2013 Adam C Powell Blvd
Manhattan, NY 10027BBL 1-01905-0063Map
Owner of record: Jericho Housing Devfund
2013 Adam C Powell Blvd is a hospital / health built in 1910 in Manhattan, 10027. The owner of record is Jericho Housing Devfund. HPD has recorded 66 housing violations here, most recently on April 29, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 66
- DOB violations
- 19
- ECB violations
- 4
- HPD complaints
- 140
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 66
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 302, 3rd story, 2nd apartment from south at west
Mar 12, 2026 · Apt 302
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures located at b-room 303, 3rd story, 3rd b-room from south at west
Mar 12, 2026 · Apt 303
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 12, 2026
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink at community kitchen at public hall, 2nd story
Sep 17, 2024
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at sink at community kitchen at public hall, 2nd story
Sep 17, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches located at b-room 204, 2nd story, 4th b-room from south at west
Sep 17, 2024 · Apt 204
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hingesat door leading to public hall stairs at 1st public hall from north, 2nd story
Mar 22, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and west wall at public hall, 2nd story
Sep 26, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall, 2nd story
Sep 26, 2023
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east and north walls and ceiling at community bathroom, 2nd story
Aug 15, 2023
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wash basin wasteline at community bathroom, 2nd story
Aug 15, 2023
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at east and north walls and ceiling at community bathroom, 2nd story
Aug 15, 2023
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at community bathroom, 2nd story
Aug 15, 2023
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the east wall at 3rd community bathroom from north at east, 2nd story
Jul 10, 2023
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling at 3rd community bathroom from north at east, 2nd story
Jul 10, 2023
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and all walls at 3rd community bathroom from north at east, 2nd story
Jul 10, 2023
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall at 3rd community bathroom from north at east, 2nd story
Jul 10, 2023
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling at 2nd community bathroom from north at east, 2nd story
Jul 10, 2023
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the south wall at 2nd community bathroom from north at east, 2nd story
Jul 10, 2023
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and the south wall at 2nd community bathroom from north at east, 2nd story
Jul 10, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective . at community kitchen, 2nd story
Jul 8, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective . at 3rd community bathroom from north, 2nd story
Jul 8, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing a stopper installed on the door at 3rd community bathroom from north, 2nd story
Jul 8, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 2nd story
Jul 8, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing a stopper installed at the door at community kitchen, 2nd story
Jul 8, 2023
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling, west, south and north walls at public hall, 2nd story
Jul 8, 2023
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of garbage bins at public hall, 5th story
Apr 18, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in 1st community bathroom from north , 2nd story
Apr 18, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in 3rd community bathroom from north , 2nd story
Apr 18, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling in 3rd community bathroom from north , 2nd story
Apr 18, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at 2nd community bathroom from east, 2nd story
Jul 7, 2022
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at lobby, 1st story
Jul 7, 2022
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at 2nd community bathroom from east, 2nd story
Jul 7, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at lobby, 1st story
Jul 7, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective base cabinet in the kitchen located at apt 204, 2nd story, 4th apartment from south at west
Jul 23, 2019 · Apt 204
Closed — Violation dismissed - BHazardous
Replace the broken or defective pedestal base support at wash/basin at community bathroom at north , 5th story
Apr 26, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and east wall at public hall, 5th story
Apr 26, 2019
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical ceiling light fixture at public hall, 5th story
Apr 26, 2019
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 5th story
Apr 26, 2019
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling and east wall at public hall, 5th story
Apr 26, 2019
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at east wall at community kitchen, 5th story
Sep 22, 2017
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall at 2nd community bathroom, 5th story
Sep 22, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at sink wasteline at community kitchen, 4th story
Sep 22, 2017
Closed — Violation dismissed - BHazardous
Properly secure the loose sink at community kitchen, 4th story
Sep 22, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at community bathroom, 4th story
Sep 22, 2017
Closed — Violation dismissed - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. at community bathroom, 3rd story
Sep 22, 2017
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at community bathroom, 3rd story
Sep 22, 2017
Closed — Violation dismissed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 22, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2005
Dob violation - resolved - Elevator elevatorrequired
1p36422
Jan 15, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 1
05l10,16l10. 05l10-car door came off track causing me to get trapped; 16l10-no roller on 2nd flr defective causing car door to come off track.
Jan 26, 2015 · Penalty $1,000
Resolve - Class - 2
B251.05e01,07m07,24i10,14m07,39o02,41w07,11x10,71l07,70o02,10h11,08v01.05e:car door rubbing,adjust.07m:repair door restrictor.24i:repair directional arrows.14m:car mirror missing,provide.39o:car top dirty,clean
Mar 19, 2014 · Penalty $250
Resolve - Class - 2
10d6.17d6.02x10.21m7.21i11.42n9.48m7.70m7.03b10.32e10.03b vibration knocking on up aqnd down travel 10d car door gibs loose 17d hoistway door gibs loose 02x 2way emergency communication 21 roller assembly missi
Apr 21, 2009 · Penalty $500
Resolve - Non-hazardous
03m,16m,25h,55x,57o.03m-outside communication intercom phone 16m-back gib 2nd floor 25h-main drive bilt 1.
Dec 22, 1995 · Penalty $200
Resolve
Complaints
- Water leak
Slow leak
Sep 29, 2026 · Apt 4FLOOR
Open - Electric
Lighting
Sep 29, 2026 · Apt 4FLOOR
Open - Heat/hot water
Entire building
Jul 13, 2026 · Apt 208
Close - Plumbing
Steam pipe/riser
Mar 19, 2026 · Apt 208
Close - Paint/plaster
Ceiling
Mar 19, 2026 · Apt 208
Close - Paint/plaster
Wall
Mar 19, 2026 · Apt 208
Close - Plumbing
Radiator
Mar 19, 2026 · Apt 208
Close - Plumbing
Radiator
Mar 19, 2026 · Apt 208
Close - Heat/hot water
Apartment only
Mar 19, 2026 · Apt 208
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt 204
Close
Show 40 more ↓
- Plumbing
Water supply
Mar 12, 2026 · Apt 204
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt 208
Close - Heat/hot water
Apartment only
Mar 7, 2026 · Apt 204
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 208
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 208
Close - Plumbing
Toilet
May 7, 2025 · Apt 405
Close - Plumbing
Basin/sink
May 7, 2025 · Apt 405
Close - Plumbing
Bathtub/shower
May 7, 2025 · Apt 405
Close - Plumbing
Basin/sink
May 7, 2025 · Apt 405
Close - Unsanitary condition
Garbage/recycling storage
May 7, 2025 · Apt 405
Close - Heat/hot water
Entire building
Jan 16, 2025 · Apt 208
Close - Unsanitary condition
Pests
Sep 10, 2024 · Apt 204
Close - Plumbing
Toilet
Sep 10, 2024 · Apt 204
Close - Flooring/stairs
Floor
Sep 10, 2024 · Apt 204
Close - Plumbing
Water supply
Sep 6, 2024 · Apt 204
Close - Heat/hot water
Apartment only
Mar 21, 2024 · Apt 204
Close - Paint/plaster
Wall
Sep 14, 2023 · Apt 208
Close - Plumbing
Water supply
Sep 14, 2023 · Apt 208
Close - Paint/plaster
Ceiling
Sep 14, 2023 · Apt 208
Close - Paint/plaster
Ceiling
Sep 14, 2023 · Apt 208
Close - Elevator
Maintenance
Aug 2, 2023 · Apt 20B
Close - Paint/plaster
Wall
Aug 2, 2023 · Apt 20B
Close - Plumbing
Water supply
Aug 2, 2023 · Apt 20B
Close - Paint/plaster
Ceiling
Aug 2, 2023 · Apt 20B
Close - Unsanitary condition
Mold
Jul 5, 2023 · Apt 207
Close - Paint/plaster
Ceiling
Jul 5, 2023 · Apt 207
Close - Paint/plaster
Ceiling
Jul 4, 2023 · Apt 208
Close - Plumbing
Bathtub/shower
Jul 4, 2023 · Apt 208
Close - Plumbing
Water supply
Jun 28, 2023 · Apt 208
Close - Plumbing
Sewer
Jun 28, 2023 · Apt 208
Close - Door/window
Door
Mar 2, 2023 · Apt 208
Close - Safety
Fire escape
Aug 11, 2022 · Apt 208
Close - Plumbing
Bathtub/shower
Aug 8, 2022 · Apt 208
Close - Paint/plaster
Ceiling
Mar 23, 2022 · Apt 208
Close - Plumbing
Basin/sink
Mar 23, 2022 · Apt 208
Close - Heat/hot water
Entire building
Oct 18, 2021 · Apt 204
Close - Unsanitary condition
Pests
Oct 19, 2020 · Apt 208
Close - Unsanitary condition
Pests
Oct 19, 2020 · Apt 208
Close - Unsanitary condition
Pests
Jul 17, 2019 · Apt 204
Close - Plumbing
Basin/sink
Jul 17, 2019 · Apt 204
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I9)
- Year built
- 1910
- Floors
- 5
- Residential units
- —
- Building area
- 15,840 ft²
- Lot area
- 3,330 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1905 / 63
- Assessed value
- $1,267,650
- Landmark / historic district
- No
HPD registration #111721, last renewed Aug 6, 2025.
Questions about 2013 Adam C Powell Blvd
Who owns 2013 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Jericho Housing Devfund.
Does 2013 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 66 housing violations at this property.
Is 2013 Adam C Powell Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2013 Adam C Powell Blvd built?
City records list 1910 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.