roofy

3340 Broadway

Manhattan, NY 10031BBL 1-01988-0074Map

Owner of record: 817 West End Co.

3340 Broadway is an elevator apartment building built in 1909 in Manhattan, 10031. It has 36 residential units across 6 floors. The owner of record is 817 West End Co.. HPD has recorded 447 housing violations here, most recently on September 27, 2026. 25 of the 50 most recent violations are still open. City tax records listed 24 rent-stabilized apartments here in 2024.

HPD violations
447
DOB violations
43
ECB violations
32
HPD complaints
430

What to know

Concern
17 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 27, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
24
About 67% of the building's 36 apartments
Up from 23 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 447

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from west at north wall, 1st window frame from east at south wall in the 3rd room from east at south located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from east at south located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 2nd window frame from west at north wall in the 2nd room from east at north located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the 2nd room from east at north located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the bathroom located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the bathroom located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the kitchen located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, west wall, ceiling in the bathroom located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st closet from north at east wall door in the 3rd room from east at south located at apt 5f, 5th story, 1st apartment from north at east

    Sep 27, 2026 · Apt 5F

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5f, 5th story, 1st apartment from north at east

    Aug 27, 2026 · Apt 5F

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at west wall in the kitchen located at apt 5f, 5th story, 1st apartment from north at east

    Aug 27, 2026 · Apt 5F

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5f, 5th story, 1st apartment from north at east

    Aug 27, 2026 · Apt 5F

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 4th apartment from south at west

    Aug 27, 2026 · Apt 5D

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective upper and lower sash glass pane in the bathroom located at apt 4c, 4th story, 4th apartment from south at west

    Aug 20, 2026 · Apt 4C

    Open — Civ14 mailed
  • B

    M/d law abate the nuisance consisting of bed obstructing fire escape window in the 6th room from east at south located at apt 4d, 4th story, 4th apartment from south at west

    Nov 26, 2025 · Apt 4D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 4d, 4th story, 4th apartment from south at west

    Nov 26, 2025 · Apt 4D

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 4d, 4th story, 4th apartment from south at west

    Nov 26, 2025 · Apt 4D

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4d, 4th story, 4th apartment from south at west

    Nov 26, 2025 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4d, 4th story, 4th apartment from south at west

    Nov 26, 2025 · Apt 4D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective glass pane at upper window sash in the bathroom located at apt 4d, 4th story, 4th apartment from south at west

    Nov 26, 2025 · Apt 4D

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at in the bathroom located at apt 4d, 4th story, 4th apartment from south at west

    Nov 26, 2025 · Apt 4D

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4e, 4th story, 2nd apartment from north at east

    Aug 4, 2025 · Apt 4E

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 4th room from east located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 6th room from east located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the bathroom located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Open — Defect letter issued
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Open — Defect letter issued
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Open — Defect letter issued
  • B

    Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt 6d, 6th story, 4th apartment from south at west

    May 17, 2025 · Apt 6D

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective spring balance at lower fire escape window sash in the 7th room from east at south located at apt 5d, 5th story, 4th apartment from south at west

    Mar 18, 2025 · Apt 5D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 6th room from east, the 2nd bathroom from east, the foyer , the kitchen , the 7th room from east at north located at apt 5d, 5th story, 4th apartment from south at west

    Mar 18, 2025 · Apt 5D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd room from east located at apt 5d, 5th story, 4th apartment from south at west

    Mar 18, 2025 · Apt 5D

    Open — Defect letter issued
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5d, 5th story, 4th apartment from south at west

    Mar 18, 2025 · Apt 5D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlet at north wall in the 6th room from east located at apt 5d, 5th story, 4th apartment from south at west

    Mar 18, 2025 · Apt 5D

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the 3rd room from east located at apt 5d, 5th story, 4th apartment from south at west

    Mar 18, 2025 · Apt 5D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall in the 3rd room from east located at apt 5d, 5th story, 4th apartment from south at west

    Mar 18, 2025 · Apt 5D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the bathroom located at apt 5d, 5th story, 4th apartment from south at west

    Mar 18, 2025 · Apt 5D

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance at public hall, 1st story

    Jan 25, 2025

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at basement at boiler room

    Jan 25, 2025

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3c, 3rd story, 3rd apartment from south at west

    Jan 25, 2025 · Apt 3C

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3c, 3rd story, 3rd apartment from south at west

    Jan 25, 2025 · Apt 3C

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective ceramic-tiles floor at public hall, 1st story

    Jan 19, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latchset at building entrance door

    Jan 19, 2025

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from south at west

    Nov 6, 2024 · Apt 3B

    Closed — Violation closed

DOB building violations · 43

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2024

    Dob violation - active
  • Construction other optional

    The main egress hallway stairs are compromised with two broken and one missing hallway stair treads at second and third floors and numerous corroded angle supports as noted in oath #39099131x.

    Nov 12, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Oct 10, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Oct 9, 2021

    Dob violation - dismissed
Show 33 more ↓
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Construction other optional

    At time of inspection damage observed to have been sustained to store front due to vehicle impact

    Apr 18, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 5, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 26, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 22, 2019

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2018

    Mar 18, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 31, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 17, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 25, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 22, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 11, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 9, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 14, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    1p9946

    May 9, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p9446

    May 25, 2000

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 8, 1991

    Vp*-violation unserved ecb- dismissed
  • Zoning none

    Z-zoning none

    Mar 26, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jan 22, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jan 22, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jan 22, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jan 22, 1991

    Dob violation - dismissed
  • Elevator elevatorrequired

    33-wall & skylight

    Jul 23, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (15)file application and obtain permit for 1st floor door

    Dec 13, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    File bn with this department for basement cut-out switch. properl light elevator cab

    Oct 11, 1988

    Dob violation - resolved

ECB violations · 32

  • Class - 2

    Failure to submit a certificate of correction of violation #39099131x issued on 11-12-2023 for failure to maintain building in code complaint-manner., file a certificate of correction

    May 21, 2026 · Penalty $6,250

    Active
  • Class - 1

    Cease use item: door zone restrictor inoperative, creating a hazardous condition per 1rcny11-02. remedy: restore to service immediatley and e-mail the elevator division at [email protected] for a re-inspect

    Dec 17, 2025

    Resolve
  • Class - 1

    Failure to maintain building code compliant. noted: there are two broken and one missing marble hallway stair treads at second and third floors with numerous corroded angle supports throughout., repair and/repl

    Nov 12, 2023 · Penalty $6,250

    Active
  • Class - 1

    Found elevator is not working. restore to service for proper inspection by dob.

    Mar 14, 2022

    Resolve
  • Class - 1

    Out side comm inoperative repair, 42/m/07 dlm inproperly installed on this device no fire mans service present in controller ,installed fire mans service so dlmis in compliance with section 3.10.12 of appendix

    Sep 16, 2021

    Resolve
  • Class - 1

    Door restrictor tempered and not working. cease use, repair, re-inspection required. dlm not working. repair and re-inspection required. brake tag missing. provide. cat1 tag missing. provide.

    Dec 11, 2020

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39010555x issued on 10-02-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work against a stop work order. remedy: comply w/comm's order &

    Feb 12, 2020

    Resolve
  • Class - 1

    Cease use 42-m-07, 05-a-10, 02-x-10 08-v-10, 23-i-10, 30-d-06, 39-m-07, 39-x-10, 40-o-02, 41-m-07, 52-bb-07, 59-bb-07, 68-m-07, 61-m-07,71-x-10, 98-bb-07, 99-b-07. 42-m-07 no door lock monitor installed on this

    Jan 15, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39010555x issued on 10-02-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Dec 26, 2019

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#39010555x issued on 10/2/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. no c/of/c on file. remedy:

    Nov 13, 2019

    Resolve
Show 22 more ↓
  • Class - 2

    Failure to provide 72 hr. notification. note: during time of inspection, observed construction work being performed on ground level commercial space with gc not providing 72 hour notification to the department

    Oct 24, 2019 · Penalty $6,250

    Active
  • Class - 2

    Failure topost or distribute tenant protection plan. note: during time of inspection, observed construction work being performed in commercial space attached to a 6 story residential occupied building with n

    Oct 24, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to post or distribute safe construction bill of rights. note: during time of inspection, observed construction work being performed in ground level commercial space attached to a 6 story residential oc

    Oct 24, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Work without plumbing permit. note: during time of inspection, observed plumbing work performed removing and installing new grease trap with no plumbing permit filed for this job location., obtain permit; comp

    Oct 24, 2019 · Penalty $2,500

    Active
  • Class - 1

    Work against a stop work order. noted: in apt # 5d continuance of work in bathroom. electrical work and ceiling joists were installed since swo under complaint # 1519757 was issued., comply with stop work order

    Oct 2, 2019

    Resolve
  • Class - 2

    Work without a permit. noted: electrical work in apt # 5d bathroom. new bx and light box installed in ceiling. , obtain all permits

    Oct 2, 2019 · Penalty $625

    Resolve
  • Class - 3

    Work without a permit. noted: in apt 5d removed ceiling in bathroom and a bathroom wall with non fire rated finishes and replaced wall studs with new wooden studs in order to renovate bathroom. 15% work complet

    Aug 23, 2019 · Penalty $500

    Resolve
  • Class - 3

    Failure to close unused openings(knockouts)in outlet/panel box. ground floor store front: slice boxes are not covered. remedy: close unused openings.

    Aug 15, 2018 · Penalty $150

    Active
  • Class - 2

    02i10,11b07,11b10,70b07-02i)2 way communications-damaged. 11b)comply with section 8.1 (basement lockout). 11b10)car buttons stick (repair). when pressed 6th floor, not responding. 70b)comply with section 8.1 (p

    Dec 19, 2017 · Penalty $2,500

    Active
  • Class - 2

    2x10,3y2,39y2,40o2,41m7,42d6,56y13,70o2,71x10,68bb7,16d6,8v1. (2x)2-way communications, inoperable. (41m)provide signage on door. (42d)secure relay on controller. (68bb)brake tag expired. (16d)2nd flr keeper fo

    Nov 14, 2017

    Resolve
  • Class - 2

    97x10.97x10 entire device inoperative repair and restore to service

    Mar 31, 2009 · Penalty $500

    Resolve
  • Non-hazardous

    8v1-15l11-35p17. 15-l-11 not self closing 1 floor.

    Jul 26, 2002 · Penalty $350

    Resolve
  • Hazardous

    Failure to maintain building; inthat interior stair at second floor, stair tread missing (marble). peices of broken marble and plinters found at second floor landing. remedy: repair marble tread at the locati

    Jul 16, 2001

    Resolve
  • Non-hazardous

    14m 35o 50f 28h 57o 28h adjust or repack shoes

    Jan 30, 1999

    Resolve
  • Hazardous

    55x,53x,35r,45m,. 35 wood over grase - cease use until slack cable switch is replace - call 312-8730 before returning to service.

    Feb 28, 1996

    Resolve
  • Non-hazardous

    1x,11q,17i,2x,31p,25q,74x,35i,53x,35r,61m. 17 glass. 31 top car. 74 work light. 35 wall. 35 tar pupea over gate. 61 key hole.

    Mar 15, 1995

    Resolve
  • Non-hazardous

    05i 17i 17r 21x 50 f 52i 47h 48t 73o 74# 05i saddle 17r for wire glass 52i brake drum 74 # perform all work to comply with ecbs violations 38031825n and 38026902l and 38023380j

    Feb 25, 1994 · Penalty $250

    Resolve
  • Non-hazardous

    1i,3m,8v,11i,11q,14m,17i,17q,17r,18q,21x,25q,28h,73o,50y,50f,46t,48t, 49t,35i,74r. 3 handrail 17 glass 35 wall 74 tar paper over grate.

    Mar 31, 1993 · Penalty $200

    Resolve
  • Non-hazardous

    01l,03l,08v,17l,18m,73o,25l,14m,18 covers(locks).

    Aug 13, 1992 · Penalty $1,000

    Resolve
  • Non-hazardous

    01l,01l,03l,08v11l,11q,14m,15l,17i,17q,17r,18#,21x,255m,28c,28l,30o, 31l,35l,38x, (03) jamb 7-bsmt. 18-5th floor cover 25-cover 35-broken and unprotected skylight plus remove duct replace loose plaster.

    Feb 18, 1992 · Penalty $1,000

    Resolve
  • Non-hazardous

    46l,47h,49l,50y,50y,51f,52h,53x,55x,57o,03m,15r,10#,73o,37l, 03-hand rail 15-file bn and obtain perlmit for bsmtl. cut off switer 37-properly wire tab to brake.

    Feb 18, 1992 · Penalty $1,000

    Resolve
  • Non-hazardous

    35o,50o,57o,46t,08v,15a

    Jul 8, 1991 · Penalty $1,000

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Sep 19, 2026 · Apt 5F

    Close
  • Paint/plaster

    Wall

    Sep 19, 2026 · Apt 5F

    Close
  • Elevator

    Maintenance

    Mar 13, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jan 17, 2026 · Apt 3C

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Dec 2, 2025 · Apt 5F

    Close
  • Unsanitary condition

    Pests

    Dec 2, 2025 · Apt 5F

    Close
  • Plumbing

    Basin/sink

    Dec 2, 2025 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Dec 1, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2025 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Nov 22, 2025 · Apt 4D

    Close
  • Unsanitary condition

    Mold

    Nov 22, 2025 · Apt 4D

    Close
  • Flooring/stairs

    Floor

    Nov 22, 2025 · Apt 4D

    Close
  • Appliance

    Refrigerator

    Nov 22, 2025 · Apt 4D

    Close
  • Paint/plaster

    Ceiling

    Nov 22, 2025 · Apt 4D

    Close
  • Plumbing

    Toilet

    Nov 22, 2025 · Apt 4D

    Close
  • Door/window

    Window frame

    Nov 22, 2025 · Apt 4D

    Close
  • Plumbing

    Basin/sink

    Nov 22, 2025 · Apt 4D

    Close
  • Safety

    Window guard broken/missing

    Jul 31, 2025 · Apt 4E

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2025 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2025 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2025 · Apt 5D

    Close
  • Safety

    Sprinkler

    Jul 11, 2025 · Apt HALLWA

    Close
  • Electric

    Outlet/switch

    Mar 17, 2025 · Apt 5D

    Close
  • Paint/plaster

    Ceiling

    Mar 17, 2025 · Apt 5D

    Close
  • Door/window

    Window frame

    Mar 17, 2025 · Apt 5D

    Close
  • Unsanitary condition

    Mold

    Mar 17, 2025 · Apt 5D

    Close
  • General

    Cabinet

    Mar 17, 2025 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Mar 17, 2025 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Mar 17, 2025 · Apt 5D

    Close
  • Electric

    Outlet/switch

    Mar 17, 2025 · Apt 5D

    Close
  • Unsanitary condition

    Mold

    Mar 17, 2025 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Mar 17, 2025 · Apt 5D

    Close
  • Flooring/stairs

    Floor

    Mar 17, 2025 · Apt 5D

    Close
  • General

    Cabinet

    Mar 17, 2025 · Apt 5D

    Close
  • Plumbing

    Basin/sink

    Mar 17, 2025 · Apt 5D

    Close
  • Flooring/stairs

    Floor

    Mar 17, 2025 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Mar 17, 2025 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Mar 17, 2025 · Apt 5D

    Close
  • Door/window

    Window frame

    Mar 17, 2025 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2025 · Apt 3C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
1909
Floors
6
Residential units
36
Building area
56,379 ft²
Lot area
11,990 ft²
Zoning
R8
Community board
109
Council district
7
Block / lot
1988 / 74
Assessed value
$2,643,750
Landmark / historic district
No

HPD registration #113806, last renewed Aug 28, 2025.

Questions about 3340 Broadway

Who owns 3340 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is 817 West End Co..

Does 3340 Broadway have violations?

Yes. NYC HPD has recorded 447 housing violations at this property.

Is 3340 Broadway rent stabilized?

NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 67% of its 36 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 3340 Broadway built?

City records list 1909 as the year it was built.

How many apartments are in 3340 Broadway?

It has 36 residential units and 42 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.