243 East 123 Street
Manhattan, NY 10035BBL 1-01788-0018Map
Owner of record: Old Harlem Road, L.p.
243 East 123 Street is a walk-up apartment building built in 1900 in Manhattan, 10035. It has 10 residential units across 5 floors. The owner of record is Old Harlem Road, L.p.. HPD has recorded 220 housing violations here, most recently on August 3, 2026. 46 of the 50 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 220
- DOB violations
- 16
- ECB violations
- 8
- HPD complaints
- 93
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 220
- CImmediately hazardous
Properly repair or replace the broken or defective heavy duty mortise lock and its assemblies at building entrance door [ from street to vestibule ] , 1st story
Aug 3, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door [ from street to vestibule ] , 1st story
Aug 3, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 5b, 5th story, 1st apartment from east at south
Aug 3, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 5b, 5th story, 1st apartment from east at south
Aug 3, 2026 · Apt 5B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 5b, 5th story, 1st apartment from east at south
Aug 3, 2026 · Apt 5B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective missing and loose ceramic wall tiles at west wall in the bathroom located at apt 5b, 5th story, 1st apartment from east at south
Aug 3, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater tahn 30 sqft at ceiling and walls in the bathroom located at apt 5b, 5th story, 1st apartment from east at south
Aug 3, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective stucco at chimney located at roof
Aug 3, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective stucco at west exterior wall located at bulkhead located at roof
Aug 3, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete at south exterior foundation wall at located at south yard
Aug 3, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household items obstructing entrance leading to cellar located at building front yard
Jul 16, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective stucco at north exteiror wall located at north court yard
Jul 8, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule , 1st story
Jul 7, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jul 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jul 7, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and west wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Jul 7, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor ( rotted ) in the 2nd room from north at east located at apt 1a, 1st story, 1st apartment from west at north
Jul 7, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective latch at vestibule door , 1st story
Jul 7, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective latch at building entrance door , 1st story
Jul 7, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
Jul 7, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective base cabinet in the bathroom located at apt 3b, 3rd story, 1st apartment from east at south
Jun 30, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at waste line leaking under sink in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south
Jun 30, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceramic soap dish over bathtub at north wall in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Jun 30, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jun 17, 2026
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south
Jun 17, 2026 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jun 15, 2026
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Jun 15, 2026 · Apt 5A
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jun 15, 2026 · Apt 1A
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in the waste-line of the sink based vanity in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 11, 2026 · Apt 3A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective connection at the waste-pipe of the sink based vanity in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 11, 2026 · Apt 3A
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair or replace the broken or defective wood cabinet doors at the sink based vanity in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 11, 2026 · Apt 3A
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair or replace the broken or defective rotted wood bottom shelf at the sink based vanity in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 11, 2026 · Apt 3A
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 11, 2026 · Apt 3A
Open — First no access to re- inspect violation - ANon-hazardous
Cleanse to the satisfaction of this department the mold on the grout surfaces around the bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 11, 2026 · Apt 3A
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective porcelain glaze enamel at the bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 11, 2026 · Apt 3A
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair or replace the broken or defective latch set at the vestibule door at public hall, 1st story
Jun 10, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel reglaze at the bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Jun 10, 2026 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Jun 10, 2026 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Jun 10, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jun 10, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jun 9, 2026
Open — Not complied with - CImmediately hazardous
Remove all obstructions and repair all defects in waste line drain under wash basin sink in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 9, 2026 · Apt 3A
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 9, 2026 · Apt 3A
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 9, 2026 · Apt 3A
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Jun 9, 2026 · Apt 3A
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Jun 9, 2026 · Apt 5A
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jun 8, 2026
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Jun 8, 2026 · Apt 1B
Open — Violation will be reinspected - CImmediately hazardous
Properly repair with similar material the broken or defective water proofing stucco at entire rear cellar
Jun 3, 2026
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north at east located at apt 1a, 1st story, 1st apartment from west at north
Jun 3, 2026 · Apt 1A
Open — First no access to re- inspect violation
DOB building violations · 16
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 26, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 8
- Class - 2
Failure to comply with the commissioners order contained in summons/violation #35468005k issued on 02-04-20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01 comply with comissioner
Sep 23, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: at time of inspection i observed at exp#1 front facade in disrepair w/missing stucco at various location need to more repair. photo was taken.
Feb 4, 2020 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg in code compliant manner. noted: at time of inspection i observed at exp#1 facade in disrepair w/missing stucco at various areas need to make repair photo was taken. remedy: comply with
Dec 27, 2019 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg in code compliant manner. note: at exp#1 facade in disrepair w/missing stucco at various areas. remedy: repair & or replace.
Nov 9, 2019 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code compliant manner noted at time of inspection i observed tha the facade at exposure #1 was in state of dispair with section of parging missing at 3rd floor level and at th ce
Sep 23, 2019 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg in code compliant manner. noted: at time of inspection i observed that the facade at exp#1 was in state of disrepair w/section of parking missing at 3rd fl level & at cellar level need
Jul 2, 2019 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg in code compliant manner. noted: @ time of insp i observed that the facade @ exp. #1 was in state of disrepair withsection of parging missing @ 3rd fl level & @ cellar level need to mak
May 4, 2019 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg in code compliant manner. at the time of inspection it was oibserved that facade was in state of disrepair w/section of parging missing at 3rd fl level & at cellar level. remedy: repair
Feb 12, 2019 · Penalty $6,250
Active
Complaints
- Heat/hot water
Entire building
Jun 15, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Jun 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 9, 2026 · Apt 3A
Close - Plumbing
Basin/sink
Jun 9, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Jun 9, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Jun 9, 2026 · Apt 3A
Close - Plumbing
Bathtub/shower
Jun 9, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Jun 9, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Jun 5, 2026 · Apt 3A
Close - Water leak
Heavy flow
Jan 27, 2026 · Apt 5A
Close
Show 40 more ↓
- Door/window
Door
Jan 13, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Jan 13, 2026 · Apt 5A
Close - Door/window
Door
Jan 13, 2026 · Apt 5A
Close - Door/window
Door
Jan 13, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Jan 13, 2026 · Apt 5A
Close - Paint/plaster
Window/frame
Jan 13, 2026 · Apt 5A
Close - Door/window
Window frame
Nov 21, 2025 · Apt 3A
Close - Paint/plaster
Wall
Nov 21, 2025 · Apt 3A
Close - Plumbing
Bathtub/shower
Nov 21, 2025 · Apt 3A
Close - General
Bell/buzzer/intercom
Nov 21, 2025 · Apt 3A
Close - Paint/plaster
Wall
Nov 21, 2025 · Apt 3A
Close - General
Cabinet
Nov 21, 2025 · Apt 3A
Close - Plumbing
Water supply
Nov 21, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt 1B
Close - Paint/plaster
Wall
Sep 25, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Sep 2, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Aug 27, 2025 · Apt 3B
Close - Plumbing
Water supply
Aug 27, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Aug 25, 2025 · Apt 1B1
Close - Heat/hot water
Entire building
Aug 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 21, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Aug 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 13, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Aug 7, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Aug 7, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Aug 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 31, 2025 · Apt 5A
Close - General
Bell/buzzer/intercom
Jul 27, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Jul 27, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Jul 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 31, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Mar 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Feb 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt BLDG
Close - Door/window
Door
Nov 28, 2024 · Apt 5A
Close - Paint/plaster
Ceiling
Nov 28, 2024 · Apt 5A
Close - Paint/plaster
Wall
Nov 28, 2024 · Apt 5A
Close - Water leak
Heavy flow
Nov 28, 2024 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1900
- Floors
- 5
- Residential units
- 10
- Building area
- 10,125 ft²
- Lot area
- 2,725 ft²
- Zoning
- R7B
- Community board
- 111
- Council district
- 8
- Block / lot
- 1788 / 18
- Assessed value
- $341,100
- Landmark / historic district
- No
HPD registration #118692, last renewed Oct 28, 2025.
Questions about 243 East 123 Street
Who owns 243 East 123 Street?
The owner of record in NYC Department of City Planning PLUTO data is Old Harlem Road, L.p..
Does 243 East 123 Street have violations?
Yes. NYC HPD has recorded 220 housing violations at this property.
Is 243 East 123 Street rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 243 East 123 Street built?
City records list 1900 as the year it was built.
How many apartments are in 243 East 123 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.