1829 Adam C Powell Blvd
Manhattan, NY 10026BBL 1-01821-0004Map
Owner of record: Breco 1829seventh LLC
1829 Adam C Powell Blvd is a walk-up apartment building built in 1900 in Manhattan, 10026. It has 15 residential units across 5 floors. The owner of record is Breco 1829seventh LLC. HPD has recorded 139 housing violations here, most recently on September 15, 2026. 19 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 139
- DOB violations
- 4
- ECB violations
- 1
- HPD complaints
- 387
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 139
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective. in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Sep 15, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective. in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Sep 15, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 2nd bathroom from east located at apt 3b, 3rd story, 1st apartment from north at east
Sep 12, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at east wall in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3B
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4c, 4th story, 1st apartment from east at south
Aug 12, 2026 · Apt 4C
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3B
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 3b, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balances at lower window sash at 1st window from north at east in the 1st room from east at north located at apt 3b, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 3b, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from east located at apt 5b, 5th story, 1st apartment from north at east
Aug 12, 2026 · Apt 5B
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 5b, 5th story, 1st apartment from north at east
Aug 12, 2026 · Apt 5B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above the ceiling in the 3rd room from east located at apt 5b, 5th story, 1st apartment from north at east
Aug 12, 2026 · Apt 5B
Closed — Violation closed - BHazardous
Replace with new the missing upper wall cabinet doors at east wall in the kitchen located at apt 5a, 5th story, 1st apartment from west at north
Aug 12, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 5a, 5th story, 1st apartment from west at north
Aug 12, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective from building front to intercom panel at south wall in the private hallway located at apt 5a, 5th story, 1st apartment from west at north
Aug 12, 2026 · Apt 5A
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 4c, 4th story, 1st apartment from east at south
Aug 12, 2026 · Apt 4C
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 4c, 4th story, 1st apartment from east at south
Aug 12, 2026 · Apt 4C
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Aug 12, 2026 · Apt 5B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Aug 12, 2026 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Aug 12, 2026 · Apt 4C
Open — First no access to re- inspect violation - BHazardous
Replace with new the missing electrical outlet at east wall in the 4th room from east located at apt 4c, 4th story, 1st apartment from east at south
Aug 12, 2026 · Apt 4C
Open — Not complied with - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sqft at east wall and ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3B
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north, east walls and ceiling in the 1st room from east at north located at apt 3b, 3rd story, 1st apartment from north at east
Aug 12, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood floor in the foyer located at apt 5a, 5th story, 1st apartment from west at north
Aug 12, 2026 · Apt 5A
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from east located at apt 4c, 4th story, 1st apartment from east at south
Aug 12, 2026 · Apt 4C
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 4c, 4th story, 1st apartment from east at south
Aug 12, 2026 · Apt 4C
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at celing in the 1st bathroom from east located at apt 3b, 3rd story, 1st apartment from south at west
Jul 9, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Jul 9, 2026 · Apt 3B
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jul 1, 2026
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at 1st window from south at west in the 2nd room from east located at apt 5a, 5th story, 1st apartment from south at west
Jul 1, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 5b, 5th story, 1st apartment from north at east
Jun 28, 2026 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Jun 28, 2026 · Apt 5B
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Jun 28, 2026 · Apt 5B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Jun 28, 2026 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mortise lock at vestibule door , 1st story
Jun 23, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east
Jun 23, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at east wall and ceiling at public hall, 6th story
Jun 23, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 6th story
Jun 23, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at east
Jun 23, 2026 · Apt 5A
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 5a, 5th story, 1st apartment from west at north
Jun 17, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective defective latch set at bulkhead door at 1st public hall bulkhead from east at center, 6th story
Jun 9, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 5th story
Jun 9, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 5a, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling and east wall in the bathroom located at apt 5a, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at 1st public hall bulkhead from east at center, 6th story
Jun 9, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5a, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Repair the roof so that it will not leak at north wall at public hall, 5th story
Jun 9, 2026
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of push paddle alarm device at bulkhead door
May 13, 2026
Open — Violation will be reinspected - BHazardous
Provide operable handle at bulkhead door exterior to allow ingress from roof to bulkhead landing
May 13, 2026
Closed — Violation closed
DOB building violations · 4
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
Work without a permit stop work rehab stop work till permit is obtained from this dept
May 22, 1989
Resolve
Complaints
- General
Bell/buzzer/intercom
Sep 25, 2026 · Apt 5A
Close - Water leak
Slow leak
Aug 21, 2026 · Apt LOBBY
Close - Water leak
Slow leak
Aug 21, 2026 · Apt 5B
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 5A
Close - Plumbing
Radiator
Aug 10, 2026 · Apt 3A
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 3A
Close - Door/window
Door
Aug 10, 2026 · Apt 3A
Close - Paint/plaster
Ceiling
Aug 10, 2026 · Apt 3A
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Aug 10, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 3A
Close - Door/window
Window frame
Aug 10, 2026 · Apt 5B
Close - Electric
Outlet/switch
Aug 10, 2026 · Apt 5B
Close - Paint/plaster
Ceiling
Aug 10, 2026 · Apt 5B
Close - General
Cabinet
Aug 10, 2026 · Apt 5B
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt 5B
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt 5B
Close - Plumbing
Water supply
Aug 10, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 5B
Close - Water leak
Slow leak
Aug 10, 2026 · Apt 5B
Close - Appliance
Electric/gas range
Aug 10, 2026 · Apt 5B
Close - Plumbing
Basin/sink
Aug 10, 2026 · Apt 5B
Close - Door/window
Door
Aug 10, 2026 · Apt 5B
Close - Plumbing
Radiator
Aug 10, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Aug 10, 2026 · Apt 3B
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Aug 10, 2026 · Apt 3B
Close - Door/window
Window frame
Aug 10, 2026 · Apt 3B
Close - Door/window
Door
Aug 10, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 3B
Close - Electric
Outlet/switch
Aug 10, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 3B
Close - Door/window
Window frame
Aug 10, 2026 · Apt 4C
Close - Appliance
Electric/gas range
Aug 10, 2026 · Apt 4C
Close - General
Bell/buzzer/intercom
Aug 10, 2026 · Apt 5A
Close - Flooring/stairs
Floor
Aug 10, 2026 · Apt 5A
Close - Door/window
Door
Aug 10, 2026 · Apt 5A
Close - Flooring/stairs
Floor
Aug 10, 2026 · Apt 5A
Close - Plumbing
Water supply
Aug 10, 2026 · Apt 5A
Close - Plumbing
Bathtub/shower
Aug 10, 2026 · Apt 3B
Close - Plumbing
Toilet
Aug 10, 2026 · Apt 5A
Close - General
Cabinet
Aug 10, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Aug 10, 2026 · Apt 5A
Close - Unsanitary condition
Mold
Aug 10, 2026 · Apt 5A
Close - Plumbing
Water supply
Aug 10, 2026 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 5
- Residential units
- 15
- Building area
- 14,450 ft²
- Lot area
- 3,783 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1821 / 4
- Assessed value
- $336,150
- Landmark / historic district
- No
HPD registration #116491, last renewed Jun 30, 2025.
Questions about 1829 Adam C Powell Blvd
Who owns 1829 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Breco 1829seventh LLC.
Does 1829 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 139 housing violations at this property.
Is 1829 Adam C Powell Blvd rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 100% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1829 Adam C Powell Blvd built?
City records list 1900 as the year it was built.
How many apartments are in 1829 Adam C Powell Blvd?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.