2800 Broadway
Manhattan, NY 10025BBL 1-01880-0001Map
Owner of record: 255 W 108th St Corp
2800 Broadway is an elevator apartment building built in 1910 in Manhattan, 10025. It has 108 residential units across 12 floors. The owner of record is 255 W 108th St Corp. HPD has recorded 61 housing violations here, most recently on June 5, 2025. 45 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 61
- DOB violations
- 47
- ECB violations
- 32
- HPD complaints
- 50
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 61
- BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the bathroom located at apt 10d1, 10th story, 1st apartment from south at west
Jun 5, 2025 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood door jambs, header,trims, and door at west wall in the private hallway located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood window interior trims,header,jambs, stool,and apron at south wall in the 2nd room from east at south located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood door trims,header, jambs, and door at west wall in the bathroom located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window stool and apron at east wall in the kitchen located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood door jambs, header,trims, and door at south wall in the kitchen located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation heat radiator at east wall in the kitchen located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood door jambs, header,trims, and door at west wall in the kitchen located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser at east wall in the kitchen located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of uncovered electrical panel with exposed wires at north wall in the private hallway located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood door trims, jambs, header and door at north wall in the private hallway located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east at south located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood window interior trims,header,jambs, stool,and apron at east wall in the 1st room from east at south located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood window interior trims,header,jambs, stool,and apron at first window at south wall in the 1st room from east at south located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood window interior trims,header,jambs, stool,and apron at 2nd window at south wall in the 1st room from east at south located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation heat radiator and riser at east wall in the 1st room from east at south located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood parquet floor in the 1st room from east at south located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood door trims, jambs, header and door at south wall in the private hallway located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - BHazardous
Replace the broken or defective water closet in the bathroom located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood window interior trims, header,jambs,stool,and appron at east wall in the kitchen located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 10d1, 10th story, 1st apartment from east at south
Oct 15, 2024 · Apt 10D1
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at building entrance door at public hall, 1st story
Jul 10, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at vestibule door at public hall, 1st story
Jul 10, 2024
Closed — Violation closed - ANon-hazardous
Refit door in the entrance located at apt 6a1, 6th story, 1st apartment from south at west
Jun 8, 2015 · Apt 6A1
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors , in the entrance located at apt 6a1, 6th story, 1st apartment from south at west
Jun 8, 2015 · Apt 6A1
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective wire glass in upper and lower sashes of window at public hall, 1st story
Jun 8, 2015
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors in the entrance located at apt 2a1, 2nd story, 1st apartment from south at west
May 18, 2010 · Apt 2A1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt ph, 13th story, 1st apartment from south at west
Sep 12, 2008 · Apt PH
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... mildew at the north wall (2 sq ft.) in the kitchen located at apt ph, 13th story, 1st apartment from south at west
Sep 12, 2008 · Apt PH
Open — Nov sent out - BHazardous
Properly secure the loose ceiling light fixture in the kitchen located at apt ph, 13th story, 1st apartment from south at west
Sep 12, 2008 · Apt PH
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the wash basin in the bathroom located at apt ph, 13th story, 1st apartment from south at west
Sep 12, 2008 · Apt PH
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall at the drain pipe of wash basin in the bathroom located at apt ph, 13th story, 1st apartment from south at west
Sep 12, 2008 · Apt PH
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north , section at west
Sep 5, 2008 · Apt 5B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north
Sep 5, 2008 · Apt 1F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north
Sep 5, 2008 · Apt 1F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2a, 2nd story, 4th apartment from east at south
Sep 5, 2008 · Apt 2A
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2a, 2nd story, 4th apartment from east at south
Sep 5, 2008 · Apt 2A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 7b1, 7th story, 1st apartment from west at north
Sep 5, 2008 · Apt 7B1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 7b1, 7th story, 1st apartment from west at north
Sep 5, 2008 · Apt 7B1
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner installed at lower sash window obstructed of egress to fire escape located at apt 7b1, 7th story, 1st apartment from west at north
Sep 5, 2008 · Apt 7B1
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 9b, 9th story, 1st apartment from south at west
Sep 5, 2008 · Apt 9B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 9b, 9th story, 1st apartment from south at west
Sep 5, 2008 · Apt 9B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 11c1, 11th story, 1st apartment from south at west , section at southwest
Sep 5, 2008 · Apt 11C1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 11c1, 11th story, 1st apartment from south at west , section at southwest
Sep 5, 2008 · Apt 11C1
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 10b, 10th story, 1st apartment from south at west
Sep 5, 2008 · Apt 10B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 10b, 10th story, 1st apartment from south at west
Sep 5, 2008 · Apt 10B
Open — Nov sent out
DOB building violations · 47
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 14, 2014
Vw*-violation - work w/o permit dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 29, 2014
Dob violation - dismissed
Show 37 more ↓
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
This pvt replaces pvt 475788
May 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2012
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 15, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 15, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 15, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Plumbing none
P-plumbing none
Nov 14, 2007
Dob violation - dismissed - Plumbing none
P-plumbing none
Nov 14, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 29, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 29, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 29, 2006
Dob violation - resolved - Elevator elevatorrequired
1p8972
Apr 2, 2003
Dob violation - resolved - Elevator elevatorrequired
1p8974
Apr 2, 2003
Dob violation - resolved - Elevator elevatorrequired
1p8973
Apr 2, 2003
Dob violation - resolved - Elevator elevatorrequired
1p8972
Dec 9, 2002
Dob violation - resolved - Elevator elevatorrequired
1p8973
Dec 9, 2002
Dob violation - resolved - Elevator elevatorrequired
1p8974
Dec 9, 2002
Dob violation - resolved - Construction other optional
C-construction other optional
Jun 28, 1999
Vpw-violation unserved ecb-work without permit-active - Construction other optional
C-construction other optional
Jun 28, 1999
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatorrequired
(74)overhead door
Oct 19, 1989
Dob violation - resolved - Elevator elevatorrequired
(74)overhead door
Oct 19, 1989
Dob violation - resolved - Elevator elevatorrequired
(73)restore service
Oct 19, 1989
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 6, 1988
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 6, 1988
Dob violation - resolved - Elevator elevatorrequired
(51) cover all holes in shaftway walls
Sep 6, 1988
Dob violation - resolved
ECB violations · 32
- Class - 2
Failure to institute and maintain safety measures.at time of inspection on 13 story active job sit responding to complaint on construction equipment jersey barrier on school property with no safety measures in
Sep 13, 2021 · Penalty $5,000
Resolve - Class - 1
3301.1.2 failure to maintain safety measures. at time of inspection on 13 story active job site facade work taking place observed construction equipment jersey barrir and chinging fence on school property no ac
Sep 13, 2021
Resolve - Class - 1
28-401.19(6)master plumber displayed negligence,incompetence,lack of knowledge and or a disregard of this code and related laws and rules. on 7/26/2017,the department generated a report and learned that in ap
Jul 11, 2017
Resolve - Class - 2
Electrical work w/o a permit. apt #10d1 kitchen: branch circuit wiring21 receptacles outlets. "not on file" rmdy: obtain permit.
Nov 14, 2016 · Penalty $800
Resolve - Class - 2
Failure to install ground-fault circuit interruptor (gfci) protection as required. apt #10d1 kitchen: no gfci provided. "please note" this is not a final inspection!! rmdy: install gfci protection.
Nov 14, 2016 · Penalty $2,400
Resolve - Class - 3
18b.48b.50a.50b 50a install proper flue pipe support threaded rod w/ kindoof channel 50b condensate tank gauge plass leaking
Mar 18, 2009
Resolve - Non-hazardous
Failure to provide a sysytem of automatic sprinklers where required upon inspection witness commmercial dryer in laundry room with no automatic sprinklers 4 commercial dryers are installed in cellar. remedy:
Nov 14, 2007 · Penalty $2,500
Resolve - Non-hazardous
Use or installation of plumbing materials or equipment which do not comply with rs-16 upon inspection for gas test in cellar witness 4 commercial dryers with flex connectors and washer machines connected with
Nov 14, 2007 · Penalty $2,500
Active - Non-hazardous
85bb05,86bb05,83x16,55o02,66o02,36t07,36o02,51o02,85,86bb05,55o02- hoist machine,oiled,fix,repair,seal clean.66o02-clean pit.83x16-returndevice to service for proper inspection.36t07 overhead door unlabeled
Aug 13, 2007
Resolve - Non-hazardous
39m07,55o02,36t07,86bb05,66o02,36o02,55b09,51o02,39m07-provide fire extinguisher in m/r.-55o02-hoist machine oiled fix seal repair clean.36t07- provide label on door over head and lock. 86bb05- 2 yr tag expired
Aug 13, 2007
Resolve
Show 22 more ↓
- Non-hazardous
86bb5/39b7/55o2/36d6/66o2/36t7/.86-2yr expired 3/07 perform & file test.39-provide better lite for safety precaution.55-hoist machine oiled,dirty,fix,repair,seal,clean.36d6-overhead grill on fl,properly secure.
Aug 13, 2007
Resolve - Hazardous
Failure to maintain exterior bldg. south & west elev. shows flower pots sitting on window sills. north, west & south elev. shows blocks of wood under a/c units, improperly supports. remedy: make are safe remove
Apr 10, 2006
Resolve - Non-hazardous
B4a/18a/18b/24b/32a/44a/46b/50/50a/50b. 50- combustion leak around hand holes on fulton boiler (excess soot). 50a- missing discharge to a safe location for lower water gauge fixture. 50b- reverse lower rear blo
Feb 8, 2006
Resolve - Non-hazardous
18a,b.48a,b.50a.50b.fulton v.t. blr.,10hp,nb41749,oil-fired,1982.50a-defective damper element on flue pipe draftstat.50b-no discharge pipe on the safety valve.
Apr 13, 2004
Resolve - Non-hazardous
8a-49 8a-pertains to hand holes welding 2- 2nd valve in blowdown and water column drains to install.
Sep 4, 2001
Resolve - Non-hazardous
46h13 74m12 #74-m-12 replace cw to spring
Sep 15, 2000 · Penalty $350
Resolve - Non-hazardous
46h15 57o02
Sep 15, 2000 · Penalty $350
Resolve - Non-hazardous
5q,15l,17a,23u,49u,46u,75u,55x. vision glass, not self closing basement floor, all floors.
Oct 27, 1999 · Penalty $350
Resolve - Non-hazardous
18q,46u,49b,57o,75u. lobby.
Oct 27, 1999 · Penalty $350
Resolve - Non-hazardous
18d,46u,60m,75u. top floor.
Oct 27, 1999 · Penalty $350
Resolve - Non-hazardous
61i,47i. cease use of elevator unitl items is corrected and call 312- 8738 when car is ready to put in service.
Oct 26, 1999 · Penalty $500
Resolve - Non-hazardous
1`5l12, 31d11, 35o2, 35d11, 60m12, 49l13. 1st floor door panel. 31-wire under car. 35a wire in m. room 60-counterweight at buffer 49-reshackle
Nov 6, 1997 · Penalty $180
Resolve - Non-hazardous
49l,28l,46l.
Jan 9, 1996 · Penalty $200
Resolve - Non-hazardous
11q,50o,33o,73o.
Jan 9, 1996 · Penalty $200
Resolve - Non-hazardous
05l,11q,15#,18d,18q,28l,33r,33d,35o,46l,49l,40l,50y,50y,75t,73o, 15#- file application and obtain permit for roof door replacement 33r- overhead enclosure made by plywood for fire retardant material 33d- door o
Aug 20, 1993 · Penalty $550
Resolve - Non-hazardous
03i,11q,15l,16h,19x,21x,22d,37h,40l,46l,49l,50y,50y,57o,62m,73o,75t,03i-floor tiles 37h- contacts and carbons 62m-toe-guard
Aug 20, 1993 · Penalty $200
Resolve - Non-hazardous
28l,32i,30r,35o,40l,47h,49l,46l,75t, 28l- top set 32i- on hoistway 30r- all water pipes
Aug 20, 1993 · Penalty $200
Resolve - Non-hazardous
Failure to maintain- exterior exhaust system terminates at 2nd story roof, less than 10 feet from southeast window line. location dba (happy donuts). remedy: discontinue use forthwith. obtain a permit and appro
Feb 10, 1993 · Penalty $5,000
Resolve - Non-hazardous
Failure to maintain exterior exhaust system termates at 2nd story roofless than 10 feet from south/east window line. location dba-(happy d dba-(happy donuts). remedy: discontinue use forthwith. obtain a permit
Jun 2, 1992
Resolve - Non-hazardous
73x, (73) return to service so that proper inspection can be made
Feb 14, 1992 · Penalty $75
Resolve - Non-hazardous
Failure to maintain. exterior system terminates at 2nd story roof less than 10 feet from south east window. remedy: discontinue use forthwith. obtain a permit.
Mar 28, 1990 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain exterior exhaust system terimates at 2 sty roof less than 10 ft from south east window line location dba happy donuts remedy discontinue use forthwith obtain a permit and approvals for exten
Mar 7, 1989 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Mold
Jan 20, 2026 · Apt 4B
Close - Paint/plaster
Wall
Jan 20, 2026 · Apt 4B
Close - Paint/plaster
Ceiling
Jan 20, 2026 · Apt 4B
Close - Door/window
Door
Mar 17, 2025 · Apt 10D1
Close - Flooring/stairs
Floor
Aug 10, 2024 · Apt 10D1
Close - Appliance
Refrigerator
Aug 10, 2024 · Apt 10D1
Close - Appliance
Refrigerator
Jun 24, 2024 · Apt 10D1
Close - Flooring/stairs
Floor
Jun 14, 2024 · Apt 10D1
Close - Plumbing
Toilet
Jun 14, 2024 · Apt 10D1
Close - Heat/hot water
Apartment only
Jan 12, 2019 · Apt 3D
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Oct 18, 2018 · Apt 3D
Close - Paint/plaster
Door/frame
Jun 5, 2015 · Apt 6A1
Close - Flooring/stairs
Stairs
Jun 5, 2015 · Apt 6A1
Close - Paint/plaster
Wall
May 13, 2015 · Apt 6A1
Close - Paint/plaster
Door/frame
May 13, 2015 · Apt 6A1
Close - Heat/hot water
Entire building
Feb 15, 2015 · Apt 6E
Close - Heating
Heat related
Oct 12, 2012 · Apt 2A1
Close - Heating
Heat related
Oct 8, 2012 · Apt 2A1
Close - Heating
Heat related
Oct 21, 2011 · Apt 2A1
Close - Heating
Heat related
Oct 14, 2010 · Apt 2A1
Close - Heating
Heat related
May 19, 2010 · Apt 2A1
Close - Heating
Heat related
May 13, 2010 · Apt 2A1
Close - Heating
Heat related
May 12, 2010 · Apt 2A1
Close - Heating
Heat related
Dec 19, 2009 · Apt 2A1
Close - Heating
Heat related
Dec 13, 2009 · Apt 2A1
Close - Heating
Heat related
Nov 30, 2009 · Apt 2A1
Close - Heating
Heat related
Nov 13, 2009 · Apt 2A1
Close - Heating
Heat related
Nov 4, 2009 · Apt 2A1
Close - Heating
Heat related
Nov 2, 2009 · Apt 2A1
Close - Heating
Heat related
Nov 1, 2009 · Apt 2A1
Close - Heating
Heat related
Oct 19, 2009 · Apt 2A1
Close - Heating
Heat related
Oct 19, 2009 · Apt 2A1
Close - Heating
Heat related
Oct 16, 2009 · Apt 2A1
Close - Heating
Heat related
Oct 14, 2009 · Apt 2A1
Close - Heating
Heat related
Oct 13, 2009 · Apt 2A1
Close - Heating
Heat related
Oct 12, 2009 · Apt 2A1
Close - Heating
Heat related
Oct 18, 2008 · Apt 2A1
Close - Nonconst
Vermin
Jul 18, 2008 · Apt 6A1
Close - Heating
Heat related
Oct 28, 2007 · Apt 2A1
Close - Heating
Heat related
Oct 28, 2007 · Apt 2A1
Close - Heating
Heat related
Oct 26, 2007 · Apt 2A1
Close - Heating
Heat related
Nov 16, 2006 · Apt 9F
Close - Heating
Heat related
Nov 10, 2006 · Apt 9F
Close - Heating
Heat related
Nov 3, 2006 · Apt 9F
Close - Heating
Heat related
Oct 17, 2006 · Apt BLDG
Close - Heating
Heat related
Oct 21, 2005 · Apt 2A1
Close - Heating
Heat related
May 26, 2005 · Apt 2A1
Close - Heating
Heat related
Oct 17, 2004 · Apt 2A1
Close - Heating
Heat related
Oct 12, 2004 · Apt 2A1
Close - Heating
Heat related
Oct 6, 2003 · Apt 2A-1
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 27, 2026 | $2,900,000 | Coops - elevator apartments | — |
| May 6, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jan 21, 2026 | $597,500 | Coops - elevator apartments | — |
| Oct 27, 2025 | Non-market transfer | Coops - elevator apartments | — |
| Oct 7, 2025 | $784,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1910
- Floors
- 12
- Residential units
- 108
- Building area
- 121,922 ft²
- Lot area
- 12,614 ft²
- Zoning
- R9A
- Community board
- 107
- Council district
- 7
- Block / lot
- 1880 / 1
- Assessed value
- $12,874,950
- Landmark / historic district
- No
HPD registration #116879, last renewed Jul 18, 2025.
Questions about 2800 Broadway
Who owns 2800 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 255 W 108th St Corp.
Does 2800 Broadway have violations?
Yes. NYC HPD has recorded 61 housing violations at this property.
Is 2800 Broadway rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 6% of its 108 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2800 Broadway built?
City records list 1910 as the year it was built.
How many apartments are in 2800 Broadway?
It has 108 residential units and 112 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.