 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Nov 1, 2022
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the foyer located at apt 2b, 2nd story, 1st apartment from south at west
Nov 1, 2022 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at fixtures in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
Oct 9, 2022 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at fixtures in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
Oct 9, 2022 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective broken baseboard cast iron radator at public hall, 3rd story
Oct 9, 2022
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and walls in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jul 11, 2022 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective silicone caulking at bathtub area in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jul 26, 2021 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 26, 2021
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 16, 2021 · Apt 2B
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 16, 2021
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 16, 2021 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed
DOB building violations · 9
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
B254 ftm as per 27-2033 ý access to boiler room¨ must post a visible sign in vestibule of building to be seen from outer door, as to where key to boiler room can be found, as well as supers location phone# and
Apr 22, 2021 · Penalty $625
Resolve
Complaints
- Paint/plaster
Ceiling
Aug 28, 2026 · Apt 4B
Close - Water leak
Heavy flow
Aug 28, 2026 · Apt 4B
Close - Appliance
Electric/gas range
Nov 4, 2025 · Apt 5B
Close - Plumbing
Basin/sink
Nov 4, 2025 · Apt 5B
Close - Unsanitary condition
Mold
Nov 4, 2025 · Apt 5B
Close - Flooring/stairs
Floor
Nov 4, 2025 · Apt 5B
Close - General
Cabinet
Nov 4, 2025 · Apt 5B
Close - Unsanitary condition
Pests
Nov 4, 2025 · Apt 5B
Close - General
Bell/buzzer/intercom
Nov 4, 2025 · Apt 5B
Close - Paint/plaster
Ceiling
Apr 2, 2024 · Apt 5A
Close
Show 40 more ↓
- Water leak
Heavy flow
Apr 2, 2024 · Apt 5A
Close - Paint/plaster
Ceiling
Mar 19, 2024 · Apt 5A
Close - Water leak
Heavy flow
Mar 19, 2024 · Apt 5A
Close - Heat/hot water
Entire building
Mar 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 11, 2023 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 7, 2023 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 7, 2023 · Apt 2B
Close - Flooring/stairs
Floor
Feb 6, 2023 · Apt 2B
Close - Water leak
Slow leak
Feb 6, 2023 · Apt 2B
Close - Safety
Smoke detector
Feb 6, 2023 · Apt 2B
Close - Paint/plaster
Wall
Feb 6, 2023 · Apt 2B
Close - Unsanitary condition
Pests
Jan 25, 2023 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 16, 2023 · Apt 2B
Close - Door/window
Window frame
Jan 15, 2023 · Apt 2B
Close - Door/window
Window frame
Jan 15, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Jan 15, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 14, 2023 · Apt BLDG
Close - Electric
No lighting
Jan 14, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 25, 2022 · Apt 1A
Close - Heat/hot water
Entire building
Dec 4, 2022 · Apt BLDG
Close - Flooring/stairs
Floor
Dec 1, 2022 · Apt 2B
Close - Paint/plaster
Wall
Dec 1, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 24, 2022 · Apt 2B
Close - Heat/hot water
Entire building
Nov 15, 2022 · Apt 5A
Close - Unsanitary condition
Pests
Nov 14, 2022 · Apt 1A
Close - Heat/hot water
Apartment only
Nov 13, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 10, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 8, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Oct 30, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Oct 29, 2022 · Apt 2B
Close - Heat/hot water
Entire building
Oct 20, 2022 · Apt 5A
Close - Heat/hot water
Entire building
Oct 20, 2022 · Apt 3A
Close - Heat/hot water
Entire building
Oct 9, 2022 · Apt 2B
Close - Water leak
Damp spot
Oct 9, 2022 · Apt 2B
Close - Plumbing
Water supply
Oct 9, 2022 · Apt BUILDI
Close - Heat/hot water
Entire building
Oct 9, 2022 · Apt BUILDI
Close - Safety
Fire escape
Sep 11, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 24, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1910
- Floors
- 5
- Residential units
- 10
- Building area
- 10,470 ft²
- Lot area
- 2,733 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 2009 / 3
- Assessed value
- $530,100
- Landmark / historic district
- No
HPD registration #144835, last renewed Jul 30, 2026.
Questions about 2403 Adam C Powell Blvd
Who owns 2403 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Pact Renaissance Collaborative LLC.
Does 2403 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 40 housing violations at this property.
Is 2403 Adam C Powell Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2403 Adam C Powell Blvd built?
City records list 1910 as the year it was built.
How many apartments are in 2403 Adam C Powell Blvd?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.