2500 Fredrick Douglass Bl
Manhattan, NY 10030BBL 1-01939-0063Map
Owner of record: 115-135 Fdb LLC
2500 Fredrick Douglass Bl is a walk-up apartment building built in 1910 in Manhattan, 10030. It has 10 residential units across 5 floors. The owner of record is 115-135 Fdb LLC. HPD has recorded 275 housing violations here, most recently on October 2, 2026. 18 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 275
- DOB violations
- 9
- ECB violations
- 1
- HPD complaints
- 270
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 275
- BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the rubbish at stairs at all stories at public hall stairs
Oct 2, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the foyer , the private hallway located at apt 5a, 5th story, 1st apartment from south at west
Jul 27, 2026 · Apt 5A
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Jul 27, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Jul 27, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 5a, 5th story, 1st apartment from south at west
Jul 27, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at 1sty window from south at west wall in the 3rd room from east at south located at apt 5a, 5th story, 1st apartment from south at west
Jul 27, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Properly secure the loose wash basin in the bathroom located at apt 5a, 5th story, 1st apartment from south at west
Jul 27, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Jul 21, 2026
Open — Nov certified on time - BHazardous
Properly secure the loose wash basin to base cabinet in the bathroom located at apt 5a, 5th story, 1st apartment from south at west
Jul 21, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st private hallway from north located at apt 5a, 5th story, 1st apartment from south at west
Jul 21, 2026 · Apt 5A
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Jul 21, 2026
Open — Nov certified on time - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story
Jul 21, 2026
Open — Nov certified on time - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 1st room from east located at apt 2b, 2nd story, 1st apartment from north at east
May 30, 2026 · Apt 2B
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from north at east
May 30, 2026 · Apt 2B
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from north at east
May 30, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective bell buzzer and return intercom system at building front to panel at south wall in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
May 30, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 5th story
Mar 5, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 5a, 5th story, 1st apartment from south at west
Mar 5, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 5a, 5th story, 1st apartment from south at west
Mar 5, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Mar 5, 2026 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story
Mar 5, 2026
Closed — Violation dismissed - BHazardous
Refit door in the entrance located at apt 5a, 5th story, 1st apartment from south at west
Mar 5, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective hydronic baseboard heater cover missing cover in the 3rd room from east at north located at apt 5a, 5th story, 1st apartment from south at west
Mar 5, 2026 · Apt 5A
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at 1st public hall bulkhead from north
Mar 5, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling at public hall, 5th story
Jan 27, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at public hall, 5th story
Jan 27, 2026
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 5th story
Jan 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Jan 27, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Jan 27, 2026 · Apt 5A
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the kitchen , the bathroom , the foyer located at apt 5a, 5th story, 1st apartment from south at west
Jan 27, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Jan 27, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Jan 27, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Jan 26, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jan 26, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Jan 21, 2026 · Apt 5A
Open — Invalid certification - CImmediately hazardous
Properly repair or replace the broken or defective radiator at west wall in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from south at west
Jan 21, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective radiator at west wall in the 1st room from east at south located at apt 5a, 5th story, 1st apartment from south at west
Jan 21, 2026 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at west wall west wall in the 1st room from east at south located at apt 5a, 5th story, 1st apartment from south at west
Jan 21, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at door in the entrance located at apt 5a, 5th story, 1st apartment from south at west
Jan 21, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Jan 4, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5a, 5th story, 1st apartment from south at west
Dec 7, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Dec 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Dec 7, 2025 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Dec 7, 2025 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south located at apt 5a, 5th story, 1st apartment from north at east
Nov 20, 2025 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
Nov 16, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
Nov 16, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
Nov 16, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective, more than 12 inches from ceiling in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east
Nov 16, 2025 · Apt 5A
Closed — Violation dismissed
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Aug 14, 1995
V%*-dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
One light fixture is broken and hanging by it conductors at the front of the building, comply with ec; comply with ec code
Jul 10, 2020 · Penalty $4,000
Active
Complaints
- Flooring/stairs
Floor
Jul 17, 2026 · Apt 5A
Close - Water leak
Slow leak
Jul 17, 2026 · Apt 5A
Close - Paint/plaster
Wall
Jul 17, 2026 · Apt 5A
Close - Paint/plaster
Wall
Jul 17, 2026 · Apt 5A
Close - Paint/plaster
Wall
Jul 17, 2026 · Apt 5A
Close - Paint/plaster
Wall
Jul 17, 2026 · Apt 5A
Close - General
Cabinet
Jul 17, 2026 · Apt 5A
Close - Water leak
Slow leak
Jul 17, 2026 · Apt 5A
Close - Door/window
Window frame
Jun 21, 2026 · Apt 5A
Close - Plumbing
Basin/sink
Jun 21, 2026 · Apt 5A
Close
Show 40 more ↓
- Flooring/stairs
Floor
Jun 21, 2026 · Apt 5A
Close - Door/window
Door
Jun 21, 2026 · Apt 5A
Close - Paint/plaster
Wall
Jun 21, 2026 · Apt 5A
Close - Plumbing
Basin/sink
Jun 21, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Apr 14, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Mar 30, 2026 · Apt 2B
Close - Plumbing
Radiator
Feb 27, 2026 · Apt 5A
Close - Door/window
Door
Feb 27, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Feb 27, 2026 · Apt 5A
Close - General
Cabinet
Feb 27, 2026 · Apt 5A
Close - Flooring/stairs
Floor
Feb 27, 2026 · Apt 5A
Close - Water leak
Slow leak
Feb 27, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Feb 27, 2026 · Apt 5A
Close - Electric
No lighting
Feb 27, 2026 · Apt 5A
Close - Plumbing
Basin/sink
Feb 24, 2026 · Apt APT5A
Close - Unsanitary condition
Pests
Feb 24, 2026 · Apt APT5A
Close - Door/window
Window frame
Feb 24, 2026 · Apt APT5A
Close - Plumbing
Water supply
Feb 24, 2026 · Apt APT5A
Close - Door/window
Door frame
Feb 24, 2026 · Apt APT5A
Close - Water leak
Slow leak
Feb 24, 2026 · Apt APT5A
Close - Heat/hot water
Apartment only
Feb 24, 2026 · Apt APT5A
Close - Heat/hot water
Apartment only
Feb 6, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Jan 24, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 23, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 18, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 1, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 5A
Close - Door/window
Door frame
Dec 14, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt 5A
Close - Unsanitary condition
Pests
Nov 14, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 5A
Close - Door/window
Door
Nov 14, 2025 · Apt 5A
Close - Paint/plaster
Ceiling
Nov 14, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Nov 14, 2025 · Apt BLDG
Close - General
Cabinet
Sep 25, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Sep 15, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Jul 16, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 18, 2025 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 10
- Building area
- 9,475 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1939 / 63
- Assessed value
- $459,450
- Landmark / historic district
- No
HPD registration #130770, last renewed Sep 18, 2025.
Questions about 2500 Fredrick Douglass Bl
Who owns 2500 Fredrick Douglass Bl?
The owner of record in NYC Department of City Planning PLUTO data is 115-135 Fdb LLC.
Does 2500 Fredrick Douglass Bl have violations?
Yes. NYC HPD has recorded 275 housing violations at this property.
Is 2500 Fredrick Douglass Bl rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 90% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2500 Fredrick Douglass Bl built?
City records list 1910 as the year it was built.
How many apartments are in 2500 Fredrick Douglass Bl?
It has 10 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.