190 Claremont Avenue
Manhattan, NY 10027BBL 1-01993-0104Map
Owner of record: Claremont Apts, LLC
190 Claremont Avenue is a walk-up apartment building built in 1905 in Manhattan, 10027. It has 16 residential units across 5 floors. The owner of record is Claremont Apts, LLC. HPD has recorded 71 housing violations here, most recently on July 11, 2026. 22 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 71
- DOB violations
- 5
- ECB violations
- 8
- HPD complaints
- 126
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 71
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Jul 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 7, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st bathroom from east at south located at apt 1c, 1st story, 1st apartment from north at east
May 7, 2023 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from east at south located at apt 1c, 1st story, 1st apartment from north at east
May 7, 2023 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 2nd apartment from east at south
Mar 29, 2023 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Mar 29, 2023
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Mar 3, 2023
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 2nd apartment from east at south
Mar 3, 2023 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 2nd apartment from east at south
Mar 3, 2023 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 2nd apartment from east at south
Mar 3, 2023 · Apt 1A
Closed — Violation dismissed
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story
Sep 7, 2021
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 5c, 5th story, 1st apartment from north at east
Sep 7, 2021 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from north at east
Sep 7, 2021 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from north at east
Sep 7, 2021 · Apt 5C
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of water penetrating east and south walls at public hall, 5th story
Sep 7, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardent matirial at ceiling,east and south walls at public hall, 5th story
Sep 7, 2021
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color over ceiling in the foyer located at apt 5c, 5th story, 1st apartment from north at east
Sep 7, 2021 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from north at east
Sep 7, 2021 · Apt 5C
Open — Invalid certification - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 3, 2019 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 6th room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 3, 2019 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Aug 3, 2019 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 3, 2019 · Apt 2B
Open — Nov certified late - ANon-hazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the 6th room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 3, 2019 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 3, 2019 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jun 26, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 26, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal cornice at roof building front
Jun 26, 2018
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 26, 2018
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 26, 2018
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Jun 21, 2018 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Jun 21, 2018
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at public hall, 1st story
Dec 12, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 13, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Oct 13, 2017
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisiting of an air conditioner 5th story balcony west stack building front. at fire escape
Aug 31, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box paper sign present at time of inspection at public hall, 1st story
Aug 31, 2017
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 31, 2017
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor wrong frame at time of inspection at public hall, 1st story
Aug 31, 2017
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 24, 2017
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak ceiling in the private hallway located at apt 5a, 5th story, 1st apartment from north at east
Dec 1, 2016 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak ceiling in the 1st room from east located at apt 5a, 5th story
Dec 1, 2016 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Dec 1, 2016 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement brick pointing, rear exterior parapet wall at south
Dec 1, 2016
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Dec 1, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 5a, 5th story
Dec 1, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 5a, 5th story, 1st apartment from north at east
Dec 1, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 5a, 5th story
Dec 1, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Dec 1, 2016 · Apt 5A
Open — Nov sent out
DOB building violations · 5
- Construction other optional
Failure to comply with commissioner's order. at the time of inspection we observed the retaining wall located at the rear yard was crack and out of plumb. on 2/11/16 violation was issued for failure to maintain the structure. remedy: immediately retain a lic. design professional and provide engineering assesment to r/w unit by 12/12/2016
Nov 29, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2016
Dob violation - dismissed - Construction other optional
Fm structure in a code compliant manner. at rear yard, propery line retaining wall is cracked and out of plumb. remedy: require lic design professional to evlauate retaining wall and submit report to feu by 6/6/16. construct new retaining wall to be designed by lic design prof work to start no later than 10/25/16
Feb 11, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 8
- Class - 2
Found weil mclain model lgb-6, with exposed wires, openings on ceiling and walls, base of chimney needs to be sealed.
May 9, 2024 · Penalty $625
Active - Class - 2
Occupancy contrary to that allowed by dob records. illegal occupancy noted at cellar level occupied as bedroom in apt#1a. remedy: discontinue illegal occupancy.
Sep 7, 2021
Resolve - Class - 1
Failure to provide the required # of means of egress for every floor per bc1018.1(2008);bc1021.1(2014)& 27-366 for bedroom at cellar level of apt#1a. remedy: discontinue illegal occupancy.
Sep 7, 2021 · Penalty $2,500
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment apparatus materials devices appliances or wiring in use. fifthy floor hallway: open defective wiring are in use, defective light and in use (fluorescent) box is
Nov 28, 2016 · Penalty $4,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted : 5th fl landing having gas stove present w/ oil heater, obstructing ( partially) egress for 4 apartment. pic. taken remedy: remove obstruction
May 2, 2016 · Penalty $400
Resolve - Class - 2
Work w.o permit. noted: the following conditions: apt 3b workers have removed partition in living room & have removed all bedroom closets thru out apt. there are visible signs of walls being prepared for new el
Dec 30, 2009 · Penalty $800
Resolve - Class - 1
Fail to maintain bldg in code compliant manner. noted: the following conditions columns located at the bldg front steps are missing mortar at joints near the columns capitals owned is to provide engineers repo
Dec 30, 2009 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain defect is rear yard concrete pavement is broken collapsed at center and in rear of repairs remedy make all necessary rears to the satification of this department.
May 5, 1995 · Penalty $350
Resolve
Complaints
- Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 2, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 30, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 30, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 26, 2023 · Apt 5C
Close - Appliance
Electric/gas range
Nov 26, 2023 · Apt 5C
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2023 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 14, 2023 · Apt 5C
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt 1B
Close - Heat/hot water
Apartment only
Nov 13, 2023 · Apt 2C
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 13, 2023 · Apt 5C
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt 1B
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 12, 2023 · Apt 5B
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt BLDG
Close - Water leak
Slow leak
May 1, 2023 · Apt 1C
Close - Heat/hot water
Entire building
May 1, 2023 · Apt 1C
Close - Heat/hot water
Entire building
Apr 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 28, 2023 · Apt 1A
Close - Heat/hot water
Apartment only
Mar 1, 2023 · Apt 1A
Close - Water leak
Heavy flow
Nov 18, 2022 · Apt 1A
Close - Plumbing
Steam pipe/riser
Oct 30, 2022 · Apt 2C
Close - Paint/plaster
Ceiling
Oct 30, 2022 · Apt 2C
Close - Unsanitary condition
Pests
Oct 30, 2022 · Apt 2C
Close - Unsanitary condition
Pests
Apr 15, 2022 · Apt 1C
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 4B
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt BLDG
Close - Safety
Fire escape
Sep 3, 2021 · Apt 5C
Close - Paint/plaster
Ceiling
Sep 3, 2021 · Apt 5C
Close - Unsanitary condition
Pests
Sep 3, 2021 · Apt 5C
Close - Safety
Smoke detector
Dec 20, 2019 · Apt 2C
Close - Paint/plaster
Wall
Oct 25, 2019 · Apt 1C
Close - Unsanitary condition
Pests
Oct 25, 2019 · Apt 1C
Close - Unsanitary condition
Pests
Oct 25, 2019 · Apt 4A
Close - Unsanitary condition
Pests
Oct 22, 2019 · Apt 4A
Close - Unsanitary condition
Pests
Oct 22, 2019 · Apt 1CANDE
Close - Heat/hot water
Entire building
Oct 5, 2019 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 29, 2019 · Apt 4A
Close - Water leak
Heavy flow
Jul 12, 2019 · Apt 2B
Close - Heat/hot water
Entire building
Mar 21, 2019 · Apt 2A
Close - Heat/hot water
Entire building
Mar 18, 2019 · Apt 2B
Close - Unsanitary condition
Pests
Mar 4, 2019 · Apt 4A
Close - Unsanitary condition
Pests
Mar 4, 2019 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1905
- Floors
- 5
- Residential units
- 16
- Building area
- 13,680 ft²
- Lot area
- 4,000 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 1993 / 104
- Assessed value
- $1,147,500
- Landmark / historic district
- No
HPD registration #120309, last renewed Sep 16, 2025.
Questions about 190 Claremont Avenue
Who owns 190 Claremont Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Claremont Apts, LLC.
Does 190 Claremont Avenue have violations?
Yes. NYC HPD has recorded 71 housing violations at this property.
Is 190 Claremont Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 38% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 190 Claremont Avenue built?
City records list 1905 as the year it was built.
How many apartments are in 190 Claremont Avenue?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.