1 St Nicholas Terrace
Manhattan, NY 10027BBL 1-01954-0007Map
Owner of record: Terrace Apartments Buildings Company, In C.
1 St Nicholas Terrace is a walk-up apartment building built in 1901 in Manhattan, 10027. It has 28 residential units across 5 floors. The owner of record is Terrace Apartments Buildings Company, In C.. HPD has recorded 111 housing violations here, most recently on May 24, 2026. 6 of the 50 most recent violations are still open. City tax records listed 26 rent-stabilized apartments here in 2024.
- HPD violations
- 111
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 291
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 111
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 24, 2026
Open — Not complied with - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 42, 4th story, 1st apartment from south at west
Oct 20, 2025 · Apt 42
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from north at west located at apt 42, 4th story, 1st apartment from south at west
Oct 20, 2025 · Apt 42
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Oct 20, 2025
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 42, 4th story, 1st apartment from south at west
Oct 20, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 25, 2nd story, 1st apartment from north at east
Oct 1, 2025 · Apt 25
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at the south wall in the kitchen located at apt 25, 2nd story, 1st apartment from north at east
Oct 1, 2025 · Apt 25
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 25, 2nd story, 1st apartment from north at east
Oct 1, 2025 · Apt 25
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 55, 5th story, 1st apartment from north at east
Jan 18, 2024 · Apt 55
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jan 18, 2024
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 55, 5th story, 1st apartment from north at east
Jan 18, 2024 · Apt 55
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt apt1, 1st story, 2nd apartment from north at east
Apr 1, 2021 · Apt APT1
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt apt1, 1st story, 2nd apartment from north at east
Apr 1, 2021 · Apt APT1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 3rd room from east located at apt apt1, 1st story, 2nd apartment from north at east
Apr 1, 2021 · Apt APT1
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Dec 10, 2019 · Apt 3
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Dec 10, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 3, 3rd story, 1st apartment from west at north
Dec 10, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 1st story, 2nd apartment from west at north
Sep 26, 2019 · Apt 3
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 1st story, 2nd apartment from west at north
Sep 26, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3, 1st story, 2nd apartment from west at north
Sep 26, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3, 3rd story, 2nd apartment from west at north
Sep 26, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 1st story, 2nd apartment from south at west
Jun 29, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 1st story, 2nd apartment from south at west
Jun 29, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor (sloping) in the kitchen located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate to riser at south wall in the 3rd room from north at east located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from north at east located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate to riser in the bathroom located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile walls throughout in the bathroom located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tile floor throughout in the private hallway located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Replace the broken or defective wash basin in the bathroom located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 1st story, 2nd apartment from south at west
Apr 17, 2019 · Apt 3
Closed — Violation closed - BHazardous
Provide escutcheon plate at riser. in the 2nd room from north at west located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the broken or defective marble saddle at entrance. in the bathroom located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Provide escutcheon plate at riser. in the bathroom located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective. located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective. located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling. in the 3rd room from north at west located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles. in the kitchen located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles. in the bathroom located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling through-out in the entire apartment located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west located at apt 3, 1st story, 2nd apartment from south at west
Jun 12, 2018 · Apt 3
Closed — Violation closed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Oct 8, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 10, 2026 · Apt 3
Close - Appliance
Electric/gas range
Feb 10, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Jan 17, 2026 · Apt 32
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Oct 5, 2025 · Apt 42
Close - Water leak
Damp spot
Sep 29, 2025 · Apt 25
Close - Unsanitary condition
Mold
Sep 29, 2025 · Apt 25
Close - Water leak
Heavy flow
Sep 25, 2025 · Apt 25
Close - Plumbing
Basin/sink
Sep 25, 2025 · Apt 25
Close - Unsanitary condition
Mold
Sep 25, 2025 · Apt 25
Close - Heat/hot water
Entire building
Mar 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 18, 2024 · Apt 45
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 55
Close - Heat/hot water
Entire building
Jan 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1901
- Floors
- 5
- Residential units
- 28
- Building area
- 24,780 ft²
- Lot area
- 5,936 ft²
- Zoning
- R7A
- Community board
- 109
- Council district
- 9
- Block / lot
- 1954 / 7
- Assessed value
- $578,250
- Landmark / historic district
- No
HPD registration #104942, last renewed Sep 4, 2025.
Questions about 1 St Nicholas Terrace
Who owns 1 St Nicholas Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Terrace Apartments Buildings Company, In C..
Does 1 St Nicholas Terrace have violations?
Yes. NYC HPD has recorded 111 housing violations at this property.
Is 1 St Nicholas Terrace rent stabilized?
NYC Department of Finance tax bills listed 26 rent-stabilized units here in 2024 (about 93% of its 28 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1 St Nicholas Terrace built?
City records list 1901 as the year it was built.
How many apartments are in 1 St Nicholas Terrace?
It has 28 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.