103 West 127 Street
Manhattan, NY 10027BBL 1-01912-0026Map
Owner of record: West 128th Street L.p.
103 West 127 Street is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 25 residential units across 6 floors. The owner of record is West 128th Street L.p.. HPD has recorded 48 housing violations here, most recently on January 7, 2026. 6 of the 48 most recent violations are still open. City tax records listed 24 rent-stabilized apartments here in 2024.
- HPD violations
- 48
- DOB violations
- 8
- ECB violations
- 16
- HPD complaints
- 147
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 48
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jan 7, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at all areas at front areaway, 1st story
Jan 7, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at window recess at 1st window from west at north in the 1st room from east located at apt 5b, 5th story, 1st apartment from west at north
Oct 11, 2025 · Apt 5B
Open — First no access to re- inspect violation - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Aug 26, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of glass light blocks installed at all stories public hall windows thru-out blocking light and ventilation at public hall
Aug 26, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to north yard. at public hall, 1st story
Aug 26, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jul 25, 2025
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 25, 2025 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall, 4th story
Jul 1, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door to rear yard at west at public hall, 1st story
Jul 1, 2025
Closed — Violation closed
Show 38 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Jul 1, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing rope tied from roof bulkhead door to railing
Jul 1, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 2nd apartment from north at east
Mar 4, 2025 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 4, 2025
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d, 2nd story, 2nd apartment from north at east
Mar 4, 2025 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 2nd apartment from north at east
Feb 23, 2024 · Apt 5D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 2b, 2nd story, 1st apartment from west at north
Nov 13, 2023 · Apt 2B
Open — Defect letter issued - BHazardous
Repair the broken or defective connection wasteline under sink in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Nov 13, 2023 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective counter top at sink in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Nov 13, 2023 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Oct 29, 2023 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 29, 2023
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system phone number missing at public hall, 1st story
Oct 29, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from east at south
Mar 14, 2023 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 5a, 5th story, 1st apartment from east at south
Mar 14, 2023 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 5a, 5th story, 1st apartment from east at south
Mar 14, 2023 · Apt 5A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 1st room from north located at apt 5a, 5th story, 1st apartment from east at south
Mar 14, 2023 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north located at apt 5a, 5th story, 1st apartment from east at south
Mar 14, 2023 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 12, 2022
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Oct 12, 2022 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at entrance located at apt 2b, 2nd story, 1st apartment from west at north
Sep 20, 2021 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at west located at apt 6d, 6th story, 2nd apartment from north at east
Aug 23, 2020 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 4th room from north at west located at apt 6d, 6th story, 2nd apartment from north at east
Aug 23, 2020 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall around the window in the 1st room from north located at apt 6d, 6th story, 2nd apartment from north at east
Aug 23, 2020 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at east located at apt 6d, 6th story, 2nd apartment from north at east
Aug 23, 2020 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall around the window in the 3rd room from north at west located at apt 6d, 6th story, 2nd apartment from north at east
Aug 23, 2020 · Apt 6D
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety covers at electrical outlet, total 12 pcs at east and west wall all stories at public hall
Apr 4, 2020
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing electrical outlet safety covers/caps at all stories at public hall
Jun 19, 2017
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective gasket around fridge door in the kitchen located at apt 1d, 1st story
Jun 23, 2015 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective counter top in the kitchen located at apt 2b, 2nd story, apartment at north
Jul 9, 2014 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective connection waste line at washbasin in the bathroom located at apt 2b, 2nd story
Jul 9, 2014 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls at east and west windows in the 2nd room from east located at apt 6b, 6th story, 1st apartment from west at north
Jun 25, 2013 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood stool at east and west windows in the 2nd room from east located at apt 6b, 6th story, 1st apartment from west at north
Jun 25, 2013 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak walls at east and west windows in the 1st room from east located at apt 6b, 6th story, 1st apartment from west at north
Jun 25, 2013 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls at east and west windows in the 1st room from east located at apt 6b, 6th story, 1st apartment from west at north
Jun 25, 2013 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective window stool at east and west windows in the 1st room from east located at apt 6b, 6th story, 1st apartment from west at north
Jun 25, 2013 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak walls east and west windows in the 2nd room from east located at apt 6b, 6th story, 1st apartment from west at north
Jun 25, 2013 · Apt 6B
Closed — Violation dismissed
DOB building violations · 8
- Construction other optional
Failure to maintain building in a code compliant manner.as noted at ti me of inspection,i observed on exp1 south elevation,cracks in terracot ta windows trim on 4th floor;cracks in parapet stucco.exposure 4 east elevation-cracks in brick spanderls at mutliple locations.remedy:repai r and/or replace all damaged facade and appurtenances
May 12, 2026
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2019
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boiler boiler optional
32 breeching not properly sealed at base of chimney
Jan 26, 1990
Dob violation - dismissed
ECB violations · 16
- Class - 2
Predestrian protection does not meet code specifications. as noted: atthe time of inspection, i observed rotted; damaged mud sills at several supporting post. for sidewalk sheds. remedy: comply to code specific
May 12, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection of 6 story residential buildings observed sidewalk shed in place with mudsills in rotting condition causing hazardous conditions.
Apr 21, 2026
Resolve - Class - 2
Failure to file acceptable amended cycle 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #813626. agg1: prior nov 37026088j under 28-302
Apr 20, 2026 · Penalty $3,155
Active - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #913626. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Active - Class - 2
Failure to maintain exterior building facade and appurtenances. noted:observed at corner of exp 1(s. elev) and exp 4(e. elev) there is a cracked and displaced bricks at top story window level. remedy: maintain
Nov 7, 2024 · Penalty $1,250
Active - Class - 1
Failure to maintain exterior facade and appurtenances.notes:observed at exp#1(south)south/west corner vehicle crack and displaced brick at top story window level.sidewalk shed in place.rem:maintain exterior fac
Sep 9, 2024 · Penalty $12,500
Active - Class - 2
Failure to file acceptable amended cycle 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#813626.agg1:prior nov 37022208r under 28-302.5
Jan 16, 2024 · Penalty $3,125
Active - Class - 2
Project information panel/sidewalk shed parapet panel/construction sign not provided or not incompliance with section.i observed a sidewalk shed installed at exp#1 with no project information panel which is req
Apr 24, 2023
Resolve - Class - 2
Pedestrian protection does not meet code specifications.i observed a sidewalk shed erected at exp#1 with an secured parapet panel and shed rest on loose soil which create unsafe condition.also observed deterior
Apr 24, 2023 · Penalty $2,400
Resolve - Class - 2
Note : at the time of inspection observed a sidewalk shed in front of bldg. with active permit. observed missing/inadequate parapet information panel, create hazard for 1st responder in case of emergency.provid
Oct 13, 2022 · Penalty $625
Resolve
Show 6 more ↓
- Class - 2
Note: at the time of inspection observed a sidewalk shed in front of bldg. with active permit. observed missing screw caps create sharp edge(3307.6.5.6) & cut hazard for pedestrian; shed rest on loose soil, dis
Oct 13, 2022 · Penalty $5,000
Resolve - Class - 2
Failure to file acceptable amended cycle 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #813626.remedy:file acceptable report.
Oct 8, 2021 · Penalty $6,250
Active - Hazardous
Sidewalk shed not adequately maintained. noted: front sidewalk shed roof used for storage of new bricks, wood and bags of sand. front side enclosure missing approx 6 feet. remedy: maintain sidewalk shed. remove
Jun 16, 2003 · Penalty $1,000
Resolve - Hazardous
Failure to maintain adequate housekeeping noted:first floor hallway, front areaway and cellar courtyard filled with construction dearii cellar courtyard 3 inch x 8 inch wooden floor joist piled approx 12 feet
Jun 4, 2003 · Penalty $1,250
Resolve - Hazardous
Failure to maintain adeqaute houekeeping noted : construction debris (wood / lath, plaster bricks ) throughout building. stairs, corridor and floors debri piled up approx one foot on floors hazardous for walkin
May 12, 2003 · Penalty $500
Resolve - Non-hazardous
Failure to maintain,section of steel brackets cracked & open & pulled away at 5th floor stair landing with missing step creating a hazardous condition(note:temporary shoring & cracing placed under stairway.reme
Dec 10, 2001
Resolve
Complaints
- Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 1A
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BUILDW
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close - General
Cabinet
Jan 3, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Jan 3, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Dec 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt 3D
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Oct 9, 2025 · Apt 5B
Close - Safety
Fire escape
Sep 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 24, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Mar 5, 2025 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 6
- Residential units
- 25
- Building area
- 20,700 ft²
- Lot area
- 4,996 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1912 / 26
- Assessed value
- $468,000
- Landmark / historic district
- No
HPD registration #110726, last renewed Oct 14, 2025.
Questions about 103 West 127 Street
Who owns 103 West 127 Street?
The owner of record in NYC Department of City Planning PLUTO data is West 128th Street L.p..
Does 103 West 127 Street have violations?
Yes. NYC HPD has recorded 48 housing violations at this property.
Is 103 West 127 Street rent stabilized?
NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 96% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 103 West 127 Street built?
City records list 1910 as the year it was built.
How many apartments are in 103 West 127 Street?
It has 25 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.