3143 Broadway
Manhattan, NY 10027BBL 1-01993-0076Map
Owner of record: New 3143-3147 Broadway LLC
3143 Broadway is a walk-up apartment building built in 1905 in Manhattan, 10027. It has 22 residential units across 6 floors. The owner of record is New 3143-3147 Broadway LLC. HPD has recorded 41 housing violations here, most recently on August 23, 2026. 11 of the 41 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 41
- DOB violations
- 16
- ECB violations
- 12
- HPD complaints
- 88
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4c, 3rd story, 1st apartment from north at east
Aug 23, 2026 · Apt 4C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the foyer located at apt 4c, 3rd story, 1st apartment from north at east
Aug 23, 2026 · Apt 4C
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4c, 3rd story, 1st apartment from north at east
Aug 23, 2026 · Apt 4C
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4c, 3rd story, 1st apartment from north at east
Aug 23, 2026 · Apt 4C
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4b, 2nd story, 1st apartment from north at east
Jan 19, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 2nd story, 1st apartment from north at east
Jan 19, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room
Jan 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2c, 3rd story, 1st apartment from west at north
Jan 19, 2026 · Apt 2C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Jan 26, 2020 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 4th story
Jan 10, 2018 · Apt 4B
Open — Nov sent out
Show 31 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked boiler room at basement
Jan 10, 2018
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of no cutout in awning for drop ladder preventing egress at bldg front facing east. at fire escape
Jul 14, 2017
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Jun 3, 2017
Open — False certification - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required (light fixture(s) present). at front areaway
Dec 29, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at the range in the entire apartment located at apt 3f, 6th story, 2nd apartment from north at east
Sep 15, 2016 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at the range in the entire apartment located at apt 4f, 6th story, 1st apartment from north at east
Sep 15, 2016 · Apt 4F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 3f, 6th story, 2nd apartment from north at east
Sep 15, 2016 · Apt 3F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the private hallway located at apt 3f, 6th story, 2nd apartment from north at east
Sep 15, 2016 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures (range) in the kitchen located at apt 4d, 4th story, 1st apartment from north at east
Sep 1, 2016 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures (range) in the kitchen located at apt 2f, 6th story, 1st apartment from south at west
Sep 1, 2016 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures no gas at range in the kitchen located at apt 4b, 2nd story, 1st apartment from north at east
Aug 26, 2016 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall and ceiling in the 5th room from east located at apt 3f, 3rd story, 2nd apartment from north at east
May 12, 2016 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from east located at apt 3f, 3rd story, 1st apartment from west at north
Mar 12, 2016 · Apt 3F
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at 3rd and 4th story balconys at rear at fire escape
Feb 3, 2016
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of wire ruuning across the outside of the window at 1st story balcony at north yard at fire escape
Feb 3, 2016
Closed — Violation dismissed - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway at rear south
Feb 3, 2016
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4f, 6th story, 1st apartment from north at east
Feb 3, 2016 · Apt 4F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 2nd apartment from north at east
Feb 3, 2016 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 2nd apartment from north at east
Feb 3, 2016 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire ceiling at vestibule at public hall, 1st story
Dec 11, 2015
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination ceiling at vestibule at public hall, 1st story
Dec 11, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at vestibule at public hall, 1st story
Dec 11, 2015
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and east wall at public hall, 1st story
Oct 1, 2015
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction material at public hall, 1st story
Oct 1, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 1st story
Oct 1, 2015
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Oct 1, 2015
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of a key operated lock at entrance room door leading to fire escape window in the 1st room from north located at apt 3c, 3rd story, 2nd apartment from west at north
Oct 1, 2015 · Apt 3C
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum temperture of 130 degrees at hot water fixture in the kitchen located at apt 3c, 3rd story, 2nd apartment from west at north
Oct 1, 2015 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Provide metal support pan below the 3rd marble tread from bottom at public hall stairs, 1st story
Mar 11, 2015
Closed — Violation closed - CImmediately hazardous
Replace with new the missing 3rd marble tread from bottom at public hall stairs, 1st story
Mar 11, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 11, 2015
Closed — Violation closed
DOB building violations · 16
- Construction other optional
Failure to comply with commissioner's order. at the time of inspection we obersved the retaining wall located at the rear yard was crack and out of plumb.on 2/11/16 violation was issued for failure to maintain the structure. remedy: immediately retain a lic. design professional provide engineering assesment to r/w unit by 12/12/2016
Nov 28, 2016
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 1, 2016
Dob violation - dismissed - Construction other optional
Fm structure in a code compliant manner at rear yard property line retaining wall is cracked and out of plumb. remedy: require lic design professional to evalate retaining wall and submit report submit report to feu by 6/6/16. construct new retaining wall to be designed by lic design professional work to start no later than 10/25/2016
Feb 11, 2016
Dob violation - dismissed - Construction other optional
Fm structure in a code compliant manner. at rear yard, property line retaining wall is cracked and out of plumb. remedy: require licensed design professional to evaluate retaining wall and submit report to feu by 6/6/16. construct new retaining wall to be designed by lic design professional. work to start no later than 10/25/16
Feb 11, 2016
Dob violation - active - Construction other optional
Comply with code
Feb 3, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Dec 21, 1990
Dob violation - active - Electric signs none
Es-electric signs none
May 4, 1989
Dob violation - active - Electric signs none
Es-electric signs none
May 4, 1989
Dob violation - active
ECB violations · 12
- Class - 1
Unlawfully continued work while on notice of a stop work order.note:obs at time of insp.(2)male workers conducting elecrical work @apt "2f" @fl 6 contrary to full s.w.o. issued @entire premises on 3/8/2016.bsmt
Mar 10, 2016 · Penalty $4,800
Resolve - Class - 1
Failure to carry out demolition operations as required by section.noted: at exp#1 piling of demolition debris,including wood lathe, w/nails,bags of plaster,variety of broken timber.debris is piled 6'high and
Mar 8, 2016
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances.noted: at roof, defective restaurant street vent exhaust at bulkhead.at roof railing exhaust brackets at bulkhed. at exp#3 fire escape in need of maintenan
Feb 3, 2016 · Penalty $1,000
Active - Class - 1
Gas meter installed in an improper location. observation has been madeduring a safety sweep in apt 3c the gas meter is located in the bath room as per rs 16115.6 and fgc appendix e gas meter is in the wrong
Feb 3, 2016 · Penalty $1,600
Active - Class - 2
Electrical work w/o a permit. on 2/3/16 at 9:30am i observed,in apt 2fnew 6/3 riser new branch circuit wiring,electrical panel,fiture,switches & receptacles installed. an application for cert of electrical insp
Feb 3, 2016 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg in code compliant manner:service equipment boiler. observation has been made during safety sweep that boiler in the cellar is missing a secondary low waer cut off.photos taken.rmdy:m
Feb 3, 2016 · Penalty $250
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment apparatus materials devices appliances or wiring in use. on 2/3/16 at 10am i observed defective emergency lights in use,no 2hrs back up power provided for hallw
Feb 3, 2016 · Penalty $400
Resolve - Class - 2
Failure to maintain building in code-compliant manner:no fire stoppingper bc 712.3, 27-345.noted: at storage room 1st floor exposed and unprotected ceiling-no fire stopping where required. rmdy: provide/maintai
Feb 3, 2016 · Penalty $500
Resolve - Non-hazardous
Exit passageway or corridor required width decreased by obstruction. bldg material stored in passageway s/s. remedy: remove obstruction.
Jun 30, 2008
Resolve - Non-hazardous
Work w/o a permit. work noted: wood deck w/seating out of treated woodinstalled at rear courtyard (entire) - approx 12' x 50'. remedy: stop all work & obtain permits
May 28, 2008 · Penalty $250
Resolve
Show 2 more ↓
- Non-hazardous
Work w/o permit. work noted: installed partitions w/metal studs, sheetrock w/elec plumbing work in north/south passageway. remedy: stop all work & obtain permits.
May 28, 2008 · Penalty $250
Resolve - Non-hazardous
Work without a permit. work noted. renovation in progress by removing gypsum plaster from walls, ceiling completely removed kitchen and bathroom walls and fixture, concrete floor in bathroom and wood sub floor
Aug 11, 2004 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Mold
Aug 1, 2026 · Apt 4C
Close - Heat/hot water
Entire building
May 2, 2026 · Apt 3F
Close - Heat/hot water
Entire building
May 2, 2026 · Apt 4B
Close - Water leak
Slow leak
Mar 7, 2026 · Apt 1A
Close - Plumbing
Steam pipe/riser
Feb 12, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Aug 20, 2025 · Apt BLDG
Close - Plumbing
Water supply
Sep 14, 2024 · Apt 4C
Close - Appliance
Refrigerator
Sep 9, 2023 · Apt 4C
Close
Show 40 more ↓
- Plumbing
Water supply
Mar 26, 2023 · Apt 4C
Close - Plumbing
Toilet
Jan 1, 2022 · Apt 3F6THF
Close - Plumbing
Toilet
Dec 10, 2021 · Apt 3F
Close - Door/window
Window frame
Mar 5, 2021 · Apt 4B
Close - Heat/hot water
Apartment only
Mar 5, 2021 · Apt 4B
Close - Heat/hot water
Entire building
Oct 31, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Feb 21, 2020 · Apt 4F
Close - Heat/hot water
Apartment only
Jan 22, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Jan 18, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Nov 15, 2019 · Apt 1B
Close - Heat/hot water
Entire building
Jan 10, 2018 · Apt BLDG
Close - Door/window
Door
Jan 9, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2018 · Apt 4B
Close - Electric
Lighting
Jul 5, 2017 · Apt 3F
Close - Electric
Lighting
Jul 5, 2017 · Apt 3F
Close - Plumbing
Water supply
Feb 14, 2017 · Apt 3W
Close - Heat/hot water
Apartment only
Dec 15, 2016 · Apt 4B
Close - General
Cabinet
Nov 7, 2016 · Apt 5N
Close - Door/window
Door
Nov 7, 2016 · Apt 5N
Close - Plumbing
Basin/sink
Nov 7, 2016 · Apt 5N
Close - Paint/plaster
Wall
Nov 7, 2016 · Apt 5N
Close - Plumbing
Basin/sink
Nov 7, 2016 · Apt 5N
Close - Appliance
Refrigerator
Nov 7, 2016 · Apt 5N
Close - Paint/plaster
Ceiling
Nov 7, 2016 · Apt 5N
Close - Paint/plaster
Wall
Nov 7, 2016 · Apt 5N
Close - Plumbing
Radiator
Nov 7, 2016 · Apt 5N
Close - General
Cabinet
Nov 7, 2016 · Apt 5N
Close - Plumbing
Bathtub/shower
Nov 7, 2016 · Apt 5N
Close - General
Cooking gas
Sep 19, 2016 · Apt 1C
Close - Paint/plaster
Wall
Sep 2, 2016 · Apt 3F
Close - General
Cooking gas
Sep 2, 2016 · Apt 3F
Close - Paint/plaster
Ceiling
Sep 2, 2016 · Apt 3F
Close - Door/window
Door
Aug 27, 2016 · Apt 4D
Close - Door/window
Door
Aug 27, 2016 · Apt BLDG
Close - General
Cooking gas
Aug 27, 2016 · Apt 2F
Close - General
Cooking gas
Aug 22, 2016 · Apt 4B
Close - General
Cooking gas
Aug 22, 2016 · Apt 3F
Close - Water leak
Slow leak
Jan 13, 2016 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1905
- Floors
- 6
- Residential units
- 22
- Building area
- 18,288 ft²
- Lot area
- 4,500 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 1993 / 76
- Assessed value
- $2,448,000
- Landmark / historic district
- No
HPD registration #124196, last renewed Sep 18, 2025.
Questions about 3143 Broadway
Who owns 3143 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is New 3143-3147 Broadway LLC.
Does 3143 Broadway have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 3143 Broadway rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 9% of its 22 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3143 Broadway built?
City records list 1905 as the year it was built.
How many apartments are in 3143 Broadway?
It has 22 residential units and 24 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.