503 West 122 Street
Manhattan, NY 10027BBL 1-01977-0028Map
Owner of record: 122nd Street Investor, LLC
503 West 122 Street is a walk-up apartment building built in 1905 in Manhattan, 10027. It has 18 residential units across 6 floors. The owner of record is 122nd Street Investor, LLC. HPD has recorded 676 housing violations here, most recently on September 26, 2026. 23 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 676
- DOB violations
- 2
- ECB violations
- 10
- HPD complaints
- 851
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 676
- BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at east located at apt 4, 2nd story, 1st apartment from north at east
Sep 26, 2026 · Apt 4
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the bathroom located at apt 10, 5th story, 1st apartment from north at east
Sep 26, 2026 · Apt 10
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective entrance door in the 3rd room from north located at apt 4, 2nd story, 1st apartment from north at east
Sep 26, 2026 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from north located at apt 4, 2nd story, 1st apartment from north at east
Sep 26, 2026 · Apt 4
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections consisting of water closet, wash basin and shower stall installed at illegal duplex apartment 1 (1st story, west 1) at lower level at cellar
Sep 9, 2026
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration floor pierced stairs erected to cellar creating illegal duplex apartment located at apt 1, 1st story, 1st apartment from south at west
Sep 9, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at boiler room door at cellar
Sep 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire door leading to west yard at public hall, 1st story
Sep 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at east bulkhead door to roof
Sep 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at south bulkhead door to roof
Sep 2, 2026
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door at west wall leading to court yard at public hall, 1st story
Aug 27, 2026
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective latch and assembly at fire door at west wall leading to court yard at public hall, 1st story
Aug 27, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Aug 27, 2026 · Apt 1
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Aug 27, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Aug 27, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east at north located at apt 4, 2nd story, 1st apartment from north at east
Aug 27, 2026 · Apt 4
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around the shower stall in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Jul 29, 2026 · Apt 10
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Jul 29, 2026 · Apt 10
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door leading to west yard , 1st story
Jul 26, 2026
Open — Not complied with - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at observed burrows at building front , 1st story
Jul 26, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement landing at stoop, building front , 1st story
Jul 26, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 15, 5th story, 1st apartment from east at south
Jul 8, 2026 · Apt 15
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 15, 5th story, 1st apartment from east at south
Jul 8, 2026 · Apt 15
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 1, 1st story, 1st apartment from south at west
Jul 8, 2026 · Apt 1
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jul 8, 2026 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 8, 2026 · Apt 1
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 8, 2026 · Apt 1
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Jul 7, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 15, 4th story, 1st apartment from east at south
Jun 22, 2026 · Apt 15
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 15, 4th story, 1st apartment from east at south
Jun 22, 2026 · Apt 15
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 8, 2026
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system contact information missing at public hall, 1st story
Jun 8, 2026
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at to west yard at public hall, 1st story
Apr 26, 2026
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq fts at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Apr 26, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closure arm at south bulkhead door, roof
Apr 26, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 1, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 12, 4th story, 1st apartment from east at south
Mar 18, 2026 · Apt 12
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 12, 4th story, 1st apartment from east at south
Mar 18, 2026 · Apt 12
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 15, 5th story, 1st apartment from east at south
Mar 18, 2026 · Apt 15
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15, 5th story, 1st apartment from east at south
Mar 18, 2026 · Apt 15
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 8, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 8
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 8
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective the wood floor in the 4th room from north at east located at apt 1, 1st story, 1st apartment from west at north
Mar 11, 2026 · Apt 1
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Mar 11, 2026 · Apt 1
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Mar 11, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 15, 5th story, 1st apartment from east at south
Mar 11, 2026 · Apt 15
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15, 5th story, 1st apartment from east at south
Mar 4, 2026 · Apt 15
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 8, 3rd story, 2nd apartment from north at east
Mar 4, 2026 · Apt 8
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8, 3rd story, 2nd apartment from north at east
Mar 4, 2026 · Apt 8
Closed — Violation closed
DOB building violations · 2
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
ECB violations · 10
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. ecb viol.#39103894n issued 1/22/24 noted: step cracks on front facade exterior brick wall on
Apr 16, 2026 · Penalty $6,250
Active - Class - 2
Work without a permit. noted; at time of inspection building has been observed having installed illegal water and waste lines creating a 3-piece bathroom at the basement level used in conjunction with apt #1. b
Nov 24, 2025 · Penalty $1,250
Active - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. noted; at time of inspection building has been observed with apt #1 operating as a duplex unit with 3-piece ba
Nov 24, 2025 · Penalty $1,250
Active - Class - 1
Occupancy contrary to that allowed by c of o and department of buildings records. floor pierced and spiral stairs installed leading to cellar creating illegal duplex apartment in the 3rd room from north at east
Oct 28, 2025 · Penalty $2,500
Active - Class - 2
Occupancy contrary to that allowed by cofo and department of buildingsrecords.floor pierced and spiral stairs installed creating an illegal duplex apartment located in the 3rd private hallway at apt 1,1st story
Apr 2, 2025 · Penalty $1,250
Active - Class - 2
Occupancy contrary to that allowed by c of o and department of buildings records. illegal duplex apartment created with spiral stair piercedthrough floor to finished area to cellar in the 4th room from north at
Jul 24, 2024 · Penalty $6,250
Active - Class - 2
Occupancy contrary to that allowed by c of o and department of buildings records. pierced floor with interior spiral staircase installed to cellar to cellar creating illegal duplex located at apt. 1 story 1st a
Jan 31, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection observed step cracks on front facade exterior brick wall on 3rd & 4th floor level between the windows., maintain exterior building wall
Jan 22, 2024 · Penalty $1,250
Active - Class - 1
Failure to maintain building in a code compliant manner. observed lintel above 5th floor window at north east corner of building at exp 4 (apt 13th) is greatly disappeared, budging out in great danger of collap
Apr 25, 2023 · Penalty $1,250
Resolve - Non-hazardous
Work w/o a permit.work noted:replacing parapets walls throughout belowflashing remedy:stop all work & obtain permits
Dec 18, 2006
Resolve
Complaints
- Paint/plaster
Wall
Oct 6, 2026 · Apt 1
Open - Paint/plaster
Ceiling
Oct 6, 2026 · Apt 1
Open - Paint/plaster
Window/frame
Oct 6, 2026 · Apt 1
Open - Water leak
Heavy flow
Oct 6, 2026 · Apt 1
Close - Door/window
Door
Sep 18, 2026 · Apt 4
Close - Paint/plaster
Wall
Sep 18, 2026 · Apt 4
Close - Plumbing
Basin/sink
Sep 18, 2026 · Apt 4
Close - General
Bell/buzzer/intercom
Sep 18, 2026 · Apt 4
Close - Flooring/stairs
Floor
Sep 18, 2026 · Apt 4
Close - Plumbing
Basin/sink
Sep 16, 2026 · Apt 15
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 16, 2026 · Apt 15
Close - Unsanitary condition
Pests
Sep 16, 2026 · Apt 15
Close - Flooring/stairs
Floor
Sep 16, 2026 · Apt 15
Close - General
Cabinet
Sep 16, 2026 · Apt 15
Close - Appliance
Refrigerator
Sep 4, 2026 · Apt 10
Close - Paint/plaster
Wall
Aug 24, 2026 · Apt 1
Close - Unsanitary condition
Mold
Aug 24, 2026 · Apt 1
Close - Paint/plaster
Wall
Aug 24, 2026 · Apt 1
Close - Flooring/stairs
Floor
Aug 24, 2026 · Apt 1
Close - Unsanitary condition
Pests
Aug 24, 2026 · Apt 1
Close - Flooring/stairs
Floor
Aug 24, 2026 · Apt 1
Close - Flooring/stairs
Floor
Aug 13, 2026 · Apt 4
Close - General
Cabinet
Aug 13, 2026 · Apt 4
Close - Plumbing
Basin/sink
Aug 13, 2026 · Apt 4
Close - Unsanitary condition
Garbage/recycling storage
Aug 7, 2026 · Apt 12
Close - Door/window
Door
Aug 7, 2026 · Apt 12
Close - Door/window
Door
Jul 3, 2026 · Apt 2
Close - Flooring/stairs
Floor
Jul 2, 2026 · Apt 1
Close - General
Ventilation system
Jul 2, 2026 · Apt 1
Close - Unsanitary condition
Pests
Jul 2, 2026 · Apt 1
Close - Paint/plaster
Wall
Jul 2, 2026 · Apt 1
Close - Flooring/stairs
Floor
Jul 2, 2026 · Apt 1
Close - Unsanitary condition
Pests
Jul 2, 2026 · Apt 15
Close - Flooring/stairs
Floor
Jul 2, 2026 · Apt 15
Close - Door/window
Door
Jul 2, 2026 · Apt 1
Close - Door/window
Door
Jul 2, 2026 · Apt 2
Close - Door/window
Door
Jul 2, 2026 · Apt 1
Close - Door/window
Door
Jul 2, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jul 2, 2026 · Apt 1
Close - Unsanitary condition
Pests
Jul 2, 2026 · Apt 15
Close - Door/window
Door
Jul 2, 2026 · Apt 2
Close - Electric
Lighting
Jun 14, 2026 · Apt 10
Close - Unsanitary condition
Pests
Jun 8, 2026 · Apt 1
Close - Flooring/stairs
Floor
Jun 8, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jun 8, 2026 · Apt 1
Close - Unsanitary condition
Pests
Jun 8, 2026 · Apt 1
Close - Electric
Outlet/switch
Jun 8, 2026 · Apt 1
Close - Door/window
Door
Jun 8, 2026 · Apt 1
Close - Door/window
Door
Jun 8, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Jun 8, 2026 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1905
- Floors
- 6
- Residential units
- 18
- Building area
- 13,500 ft²
- Lot area
- 3,410 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 1977 / 28
- Assessed value
- $1,725,750
- Landmark / historic district
- No
HPD registration #120852, last renewed Oct 2, 2025.
Questions about 503 West 122 Street
Who owns 503 West 122 Street?
The owner of record in NYC Department of City Planning PLUTO data is 122nd Street Investor, LLC.
Does 503 West 122 Street have violations?
Yes. NYC HPD has recorded 676 housing violations at this property.
Is 503 West 122 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 33% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 503 West 122 Street built?
City records list 1905 as the year it was built.
How many apartments are in 503 West 122 Street?
It has 18 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.