621 West 135 Street
Manhattan, NY 10031BBL 1-02002-0017Map
Owner of record: Deena Realty Corp
621 West 135 Street is a walk-up apartment building built in 1905 in Manhattan, 10031. It has 20 residential units across 5 floors. The owner of record is Deena Realty Corp. HPD has recorded 62 housing violations here, most recently on August 25, 2026. 3 of the 50 most recent violations are still open. City tax records listed 21 rent-stabilized apartments here in 2024.
- HPD violations
- 62
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 103
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 62
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Aug 25, 2026 · Apt 1B
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Aug 25, 2026 · Apt 1B
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective latch set at vestibule door , 1st story
May 22, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story
May 22, 2026
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 11, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of ladder and construction materials at public hall, 1st story
May 11, 2026
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st dumb waiter from east at south wall in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Apr 12, 2026 · Apt 1B
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from north at east, the 3rd room from north at west located at apt 1b, 1st story, 1st apartment from south at west
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain glazed finish at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Apr 12, 2026 · Apt 1B
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Apr 12, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from east at south wall in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Apr 12, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Apr 12, 2026 · Apt 1B
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 2d,3d .... vacate order #182067
Nov 5, 2021
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 3d, 3rd story, 2nd apartment from west at north
Oct 25, 2021 · Apt 3D
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 2d, 2nd story, 2nd apartment from west at north
Oct 25, 2021 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane at lower sash window in the 1st room from north at east located at apt 3c, 3rd story, 1st apartment from west at north
Oct 25, 2021 · Apt 3C
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to the fire escape window in the 1st room from north at east located at apt 3c, 3rd story, 1st apartment from west at north
Oct 25, 2021 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3c, 3rd story, 1st apartment from west at north
Oct 25, 2021 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective mortise door lock in the entrance located at apt 3c, 3rd story, 1st apartment from west at north
Oct 25, 2021 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective mortise door lock in the entrance located at apt 5d, 5th story, 2nd apartment from west at north
Oct 25, 2021 · Apt 5D
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane at upper and lower sash window in the kitchen located at apt 5d, 5th story, 2nd apartment from west at north
Oct 25, 2021 · Apt 5D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south and north wall in the kitchen located at apt 5d, 5th story, 2nd apartment from west at north
Oct 25, 2021 · Apt 5D
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane at upper and lower sash window in the 1st room from north at west located at apt 5d, 5th story, 2nd apartment from west at north
Oct 25, 2021 · Apt 5D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from north at east located at apt 5d, 5th story, 2nd apartment from west at north
Oct 25, 2021 · Apt 5D
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane at upper and lower sash window at 2nd, 3rd, 4th and 5th story, public hall stair
Oct 25, 2021
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective skylight over public hall stair , 5th story
Oct 25, 2021
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north
Sep 29, 2017 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the private hallway located at apt 4c, 4th story, 1st apartment from west at north
Sep 29, 2017 · Apt 4C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the private hallway located at apt 4c, 4th story, 1st apartment from west at north
Sep 29, 2017 · Apt 4C
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 5th story balcony at building front
Sep 26, 2017
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd story balcony at building front
Sep 26, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 30, 2017
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at time of inspection at public hall, 1st story
Aug 30, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 30, 2017
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor wrong frame at time of inspection. at public hall, 1st story
Aug 30, 2017
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisiting of flowerpots at 2nd and 5th story balcony south stack building front. at fire escape
Aug 30, 2017
Closed — Violation dismissed - BHazardous
Replace with new the missing door knob at public hall, 1st story
Aug 30, 2017
Closed — Violation dismissed - ANon-hazardous
Refit entrance door to building , 1st story
Jul 29, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective marble floor at intermediate landing at public hall stairs, 2nd story
Jul 29, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective marble floor at intermediate landing at public hall stairs, 3rd story
Jul 29, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective marble floor at intermediate landing at public hall stairs, 4th story
Jul 29, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at west wall at bulkhead , 5th story
Jul 29, 2015
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall at bulkhead , 5th story
Jul 29, 2015
Closed — Violation dismissed - BHazardous
Replace with new the missing screen under skylight , 5th story
Jul 29, 2015
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective interior glass at the lower sash double pane window in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north
Jul 31, 2013 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 3d, 3rd story, 2nd apartment from west at north
Jul 31, 2013 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3d, 3rd story, 2nd apartment from west at north
Jul 31, 2013 · Apt 3D
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the east wall in the kitchen located at apt 3d, 3rd story, 2nd apartment from west at north
Jul 31, 2013 · Apt 3D
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Hazardous
Failure to maintain plumbing &/or appurtenances-hazardous.location:basement of bldg 621 w135 street in existing gas system steam fittings installed which creates hazardous.remedy:maintain plumbing &/or
Jul 11, 2007 · Penalty $800
Resolve - Non-hazardous
Work w/o a permit.work noted:having installed new drop ceiling w/2" x 3" metal studs w/sheet in basement apt.remedy:stop all work & obtain permit.
Dec 5, 2006
Resolve - Non-hazardous
Work without a permit. work noted: plaster ceiling removed entirely from front bedroom of apartment 5a 5th floor leaving roof exposed with no fire rated material protection. remedy: obtain permits and approval
Jan 31, 1996
Resolve
Complaints
- Plumbing
Water supply
May 22, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 20, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 20, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 13, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Apr 6, 2026 · Apt 1B
Close - Plumbing
Bathtub/shower
Apr 6, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Apr 6, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Apr 6, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Apr 6, 2026 · Apt 1B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Jun 6, 2025 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Jun 5, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 25, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Oct 29, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 10, 2019 · Apt BLDG
Close - Paint/plaster
Wall
Jul 11, 2019 · Apt 3C
Close - Plumbing
Basin/sink
Jul 11, 2019 · Apt 3C
Close - Paint/plaster
Wall
Jul 11, 2019 · Apt 3C
Close - Flooring/stairs
Floor
Jul 11, 2019 · Apt 3C
Close - Plumbing
Bathtub/shower
Jul 11, 2019 · Apt 3C
Close - Flooring/stairs
Floor
Jul 11, 2019 · Apt 3C
Close - Paint/plaster
Ceiling
Sep 20, 2017 · Apt 4C
Close - Water leak
Slow leak
Sep 20, 2017 · Apt 4C
Close - Unsanitary condition
Pests
Sep 20, 2017 · Apt 4C
Close - Unsanitary condition
Pests
Sep 20, 2017 · Apt 4C
Close - Paint/plaster
Wall
Sep 20, 2017 · Apt 4C
Close - Paint/plaster
Ceiling
Sep 20, 2017 · Apt 4C
Close - Paint/plaster
Ceiling
Sep 20, 2017 · Apt 4C
Close - Unsanitary condition
Pests
Sep 20, 2017 · Apt 4C
Close - Water leak
Heavy flow
Aug 23, 2017 · Apt 1B
Close - Paint/plaster
Ceiling
Aug 23, 2017 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 19, 2015 · Apt 4D
Close - Flooring/stairs
Stairs
Jul 24, 2015 · Apt 5A
Close - Door/window
Door
Jul 24, 2015 · Apt 5A
Close - Unsanitary condition
Pests
Jul 1, 2014 · Apt 1D
Close - Paint/plaster
Ceiling
Jul 29, 2013 · Apt 3D
Close - Paint/plaster
Ceiling
Jul 29, 2013 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1905
- Floors
- 5
- Residential units
- 20
- Building area
- 18,905 ft²
- Lot area
- 5,254 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 2002 / 17
- Assessed value
- $688,950
- Landmark / historic district
- No
HPD registration #109467, last renewed Jun 29, 2026.
Questions about 621 West 135 Street
Who owns 621 West 135 Street?
The owner of record in NYC Department of City Planning PLUTO data is Deena Realty Corp.
Does 621 West 135 Street have violations?
Yes. NYC HPD has recorded 62 housing violations at this property.
Is 621 West 135 Street rent stabilized?
NYC Department of Finance tax bills listed 21 rent-stabilized units here in 2024 (about 100% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 621 West 135 Street built?
City records list 1905 as the year it was built.
How many apartments are in 621 West 135 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.