163 St Nicholas Avenue
Manhattan, NY 10026BBL 1-01924-7501Map
Owner of record: Rosa Parks Condominium
163 St Nicholas Avenue is a condominium built in 2003 in Manhattan, 10026. It has 64 residential units across 8 floors. The owner of record is Rosa Parks Condominium. HPD has recorded 25 housing violations here, most recently on September 26, 2022.
- HPD violations
- 25
- DOB violations
- 19
- ECB violations
- 6
- HPD complaints
- 43
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at south bulkhead
Sep 26, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at bulkhead
Sep 26, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 26, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall
Sep 26, 2022
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead
Sep 26, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 19, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 19, 2017
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 19, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 19, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 19, 2017
Closed — Violation closed
Show 15 more ↓
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 19, 2017
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at boiler room door and at public hall, 1st story
Jul 19, 2017
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of evidence of water leak at ceiling in the 1st room from east at south located at apt 6d, 6th story, 1st apartment from north at east
Jun 22, 2007 · Apt 6D
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of evidence of prior water leak at ceiling in the 1st room from east located at apt 6d, 6th story
Jun 22, 2007 · Apt 6D
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of evidence of previous water leak at ceiling in the 2nd room from east at north located at apt 6d, 6th story, 1st apartment from north at east
Jun 22, 2007 · Apt 6D
Closed — Violation closed - BHazardous
Replace with new the broken or defective wood floor at center in the 3rd room from east located at apt 6d, 6th story, 3rd apartment from north at east
Jun 22, 2007 · Apt 6D
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of wood floor at the center in the 2nd room from east at center located at apt 6d, 6th story, 1st apartment from north at east
Jun 22, 2007 · Apt 6D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 6d, 6th story, 1st apartment from north at east
Jun 22, 2007 · Apt 6D
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed water leak from ceiling in the 1st room from north located at apt 6d, 6th story, 1st apartment from north at east
Apr 25, 2005 · Apt 6D
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed water leak from ceiling in the 3rd room from north located at apt 6d, 6th story, 1st apartment from north at east
Apr 25, 2005 · Apt 6D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 2nd room from north located at apt 6d, 6th story, 1st apartment from north at east
Apr 25, 2005 · Apt 6D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 6d, 6th story, 1st apartment from north at east
Apr 25, 2005 · Apt 6D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 6d, 6th story, 1st apartment from north at east
Apr 25, 2005 · Apt 6D
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood/floor, in the 1st bedroom from east at north located at apt 6d, 6th story, 1st apartment from west at north
Jan 28, 2005 · Apt 6D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, in the 1st bedroom from east at north located at apt 6d, 6th story, 1st apartment from west at north
Jan 28, 2005 · Apt 6D
Closed — Violation closed
DOB building violations · 19
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2018
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2013
Dob violation - resolved
Show 9 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 2, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 2, 2006
Dob violation - resolved
ECB violations · 6
- Class - 1
Sec. 3314.1 rope protection. at time of inspection observed lifeline for suspended scaffold exp#2 wrapped aroubd hvac vent,no rope protection. also no protection for tieback line on coping leading from outrigge
Jul 18, 2019 · Penalty $625
Resolve - Class - 2
Sec. 3314.10.9 perpendicular tiebacks. observed outriggers @ exp#2&3 w/tiebacks not perpendicular. tieback lines were obstructed & not adequately portential. tieback attached to stair riser of bulkhead setback.
Jul 18, 2019
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#813314. remedy: submit required technical report
May 18, 2018 · Penalty $625
Resolve - Hazardous
Failure to maintain building exterior walls: in that exterior buildingwalls south and north are defective-bricks are missing-jagged areas left due to adjacent buildings demolition need to properly "pointed"
Aug 20, 1999 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior of bldg wall. defects are: parapet area,various locations are defective. missing mortar joints. missing correct waterproof due to leaks. brick work unkeyed & missing.
Jan 13, 1998 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain defect is stairs have broken or seperated losse steps in public hallway from first floor to fifth floor remedy repair steps & maitain
Dec 11, 1996 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Nov 2, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 2, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 2, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 11, 2017 · Apt 5J
Close - Unsanitary condition
Garbage/recycling storage
Nov 1, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 1, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 1, 2015 · Apt BLDG
Close - General
Window guards
Aug 19, 2011 · Apt 5C
Close - Heating
Heat related
Jan 21, 2008 · Apt BLDG
Close - Plumbing
Water-leaks
Jun 14, 2007 · Apt 6D
Close
Show 33 more ↓
- Paint/plaster
Ceiling
Jun 14, 2007 · Apt 6D
Close - Paint/plaster
Wall
Jun 14, 2007 · Apt 6D
Close - Paint/plaster
Wall
Jun 14, 2007 · Apt 6D
Close - Plumbing
Water-leaks
Jun 14, 2007 · Apt 6D
Close - Plumbing
Water-leaks
Jun 14, 2007 · Apt 6D
Close - Paint/plaster
Wall
Jun 14, 2007 · Apt 6D
Close - General
Floor
Jun 14, 2007 · Apt 6D
Close - General
Floor
Jun 14, 2007 · Apt 6D
Close - General
Floor
Jun 14, 2007 · Apt 6D
Close - General
Mold
Jun 14, 2007 · Apt 6D
Close - General
Mold
Jun 14, 2007 · Apt 6D
Close - General
Mold
Jun 14, 2007 · Apt 6D
Close - Paint/plaster
Ceiling
Jun 14, 2007 · Apt 6D
Close - Paint/plaster
Ceiling
Jun 14, 2007 · Apt 6D
Close - Plumbing
Water-leaks
Apr 30, 2007 · Apt 6D
Close - Plumbing
Water-leaks
Apr 30, 2007 · Apt 6D
Close - Plumbing
Water-leaks
Apr 30, 2007 · Apt 6D
Close - Plumbing
Water-leaks
Apr 18, 2007 · Apt 6D
Close - Plumbing
Water-leaks
Apr 18, 2007 · Apt 6D
Close - Heating
Heat related
Dec 29, 2006 · Apt 3C
Close - Paint/plaster
Ceiling
Apr 4, 2005 · Apt 6D
Close - Paint/plaster
Ceiling
Apr 4, 2005 · Apt 6D
Close - Plumbing
Water-leaks
Apr 4, 2005 · Apt 6D
Close - Paint/plaster
Ceiling
Apr 4, 2005 · Apt 6D
Close - Paint/plaster
Ceiling
Apr 4, 2005 · Apt 6D
Close - Paint/plaster
Ceiling
Apr 4, 2005 · Apt 6D
Close - Paint/plaster
Ceiling
Apr 4, 2005 · Apt 6D
Close - Plumbing
Water-leaks
Apr 4, 2005 · Apt 6D
Close - Plumbing
Water-leaks
Apr 4, 2005 · Apt 6D
Close - Plumbing
Water-leaks
Apr 4, 2005 · Apt 6D
Close - General
Mold
Oct 28, 2004 · Apt 6D
Close - Plumbing
Water-leaks
Oct 28, 2004 · Apt 6D
Close - Heating
Heat related
Sep 21, 2004 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2003
- Floors
- 8
- Residential units
- 64
- Building area
- 74,087 ft²
- Lot area
- 17,305 ft²
- Zoning
- R7A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1924 / 7501
- Assessed value
- $6,195,603
- Landmark / historic district
- No
HPD registration #142268, last renewed Sep 9, 2025.
Questions about 163 St Nicholas Avenue
Who owns 163 St Nicholas Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Rosa Parks Condominium.
Does 163 St Nicholas Avenue have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 163 St Nicholas Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 163 St Nicholas Avenue built?
City records list 2003 as the year it was built.
How many apartments are in 163 St Nicholas Avenue?
It has 64 residential units and 82 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.