1854 Adam C Powell Blvd
Manhattan, NY 10026BBL 1-01828-0030Map
Owner of record: Viclar Realty Corporation
1854 Adam C Powell Blvd is an elevator apartment building built in 1920 in Manhattan, 10026. It has 28 residential units across 7 floors. The owner of record is Viclar Realty Corporation. HPD has recorded 22 housing violations here, most recently on January 20, 2020. 1 of the 22 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 23
- ECB violations
- 14
- HPD complaints
- 36
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from east at south located at apt 1b, 1st story, 2nd apartment from south at west
Jan 20, 2020 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from east at south located at apt 1b, 1st story, 2nd apartment from south at west
Jan 20, 2020 · Apt 1B
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the 1st room from east at south located at apt 4a, 4th story, 2nd apartment from west at north
Jun 27, 2016 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4a, 4th story, 2nd apartment from west at north
May 16, 2016 · Apt 4A
Closed — Violation closed - BHazardous
Replace with new the broken or defective self-closing fireproof metal door in the entrance located at apt 4a, 4th story, 2nd apartment from west at north
May 16, 2016 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 4a, 4th story, 2nd apartment from west at north
May 16, 2016 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the kitchen located at apt 4a, 4th story, 2nd apartment from west at north
May 16, 2016 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and walls in the kitchen located at apt 4a, 4th story, 2nd apartment from west at north
May 16, 2016 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 4a, 4th story, 2nd apartment from west at north
May 16, 2016 · Apt 4A
Closed — Violation closed
Show 12 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective door frame in the 1st room from east at north located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing missing fork at north side of drop ladder at 1st fire escape from east, 2nd story
Sep 11, 2013
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate window guard installed in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening key poerated lock installed on door of room leading to the fire escape in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Sep 11, 2013 · Apt 5D
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate at window in the 3rd room from east at north located at apt 7c, 7th story, 2nd apartment from east at south
Nov 25, 2007 · Apt 7C
Open — Nov sent out
DOB building violations · 23
- Facade safety program facade required
Fisp-facade safety program facade required
Mar 2, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2014
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 12, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2010
Dob violation - resolved
Show 13 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2009
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 21, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2005
Dob violation - resolved - Elevator elevatorrequired
1p9586
Dec 16, 2002
Dob violation - resolved - Elevator elevatorrequired
1p9586
Oct 26, 2001
Dob violation - resolved - Elevator elevatorrequired
1p9586
Jan 10, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatorrequired
33) sky light 37 chain
May 17, 1990
Dob violation - resolved - Elevator elevatorrequired
18/cover, 40/cable, 63/worn shaft, 74/defection sheaves on baseme nt
Oct 30, 1989
Dob violation - resolved
ECB violations · 14
- Class - 2
52b12,68b07,56y13,60q03,26d06,25m07-52)reshackle drum to top of car hoist rope and apply tag in accordance to code. 68)provide mcp. 56)seal machine. 60)install light guard. 26)install chain or hinges to secure
Dec 20, 2018 · Penalty $312
Resolve - Class - 2
Failure to file acceptable amended cycle 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#806283. remedy: file acceptable report
Aug 1, 2018 · Penalty $1,250
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent. residential purposes. c of o# 20862 indicates bldg to be legally approved as a class 'a' multiple dwelling. now apt# 7c used/converted to transient us
Feb 21, 2018 · Penalty $800
Resolve - Class - 1
Sec: bc 907.2.8. failure to provide fire alarm system for transient use. class 'j'. rem: discontinue illegal occupancy.
Feb 21, 2018 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. failure to provide number of required means of egress for every flr per bc 1018.1 & 27-366 for transient use. rem: discontinue illegal occupancy.
Feb 21, 2018 · Penalty $1,200
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. lack of a system of automatic sprinkler where is required as per bc 903.2 & 27-954 for transient use. rem: discontinue illegal occupancy.
Feb 21, 2018 · Penalty $1,000
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Aug 24, 2014 · Penalty $800
Resolve - Class - 1
08v01,37m0740m07,70m07. 08v1-car out of level must be adjusted; 37,40,70m07-provide keys to overhead machine equipment,motor room and the pit.
Dec 13, 2013 · Penalty $1,000
Resolve - Class - 2
Fail to submit an acceptable sixth round technical report in compliance w/code provisions. periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules and regulations. re
Dec 26, 2008
Resolve - Non-hazardous
Cease uses. 08v01,16l01,66o02,83x10. cease use (08-v-01)adjust fl stops on down off level & 4 fl off level by 4". (16-l-01)adjusted 7 fl door check door slams (66-o-02)clean pit (83-x-10)return to service as
May 22, 2007 · Penalty $500
Active
Show 4 more ↓
- Non-hazardous
40d06 40) overhead wheelhouse room- door is without a functional locking mechanism.
Jun 20, 2005 · Penalty $180
Active - Non-hazardous
46h13,49h13,08j01,15l11.08-all fl.where needed.15-3fl door is slamming.
Nov 21, 2000
Resolve - Non-hazardous
17q,17r,46t,48t,49t,35r,30m,31q,30i,28h,. 17 with wire glass 35 gas pipes 30 access holes 30 at pit.
Oct 2, 1995 · Penalty $250
Resolve - Non-hazardous
118,17q,17r,40#,46t,48t,49t,36r. 17 with wire glass. 40 calibnate and seal.
Feb 28, 1994
Resolve
Complaints
- Unsanitary condition
Pests
Mar 29, 2023 · Apt 6C
Close - Electric
Lighting
Jan 17, 2020 · Apt 1B
Close - Unsanitary condition
Mold
Jan 17, 2020 · Apt 1B
Close - Paint/plaster
Wall
Jan 17, 2020 · Apt 1B
Close - Paint/plaster
Ceiling
Jan 17, 2020 · Apt 1B
Close - Water leak
Slow leak
Jan 17, 2020 · Apt 1B
Close - Door/window
Door
May 12, 2016 · Apt 4A
Close - Paint/plaster
Wall
May 12, 2016 · Apt 4A
Close - Flooring/stairs
Floor
May 12, 2016 · Apt 4A
Close - Electric
Outlet/switch
May 12, 2016 · Apt 4A
Close
Show 26 more ↓
- Plumbing
Bathtub/shower
May 12, 2016 · Apt 4A
Close - Plumbing
Bathtub/shower
May 12, 2016 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 17, 2015 · Apt 5D
Close - Heat/hot water
Apartment only
May 18, 2014 · Apt 5D
Close - Plumbing
Toilet
Sep 6, 2013 · Apt 5D
Close - Paint/plaster
Wall
Sep 6, 2013 · Apt 5D
Close - Nonconst
Vermin
Sep 6, 2013 · Apt 5D
Close - Nonconst
Vermin
Sep 6, 2013 · Apt 5D
Close - Paint/plaster
Wall
Sep 6, 2013 · Apt 5D
Close - General
Floor
Sep 6, 2013 · Apt 5D
Close - General
Doors
Sep 6, 2013 · Apt 5D
Close - General
Cabinet
Sep 6, 2013 · Apt 5D
Close - Paint/plaster
Wall
Sep 6, 2013 · Apt 5D
Close - Paint/plaster
Ceiling
Sep 6, 2013 · Apt 5D
Close - Heating
Heat related
Nov 29, 2012 · Apt 1A
Close - Heating
Heat related
Mar 13, 2010 · Apt 4A
Close - Paint/plaster
Ceiling
Nov 16, 2007 · Apt 7C
Close - Paint/plaster
Wall
Nov 16, 2007 · Apt 7C
Close - Paint/plaster
Wall
Nov 16, 2007 · Apt 7C
Close - Paint/plaster
Ceiling
Nov 16, 2007 · Apt 7C
Close - Heating
Heat related
Mar 20, 2007 · Apt BLDG
Close - Plumbing
Water-leaks
Jul 23, 2003 · Apt 2B
Close - General
Floor
Jul 23, 2003 · Apt 2B
Close - Paint/plaster
Wall
Jul 22, 2003 · Apt 4A
Close - Paint/plaster
Ceiling
Jul 22, 2003 · Apt 4A
Close - Paint/plaster
Ceiling
Jul 22, 2003 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1920
- Floors
- 7
- Residential units
- 28
- Building area
- 27,510 ft²
- Lot area
- 5,000 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1828 / 30
- Assessed value
- $1,079,550
- Landmark / historic district
- No
HPD registration #100769, last renewed Aug 24, 2025.
Questions about 1854 Adam C Powell Blvd
Who owns 1854 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Viclar Realty Corporation.
Does 1854 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 1854 Adam C Powell Blvd rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 57% of its 28 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1854 Adam C Powell Blvd built?
City records list 1920 as the year it was built.
How many apartments are in 1854 Adam C Powell Blvd?
It has 28 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.