roofy

2041 Adam C Powell Blvd

Manhattan, NY 10027BBL 1-01907-0001Map

Owner of record: Hph Milano, LLC

2041 Adam C Powell Blvd is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 23 residential units across 5 floors. The owner of record is Hph Milano, LLC. HPD has recorded 186 housing violations here, most recently on September 16, 2026. 7 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.

HPD violations
186
DOB violations
37
ECB violations
10
HPD complaints
442

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Sep 16, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
23
About 100% of the building's 23 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 186

  • B

    Properly repair or replace the broken or defective counter balance at lower sash window at east wall in the 1st room from east at south located at apt 1d, 1st story, 1st apartment from east at south

    Sep 16, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 1d, 1st story, 1st apartment from east at south

    Sep 16, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 1d, 1st story, 1st apartment from east at south

    Sep 16, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective counter balance at lower sash east window, center window and north window at west wall in the 5th room from east located at apt 1d, 1st story, 1st apartment from east at south

    Sep 16, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west

    Jul 11, 2026 · Apt 2E

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west

    Jul 11, 2026 · Apt 2E

    Open — Civ14 mailed
  • C

    M/d law abate the nuisance consisting of hot water exceeds maximum allowable temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west

    Jun 1, 2026 · Apt 2E

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt 2e, 2nd story, 1st apartment from south at west

    Jun 1, 2026 · Apt 2E

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective ceramic floor tile at public hall

    May 27, 2026

    Open — Nov certified on time
  • C

    Provide ready access to buildings heating system door locked at basement

    Dec 16, 2025

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt ga, 1st story, 1st apartment from west at north

    Dec 16, 2025 · Apt GA

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the 2nd room from north located at apt 2e, 2nd story, 1st apartment from south at west

    Nov 29, 2024 · Apt 2E

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd room from north located at apt 2e, 2nd story, 1st apartment from south at west

    Nov 29, 2024 · Apt 2E

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 2e, 2nd story, 1st apartment from south at west

    Nov 29, 2024 · Apt 2E

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2e, 2nd story, 1st apartment from south at west

    Nov 29, 2024 · Apt 2E

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west

    Nov 27, 2024 · Apt 2E

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west

    Nov 27, 2024 · Apt 2E

    Closed — Violation dismissed
  • B

    Refit lower sash at south window on east wall in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from west at north

    Oct 17, 2024 · Apt 1A

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at bsmt-apt ga, 1st bsmt-apt from west at north

    Oct 17, 2024 · Apt GA

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north

    Oct 17, 2024 · Apt 1A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Oct 17, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from west at north

    Jun 24, 2024 · Apt 1C

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to the basement at north. at public hall, 1st story

    Mar 27, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective missing latch set at vestibule door at public hall, 1st story

    Jan 30, 2024

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at basement at boiler room

    Jan 10, 2024

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt ga, 1st story, 1st apartment from west at north

    Jan 10, 2024 · Apt GA

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt ga, 1st apartment from west at north

    Jan 2, 2024 · Apt GA

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt ga, 1st apartment from west at north

    Jan 2, 2024 · Apt GA

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt ga, 1st apartment from west at north

    Jan 2, 2024 · Apt GA

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 2, 2024

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt ga, 1st apartment from west at north

    Jan 2, 2024 · Apt GA

    Closed — Violation dismissed
  • A

    Properly secure the loose electrical outlet at west wall in the kitchen located at apt ga, 1st apartment from west at north

    Jan 2, 2024 · Apt GA

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall

    Jan 2, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 4b, 4th story, 2nd apartment from west at north

    Dec 5, 2022 · Apt 4B

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective telephone intercom system from building entrance to apt. located at apt 1b, 2nd story, 1st apartment from west at north

    Aug 29, 2022 · Apt 1B

    Closed — Violation dismissed
  • A

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear at east yard

    Aug 29, 2022

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective mechanical air vent at south wall in the 1st bathroom located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 29, 2022 · Apt 1B

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system .locked door at boiler room

    Aug 29, 2022

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 29, 2022 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective ceiling light fixture at public hall, 2nd story

    Aug 29, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt g8, 1st story, 1st apartment from west at north

    Feb 15, 2022 · Apt G8

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective radiator air valve in the 4th room from north located at apt g8, 1st story, 1st apartment from west at north

    Feb 15, 2022 · Apt G8

    Closed — Violation closed
  • C

    Replace with new the broken or defective radiator air valve in the 1st room from north located at apt g8, 1st story, 1st apartment from west at north

    Feb 15, 2022 · Apt G8

    Closed — Violation closed
  • B

    Properly repair the broken or defective spring balance at lower window sash in the 1st room from north located at apt 4a, 4th story, 1st apartment from east at south

    Feb 11, 2022 · Apt 4A

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the 3rd room from north located at apt 4e, 4th story, 1st apartment from east at south

    Dec 23, 2021 · Apt 4E

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Dec 23, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south

    Dec 22, 2021 · Apt 4E

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system basement door locked at boiler room

    Dec 22, 2021

    Closed — Violation dismissed

DOB building violations · 37

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Plumbing none

    The borough commissioner has issued a notice to revoke application #12 2585540 due to revocation of the master plumbers license #1350.all wor k in connection with this application has been ordered stopped immedia tely

    Jan 8, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
Show 27 more ↓
  • Electric signs none

    Es-electric signs none

    Mar 31, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 19, 1988

    Dob violation - dismissed

ECB violations · 10

  • Class - 2

    Altered/changed building occupied w/o a valid certificate of occupancyas per 28-118.3.1-28-118.3.2. noted:upon inspection observed an occupied mixed use bldg. ground level consist of commercial spaces and entra

    Jan 31, 2020

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35245572z issued on 06/07/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rear gates to street loc

    Jul 28, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain noted at time of inspection rear gates to street for rear fire escape passage locked & chained shut.rem:maintain building in code compliant manner.

    Jun 7, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Work w/o permit. work noted:install illuminated sign: jam seal at front of premises above 1 floor bar/cafeteria. rmdy: stop all work obtain permit.

    Feb 18, 2016 · Penalty $800

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments appl #121352730 non conforming work noted: install shower in bathroom; 2-create opening to install door frame in fire separati

    Feb 18, 2016 · Penalty $500

    Resolve
  • Class - 2

    B254,34a,34b,15,50a,50b,50c,50d. 50a-no clean out on chimney base; 50bno emergence fuel cut off switch out side of boiler room door; 50c-pipe back how discharge down; 50d-neck loose neck on fresh air intake.

    Dec 5, 2014 · Penalty $250

    Resolve
  • Class - 2

    B254,34a,34b,15,50a. 50a-no clean out in chimney base.

    Dec 5, 2014 · Penalty $250

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34915263z issued on 6/17/11. for failure to maintain exteriorbldg walls store around windows spalling & cracked. remedy: comply

    Aug 9, 2013 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain exterior bldg wall defect is brown stone and decorative stone around window openings is spalling deteriorated cracked and section fell to side walk at west side of bldg rem; immediately erec

    Jun 17, 2011 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to maintain exterior building wall. defect is: masonary linteland brick work above has collapsed onto public sidewalk at 3rd story south east corner of bldg. at west 122nd street. (approx size of

    Nov 22, 1994

    Resolve

Complaints

  • Water leak

    Damp spot

    Oct 8, 2026 · Apt GA

    Close
  • Paint/plaster

    Wall

    Sep 14, 2026 · Apt 1D

    Close
  • Door/window

    Window frame

    Sep 14, 2026 · Apt 1D

    Close
  • Flooring/stairs

    Floor

    Sep 14, 2026 · Apt 1D

    Close
  • Flooring/stairs

    Floor

    Sep 14, 2026 · Apt 1D

    Close
  • Water leak

    Slow leak

    Sep 11, 2026 · Apt GA

    Close
  • Plumbing

    Basin/sink

    Jun 28, 2026 · Apt GA

    Close
  • Unsanitary condition

    Pests

    Jun 19, 2026 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Jun 2, 2026 · Apt 4D

    Close
  • Plumbing

    Water supply

    May 29, 2026 · Apt 2E

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    May 29, 2026 · Apt 2E

    Close
  • Electric

    Outlet/switch

    May 29, 2026 · Apt 2E

    Close
  • Electric

    Lighting

    May 29, 2026 · Apt 2E

    Close
  • Paint/plaster

    Ceiling

    May 29, 2026 · Apt 2E

    Close
  • Door/window

    Door

    May 29, 2026 · Apt 2E

    Close
  • Electric

    Outlet/switch

    May 29, 2026 · Apt 2E

    Close
  • Appliance

    Refrigerator

    May 29, 2026 · Apt 2E

    Close
  • Plumbing

    Basin/sink

    May 29, 2026 · Apt 2E

    Close
  • Unsanitary condition

    Pests

    May 3, 2026 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 21, 2026 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2026 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt GA

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2025 · Apt GA

    Close
  • Appliance

    Refrigerator

    Dec 22, 2025 · Apt GA

    Close
  • Appliance

    Refrigerator

    Dec 22, 2025 · Apt GA

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2025 · Apt GA

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2025 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2025 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    Nov 11, 2025 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    Nov 10, 2025 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    Nov 7, 2025 · Apt 4E

    Close
  • Heat/hot water

    Apartment only

    Nov 3, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Oct 16, 2025 · Apt GA

    Close
  • Unsanitary condition

    Mold

    Jul 2, 2025 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Jul 2, 2025 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Jul 2, 2025 · Apt 1B

    Close
  • Appliance

    Refrigerator

    Jul 2, 2025 · Apt 1B

    Close
  • Plumbing

    Toilet

    Jul 2, 2025 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt GB

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1910
Floors
5
Residential units
23
Building area
21,340 ft²
Lot area
7,200 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
1907 / 1
Assessed value
$837,450
Landmark / historic district
No

HPD registration #122463, last renewed Aug 29, 2025.

Questions about 2041 Adam C Powell Blvd

Who owns 2041 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is Hph Milano, LLC.

Does 2041 Adam C Powell Blvd have violations?

Yes. NYC HPD has recorded 186 housing violations at this property.

Is 2041 Adam C Powell Blvd rent stabilized?

NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 100% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2041 Adam C Powell Blvd built?

City records list 1910 as the year it was built.

How many apartments are in 2041 Adam C Powell Blvd?

It has 23 residential units and 27 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.