2301 1 Avenue
Manhattan, NY 10035BBL 1-01795-0026Map
Owner of record: 2301 First Ave LP
2301 1 Avenue is a walk-up apartment building built in 1920 in Manhattan, 10035. It has 17 residential units across 6 floors. The owner of record is 2301 First Ave LP. HPD has recorded 48 housing violations here, most recently on September 4, 2026. 1 of the 48 most recent violations are still open. City tax records listed 22 rent-stabilized apartments here in 2024.
- HPD violations
- 48
- DOB violations
- 2
- ECB violations
- 5
- HPD complaints
- 109
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 48
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 4, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jul 27, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west walls in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jul 27, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jul 27, 2026 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Jan 31, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 31, 2026
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at the wash-basin in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Nov 26, 2024 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical wall outlet at north wall in the 1st room from north at west located at apt 1b, 1st story, 1st apartment from south at west
Jan 17, 2023 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective gfci electrical outlet at west wall reset/test button in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Jan 17, 2023 · Apt 1B
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of bell and buzzer intercom system from building front entrance to apt west wall in the foyer located at apt 1b, 1st story, 1st apartment from south at west
Jan 17, 2023 · Apt 1B
Closed — Violation dismissed
Show 38 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jan 17, 2023 · Apt 1B
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of garbage cans at public hall, 1st story
Mar 20, 2019
Closed — Violation closed - BHazardous
Replace with new the missing electrical outlet cover on the north wall in the bathroom located at apt 6c, 6th story, 1st apartment from north at east
Mar 20, 2019 · Apt 6C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, east wall in the bathroom located at apt 6c, 6th story, 1st apartment from north at east
Mar 20, 2019 · Apt 6C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 6c, 6th story, 1st apartment from north at east
Mar 20, 2019 · Apt 6C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 6c, 6th story, 1st apartment from north at east
Mar 20, 2019 · Apt 6C
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 6c, 6th story, 1st apartment from north at east
Mar 4, 2019 · Apt 6C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, ceiling in the bathroom located at apt 6c, 6th story, 1st apartment from north at east
Mar 4, 2019 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6c, 6th story, 1st apartment from north at east
Mar 4, 2019 · Apt 6C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer located at apt 6c, 6th story, 1st apartment from north at east
Mar 4, 2019 · Apt 6C
Closed — Violation closed - BHazardous
Replace with new the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south
Oct 25, 2018 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south
Oct 25, 2018 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south
Oct 25, 2018 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2a, 2nd story, 1st apartment from east at south
Oct 25, 2018 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 2a, 2nd story, 1st apartment from east at south
Oct 25, 2018 · Apt 2A
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of garbage receptacles stored at public hall, 1st story
Oct 25, 2018
Closed — Violation dismissed - ANon-hazardous
Provide place within the building for the storage of waste receptacles and disinfect same regularly.
Oct 25, 2018
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at the east wall at the bulkhead , 6th story
Oct 16, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall at the bulkhead , 6th story
Oct 16, 2018
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall, in the bathroom located at apt 1b, 1st story, apartment at west
Oct 6, 2016 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective glass pane lower sash at third window from north at east in the 1st room from east at south located at apt 4c, 4th story, 1st apartment from north at east
May 23, 2016 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective window lower sashes glass panes in the 1st room from east at north located at apt 4c, 4th story, 1st apartment from north at east
May 23, 2016 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
May 23, 2016 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
May 23, 2016 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperative in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
May 23, 2016 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 4c, 4th story, 1st apartment from north at east
May 23, 2016 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at walls and ceiling in the bathroom located at apt 4c, 4th story, 1st apartment from north at east
May 23, 2016 · Apt 4C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east at south, the 1st room from east at south, the kitchen , the foyer , the 1st room from east at north located at apt 4c, 4th story, 1st apartment from north at east
May 23, 2016 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 30, 2015
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of bedbugs located at apt 4b, 4th story, 1st apartment from south at west
May 22, 2015 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective glass at lower window sash at public hall, 1st story
Sep 8, 2012
Closed — Violation closed - BHazardous
Replace with new the broken or defective gasket at the refrigerater in the kitchen located at apt 5b, 5th story, 1st apartment from north at east
Aug 15, 2011 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair the broken or defective pilot lights at the burners at the stove in the kitchen located at apt 5b, 5th story, 1st apartment from north at east
Aug 15, 2011 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Aug 15, 2011 · Apt 5B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Aug 15, 2011 · Apt 5B
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Aug 15, 2011 · Apt 5B
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of garbage can and bags of garbage on the floor at public hall, 1st story
Dec 17, 2010
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 4b, 4th story, 1st apartment from west at north
Jan 18, 2009 · Apt 4B
Closed — Violation closed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39031361k issued on 10/30/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.occupancy contrary to th
Dec 29, 2020
Resolve - Class - 2
Work without a permit: noted: observed in cellar constructed partition walls creating a room underneath the staircase. the room has a 2nd room inside which appears to be a walk-in refrigerator with a wooden doo
Oct 30, 2020 · Penalty $625
Active - Class - 1
Occ. contrary to that allowed by the c of o or b.d. records: observed cellar with a room built under the staircase. a male was sleeping on the floor with a backpack and personal belongings. inside of room is a
Oct 30, 2020 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain,defects are:cracked plaster walls.location:411,417,419,212,239 cafeteria at windows auditorium,wall opposite 144 above door.remedy:do repairs.
Mar 26, 2001
Resolve - Non-hazardous
Failure to maintain:defects are,cracked plaster ceilings.location:227,402.remedy:do repairs.
Mar 26, 2001
Resolve
Complaints
- Appliance
Refrigerator
Aug 17, 2026 · Apt 2A
Open - Plumbing
Basin/sink
Aug 17, 2026 · Apt 2A
Open - Plumbing
Bathtub/shower
Aug 17, 2026 · Apt 2A
Open - Plumbing
Bathtub/shower
Jul 26, 2026 · Apt 2B
Close - General
Bell/buzzer/intercom
Jul 26, 2026 · Apt 2B
Close - Paint/plaster
Window/frame
Jul 26, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jul 26, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Jul 26, 2026 · Apt 2B
Close - Plumbing
Bathtub/shower
Jul 26, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 1B
Close - Unsanitary condition
Sewage
Jun 1, 2024 · Apt 2D
Close - Plumbing
Basin/sink
Oct 15, 2022 · Apt 2C
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Plumbing
Bathtub/shower
Sep 14, 2020 · Apt 2A
Close - Paint/plaster
Wall
Sep 14, 2020 · Apt 2A
Close - Door/window
Door
May 28, 2019 · Apt 6C
Close - General
Cabinet
Mar 18, 2019 · Apt 6C
Close - Electric
Outlet/switch
Mar 18, 2019 · Apt 6C
Close - Paint/plaster
Wall
Mar 18, 2019 · Apt 6C
Close - Water leak
Slow leak
Mar 4, 2019 · Apt 6C
Close - Heat/hot water
Apartment only
Mar 4, 2019 · Apt 6C
Close - Flooring/stairs
Floor
Oct 17, 2018 · Apt 2A
Close - Appliance
Refrigerator
Oct 17, 2018 · Apt 2A
Close - Appliance
Electric/gas range
Oct 17, 2018 · Apt 2A
Close - Appliance
Refrigerator
Jul 10, 2017 · Apt 3A
Close - Paint/plaster
Ceiling
May 18, 2016 · Apt 4C
Close - Flooring/stairs
Floor
May 18, 2016 · Apt 4C
Close - Unsanitary condition
Garbage/recycling storage
Jul 22, 2015 · Apt BLDG
Close - General
Mailbox
Jun 11, 2015 · Apt 4B
Close - Unsanitary condition
Pests
May 26, 2015 · Apt 4B
Close - Unsanitary condition
Pests
May 11, 2015 · Apt 4B
Close - Safety
Carbon monoxide detector
Mar 18, 2014 · Apt 4B
Close - Door/window
Door
Mar 18, 2014 · Apt 4B
Close - Plumbing
Shower-stall
May 14, 2013 · Apt 6C
Close - Heating
Heat related
Nov 1, 2011 · Apt 5B
Close - Heating
Heat related
Nov 1, 2011 · Apt 5B
Close - Plumbing
Water supply
Nov 1, 2011 · Apt 5B
Close - Plumbing
Water supply
Nov 1, 2011 · Apt 5B
Close - Heating
Heat related
Nov 1, 2011 · Apt 5B
Close - Appliance
Electric/gas range
Aug 9, 2011 · Apt 5B
Close - Appliance
Refrigerator
Aug 9, 2011 · Apt 5B
Close - Appliance
Electric/gas range
Jul 18, 2011 · Apt 5B
Close - Appliance
Refrigerator
Jul 18, 2011 · Apt 5B
Close - Heating
Heat related
Jan 7, 2011 · Apt 4B
Close - Heating
Heat related
Dec 29, 2010 · Apt 5A
Close - Heating
Heat related
Dec 15, 2010 · Apt BLDG
Close - Heating
Heat related
Dec 14, 2010 · Apt BLDG
Close - Nonconst
Vermin
Nov 8, 2010 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 17
- Building area
- 20,840 ft²
- Lot area
- 5,050 ft²
- Zoning
- R7X
- Community board
- 111
- Council district
- 8
- Block / lot
- 1795 / 26
- Assessed value
- $602,550
- Landmark / historic district
- No
HPD registration #110457, last renewed Oct 7, 2025.
Questions about 2301 1 Avenue
Who owns 2301 1 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2301 First Ave LP.
Does 2301 1 Avenue have violations?
Yes. NYC HPD has recorded 48 housing violations at this property.
Is 2301 1 Avenue rent stabilized?
NYC Department of Finance tax bills listed 22 rent-stabilized units here in 2024 (about 100% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2301 1 Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 2301 1 Avenue?
It has 17 residential units and 18 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.