278 West 115 Street
Manhattan, NY 10026BBL 1-01830-0060Map
Owner of record: Fdb Management LLC
278 West 115 Street is a walk-up apartment building built in 1900 in Manhattan, 10026. It has 10 residential units across 4 floors. The owner of record is Fdb Management LLC. HPD has recorded 68 housing violations here, most recently on May 12, 2024. 35 of the 50 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 68
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 65
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 68
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
May 12, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from east at south
May 12, 2024 · Apt 4A
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2b, 1st story, 1st apartment from north at east
Jan 12, 2023 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2b, 1st story, 1st apartment from north at east
Jan 12, 2023 · Apt 2B
Closed — Violation dismissed - BHazardous
Replace the broken or defective water closet's tank cover in the bathroom located at apt 2b, 1st story, 1st apartment from north at east
Jan 12, 2023 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2b, 1st story, 1st apartment from north at east
Jan 12, 2023 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2b, 1st story, 1st apartment from north at east
Jan 12, 2023 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway located at apt 2b, 1st story, 1st apartment from north at east
Jan 12, 2023 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and west walls in the bathroom located at apt 2b, 1st story, 1st apartment from north at east
Jan 12, 2023 · Apt 2B
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Feb 18, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household material, etc. at public hall, 4th story
Nov 16, 2021
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycle, etc. at public hall, 3rd story
Nov 16, 2021
Open — Nov sent out - BHazardous
Replace with new the missing newel post cap at public hall stairs, 1st story
Nov 16, 2021
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycle, etc. at public hall, 1st story
Nov 16, 2021
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 10, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - ANon-hazardous
Refit slidng doors at north closet in the 6th room from north located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wash basin in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective wash basin mechanical stopper in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 5th room from north located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 6th room from north located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - BHazardous
Replace with new the broken or defective sink base cabinet in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - BHazardous
Replace with new the broken or defective water closet tank porcelain cover in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Apr 19, 2016
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. , 1st story
Apr 19, 2016
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing , 1st story
Apr 19, 2016
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Apr 19, 2016
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , missing , 1st story
Apr 19, 2016
Open — Nov sent out - ANon-hazardous
Replace with new the missing electric outlet safety caps at all stories , 1st story
Apr 19, 2016
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures , at gas range in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Closed — Violation closed - BHazardous
Replace the broken or defective bath tub in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Apr 19, 2016 · Apt 5A
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 2, 2015
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak at the ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the ceiling and the east wall in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall, east wall, north wall in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak at the ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out - BHazardous
Replace with new the broken or defective the door in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall, north wall in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak at the ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Feb 1, 2011 · Apt 2B
Open — Nov sent out
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 20, 1990
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 20, 1990
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Garbage/recycling storage
Jun 3, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
May 11, 2024 · Apt BLDG
Close - Water leak
Heavy flow
Jan 4, 2023 · Apt 2B
Close - Water leak
Slow leak
Jan 4, 2023 · Apt 2B
Close - Water leak
Damp spot
Jan 4, 2023 · Apt 2B
Close - Water leak
Slow leak
Dec 21, 2022 · Apt 2B
Close - Water leak
Damp spot
Dec 21, 2022 · Apt 2B
Close - Heat/hot water
Entire building
Nov 1, 2022 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Heavy flow
Nov 21, 2021 · Apt 3B
Close - General
Janitor/super
Nov 13, 2021 · Apt 5B
Close - Heat/hot water
Apartment only
Nov 13, 2021 · Apt 5B
Close - Heat/hot water
Entire building
Nov 5, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 19, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 19, 2021 · Apt BLDG
Close - General
Janitor/super
Oct 18, 2021 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Oct 18, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 7, 2019 · Apt 3A
Close - Heat/hot water
Apartment only
Dec 29, 2017 · Apt 3A
Close - General
Cabinet
Apr 11, 2016 · Apt 5A
Close - Flooring/stairs
Floor
Apr 11, 2016 · Apt 5A
Close - Paint/plaster
Wall
Apr 11, 2016 · Apt 5A
Close - Flooring/stairs
Floor
Apr 11, 2016 · Apt 5A
Close - Water leak
Heavy flow
Apr 11, 2016 · Apt 5A
Close - Door/window
Door
Apr 11, 2016 · Apt 5A
Close - Plumbing
Bathtub/shower
Apr 11, 2016 · Apt 5A
Close - Appliance
Electric/gas range
Apr 11, 2016 · Apt 5A
Close - Heating
Heat related
Jan 27, 2011 · Apt 4B
Close - Heating
Heat related
Jan 27, 2011 · Apt BLDG
Close - Heating
Heat related
Jan 22, 2011 · Apt BLDG
Close - General
Mold
Jan 19, 2011 · Apt 2B
Close - General
Mold
Jan 19, 2011 · Apt 2B
Close - General
Floor
Jan 19, 2011 · Apt 2B
Close - General
Floor
Jan 19, 2011 · Apt 2B
Close - Paint/plaster
Ceiling
Jan 19, 2011 · Apt 2B
Close - Paint/plaster
Wall
Jan 19, 2011 · Apt 2B
Close - Paint/plaster
Ceiling
Jan 19, 2011 · Apt 2B
Close - Paint/plaster
Wall
Jan 19, 2011 · Apt 2B
Close - Paint/plaster
Ceiling
Jan 19, 2011 · Apt 2B
Close - Paint/plaster
Ceiling
Jan 19, 2011 · Apt 2B
Close - Electric
Lighting
Nov 7, 2010 · Apt 2B
Close - Electric
Wiring
Nov 7, 2010 · Apt 2B
Close - Paint/plaster
Ceiling
Nov 7, 2010 · Apt 2B
Close - Plumbing
Water-leaks
Nov 7, 2010 · Apt 2B
Close - Plumbing
Water-leaks
Nov 7, 2010 · Apt 2B
Close - Heating
Heat related
Dec 22, 2009 · Apt 4A
Close - General
Floor
Jun 10, 2009 · Apt 3B
Close - Electric
Wiring
Mar 11, 2009 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 4
- Residential units
- 10
- Building area
- 7,539 ft²
- Lot area
- 2,523 ft²
- Zoning
- R7A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1830 / 60
- Assessed value
- $664,650
- Landmark / historic district
- No
HPD registration #133312, last renewed Aug 23, 2025.
Questions about 278 West 115 Street
Who owns 278 West 115 Street?
The owner of record in NYC Department of City Planning PLUTO data is Fdb Management LLC.
Does 278 West 115 Street have violations?
Yes. NYC HPD has recorded 68 housing violations at this property.
Is 278 West 115 Street rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 278 West 115 Street built?
City records list 1900 as the year it was built.
How many apartments are in 278 West 115 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.