231 East 123 Street

Manhattan, NY 10035BBL 1-01788-0013Map

Owner of record: Chondrite Reo (7) INC.

231 East 123 Street is an elevator apartment building built in 2018 in Manhattan, 10035. It has 11 residential units across 6 floors. The owner of record is Chondrite Reo (7) INC.. HPD has recorded 44 housing violations here, most recently on May 16, 2026. 25 of the 44 most recent violations are still open.

HPD violations
44
DOB violations
12
ECB violations
50
HPD complaints
46

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 16, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 44

  • C

    Provide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the public part of the building and on each floor of such building, where an owner must make a repair that may result in an interruption of essential services such as utilities(heat, hot water, gas, electricity, or elevator) that is expected to continue for more than two hours. sample notice available at www.nyc.gov/hpd or as provided in this notice of violation. gas leak notice missing at public hall, 1st story

    May 16, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    May 16, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 16, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    May 16, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing at public hall, 1st story

    May 16, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    May 16, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 16, 2026

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures no hot water supply in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east

    May 16, 2026 · Apt 2B

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures no cold water supply in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east

    May 16, 2026 · Apt 2B

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    May 16, 2026

    Open — Nov sent out
Show 34 more ↓
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the consisting of excersice treadmill, construction supplies cardboard boxes at basement

    Aug 29, 2025

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    Oct 19, 2021 · Apt 3B

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north

    Oct 19, 2021 · Apt 3B

    Closed — Violation dismissed
  • B

    § 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition newd building erectede and ocupied without valid sertificate of occupancy; 6 story 12 apt building erected

    Oct 6, 2021

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Oct 6, 2021 · Apt 2A

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Oct 6, 2021 · Apt 2A

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south

    Sep 7, 2021 · Apt 2A

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Sep 7, 2021 · Apt 2A

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Aug 25, 2021 · Apt 4A

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Aug 25, 2021 · Apt 4A

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Aug 6, 2021

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north

    Aug 6, 2021 · Apt 3B

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    Aug 6, 2021 · Apt 3B

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4a, 4th story, 1st apartment from east at south

    Aug 5, 2021 · Apt 4A

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires hanging from the ceiling .. at 1st public hall from north, 1st story

    Aug 3, 2021

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south

    Aug 3, 2021 · Apt 4A

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures no gas at the range in the kitchen located at apt 4a, 4th story, 1st apartment from east at south

    Aug 3, 2021 · Apt 4A

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 28, 2021

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Jul 28, 2021

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 28, 2021

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jul 28, 2021

    Open — Nov sent out
  • A

    File with this department a registration statement for building.

    Jul 28, 2021

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Jul 28, 2021

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 28, 2021

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south

    Jul 28, 2021 · Apt 3B

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story

    Jul 27, 2021 · Apt 4A

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room at basement

    Jul 27, 2021

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4a, 4th story, 1st apartment from east at south

    Jul 27, 2021 · Apt 4A

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 1, 2015

    Closed — Violation dismissed
  • A

    D26-20.08,20.09 adm code file certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations.

    Jan 20, 1982

    Closed — Violation closed
  • B

    D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes wood boxes 1st stories rear fire escapes.

    Jun 29, 1972

    Closed — Violation closed
  • A

    D26-20.01 adm code provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door all apts all stys.

    —

    Closed — Violation closed

DOB building violations · 12

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 22, 2025

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Aug 21, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Jul 30, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Jul 30, 2018

    Vp*-violation unserved ecb- dismissed
Show 2 more ↓
  • Construction other optional

    C-construction other optional

    Jul 30, 2018

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2017

    Dob violation - dismissed

ECB violations · 50

  • Class - 2

    No access. certificate of correction has not been obtained for class 1 occupancy contrary violation #39082072y issued on 3/23/2023 citing a 6 story building w/ 11 units occuppied with out obtaining c/o for nb j

    Oct 8, 2026 · Penalty $1,250

    Active
  • Class - 1

    Class 1:rts failure to maintain building in code compliant manner. upon inspection, the only device in the building is found to be out of service.a hazardous condition exists due to the inordinate amount of tim

    Jul 15, 2025 · Penalty $12,500

    Active
  • Class - 1

    Class 1 restore to service. entire device is shut down. need to repair and re-inspection required.

    Nov 27, 2024 · Penalty $6,250

    Active
  • Class - 1

    Rts class 1 continued. provide and post contact information for building superintendent and or management company for access to elevator machine room.

    May 8, 2024 · Penalty $12,500

    Active
  • Class - 1

    Class 2: perform and file cat 1 year test (expired)., provide maintenance log book for year 2023 (missing)., provide current elevtor company sticker on the main line., perform brake maintenance and provide brak

    Jun 16, 2023 · Penalty $12,500

    Active
  • Class - 2

    Class 2: expired cat 1. perform & file test with nycdob. provide evidence of a valid maintenance contract. provide sticker on mainline with elevator company information. provide updated maintenance log & make a

    Apr 3, 2023 · Penalty $3,125

    Active
  • Class - 2

    Failure to comply with commissioners orders to file a certificate of correction for ecb vio #39045572h issued 08/05/2021 with hearing date passed., file a certificate of correction

    Mar 23, 2023 · Penalty $3,125

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the certificate of occupancy or buildings dept records. noted 6 story building with 11 dwelling units is occupied without obtaining c/o for nb job #121193617. observed 2nd

    Mar 23, 2023 · Penalty $12,500

    Active
  • Class - 1

    Class 1: upon inspection found device to be out of service. restore to service repair immediately as per 1rcny 11-02. contact nycdob at [email protected] for reinspection.

    Mar 7, 2023 · Penalty $6,250

    Active
  • Class - 1

    Restore to service so a full inspection can be made by this department.

    Sep 1, 2022 · Penalty $12,500

    Active
Show 40 more ↓
  • Class - 1

    97/x/17 class 1 restore to service for proper inspection by d/o/b.

    Apr 14, 2022 · Penalty $6,250

    Active
  • Class - 1

    Found elevator out of service. main mother pc board and all fuses are missing/removed from the elevator controller at the elevator machine room. restore to service.

    Sep 16, 2021 · Penalty $6,250

    Active
  • Class - 2

    Altered/changed building occupied without a valid certificate of occupancy as per 28-118.3.1 - 28-118.3.2: upon inspection observed newly constructed building under active permit 121193617. observed mail, packa

    Aug 5, 2021 · Penalty $6,250

    Active
  • Class - 2

    Expired fence permit at time of inspection i observed th ejobsite fence in place at exposure 1& 2 upon review on bis & dob now there were no updated or removed fence tranfile most recent fence permit had expire

    Dec 11, 2019 · Penalty $625

    Active
  • Class - 2

    Sidewlak shed(maintenance) at time of inspection i observed a heavy duty sidewlak shed in place at epxosure upon inspectionof the sidewalk shed i observed excess debris and maternal on the sidewlak shed contrar

    Dec 11, 2019 · Penalty $1,250

    Active
  • Class - 2

    During an energy code compliance inspection at job site with permit number 121193617, i observed that all windows on all floors have a u-factor of 0.45 as against 0.25 indicated on the window schedule (drawing

    Apr 10, 2019 · Penalty $2,000

    Active
  • Class - 2

    Pedestrian protection does not meet code specs.noted;at time of inspection observed open gap above sidewalk construction fence missing netting recurring conditions aggravated per 1rcny 102-01(f)recurring summon

    Mar 12, 2019

    Resolve
  • Class - 2

    Bc3314.1/partial swo issued for supported scaffold.supported scaffold does not meet code spec recurring condition aggravated 1 per 1rcny 102-01(f)recurring summons #3537755(nat 113 lenox ave 3-11-19 rec noted:a

    Mar 12, 2019

    Resolve
  • Class - 2

    Failure to provide approved/acceptable construction documents at job site at time of inspection.nb:job #121193617. at time of an energy cod e compliance inspection, i observed that there were no complete dob ap

    Feb 25, 2019 · Penalty $312

    Active
  • Class - 1

    Failure to provide osha training.at the time of my inspection or a 6 story nb active josite upon requesting for osha card worker stated i did not have one,permit holding failed to ensure each construction worke

    Jan 23, 2019

    Resolve
  • Class - 1

    Failure to provide osha training.at time of insp of a 6 story nb,active jobsite,upon requesting for osha cards,worker stated he did not haveone.owner failed to ensure each const worker successfully completed th

    Jan 23, 2019

    Resolve
  • Class - 1

    Failure to safeguard public property affected by construction operations at exposure 2 a 2" x 10" x 8' wood plank fell off scaffold to grade. remedy: safeguard public and property.

    Dec 22, 2018 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to safe guard all persons and property affected by construction operaton as noted @ time of my inspection of an active 6 sty building observed all the workers not waering p.p.e (hand hatt) as required

    Dec 13, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Bc 3301.13.12.competent person:as noted @ the time of my inspection i observed that no super. or competent person was @ site when enquired. workers working on the roof varies,floors of a 6 sty building.failure

    Dec 13, 2018

    Resolve
  • Class - 2

    No design drawing for rope and pulley system.at the time of inspectionof the proposed 6 story building,observed a pulley system.at expo 3 onthe pipe scaffold.upon this observation requested the design drawing f

    Sep 5, 2018

    Resolve
  • Class - 1

    Failure to safeguard pedestrian & vehicular traffic.at the time of inspection of the proposed 6 story building,i observed delivery operations without adequate safeguards for vehicular or pedestrian traffic.ther

    Sep 5, 2018 · Penalty $10,000

    Resolve
  • Class - 2

    Construction superintendent fails to adquately maintain site logs.at time of inspection of new 6 story building under construction at roof level active job site, upon request for the construction superintenden

    Aug 28, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain adequate means of egress/ingress.at time of inspection of a 6 story new building under construction at roof level.active job site with workers (6) working at roof level,i reserved that there

    Aug 28, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    3308.5-failure to maintain/institute vertical sfatey netting system as required.at time of inspection of a 6 story new building under construction.at roof level,active job site i observed that there were in ver

    Aug 28, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3307.6.5.7 no installation report at time of inspection i observed supported pipe scaffold installed on sidewalk shed at exp#1. upon request for sidewalk shed installation report none was provided or made

    Aug 21, 2018

    Resolve
  • Class - 2

    Sec. 3307.6.5.10.1 sidewalk shed daily inspection at time of inspection i observed sidewalk shed installed along perimeter at exp#1. upon request for daily inspection report none was provided or made available.

    Aug 21, 2018

    Resolve
  • Class - 1

    Guardrail missing, inadequate. at time of inspection of a 6 story building under construction at 4th fl level. active job site, i observed that there were missing guardrail systems @ exp #3 at 4th fl level crea

    Jul 30, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3309.1 failure to provide adequate overhead protection @ driveway exp #2. at time of inspection of an active job site at 4th fl level, i observed that there was inadequate overhead protection provided at exp

    Jul 30, 2018 · Penalty $625

    Resolve
  • Class - 1

    Failure to have competent person present at job site as required. at time of inspection of a 6 story building under construction at 4th fl level, active job site. upon request for the competent person of this a

    Jul 30, 2018 · Penalty $625

    Resolve
  • Class - 1

    Construction superintendent fails to provide jobsite logs as required. at time of inspection of a 6 story building under construction, active job site upon request for the construction superintendent daily logs

    Jul 30, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3301.13.1 failure to provide adequate site safety plans by local law 81 of 2017. at time of inspection of a new 6 sty bldg under construction at 3rd fl level,active job site,upon request for the ssp by loc

    May 24, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operation-no overhead protection. at time of inspection of a 6 sty new bldg at 3rd fl lebvel,active job site,i observed that there were no

    May 24, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. attime of inspection of a new bldg under construction at 3rd fl level. active job site,i observed that the stairs at 2nd fl level consisted of

    May 24, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide adequate means of egress/ingress at 3rd fl level. at time of inspection of a 6 sty new bldg under construction at 3rd fl level,active job site,i observed that there were no means of egress/in

    May 24, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to provide covers fir holes/openings. at time of inspection ofa new bldg under construction at 3rd fl level,active job site,i observed a large opening measures 6'-0"x3'6"wide uncovered at 1st fl level

    May 24, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to institute & maintain safety equipment measures or temporaryconstruction-no guardrails. at time of inspection of a new bldg under construction at 3rd fl level,active job site,i observed a worker worki

    May 24, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failurer to post"no smoking signs"at construction/demolition site as per fire code. at time of inspection of a new bldg under construction at 3rd fl level,active job site,i observed that there were no-"no smoki

    May 24, 2018

    Resolve
  • Class - 1

    Failure to designate & or have construction superintendent present at site as required. at the time of my inspection of a new 6 sty bldg at foundation level,construction work in progress. upon request for desig

    Apr 5, 2018 · Penalty $625

    Resolve
  • Class - 2

    Sec. 3301-02(d) logs at the time of my inspection of a new 6 sty bldg,foundation level,construction work in progress. upon request for construction superintendent log as required none was provided at the time

    Apr 5, 2018

    Resolve
  • Class - 1

    Guardrails. at the time of my inspection of a new 6 sty bldg at foundation level,construction work in progress. i observed that there were no guardrails provided at exp#1 where the depth at ground level to foun

    Apr 5, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3301.1.2 failure to comply w/nyc code genral(storage). at the time of my inspection of an active job site at foundation level,construction work in progress. i observed 2 compressed flammable gas tanks not

    Apr 5, 2018

    Resolve
  • Class - 1

    Sec. 3303.4.1.1 maintenance of sidewalk. at time of inspection noted at exp#1 gate entrance of job site,sidewalk severly damaged cracked by the travel of equipment in & out of job site posing a(potation)hazard

    Jul 3, 2017

    Resolve
  • Class - 2

    Failure to provide viewing panels(fence). at time of inspection noted @ exp#1 of job site fence,that there was no viewing panels provided as per code requirements. remedy: comply w/code provide viewing panels.

    Jul 3, 2017 · Penalty $2,000

    Resolve
  • Class - 2

    Construction sign/project information panel not provided. at time of inspection noted that the job site fence did not have the required construction sign w/the contractors information & 311(no bar)in case of

    Jul 3, 2017 · Penalty $2,000

    Resolve
  • Class - 1

    Sec. 3309.9 failure to water proof adjoining wall during demolition operations. at time of inspection noted @ exp#2 of job site & exp#3 thatthe adjoining walls where not weather proofed as per code requirements

    Jul 3, 2017 · Penalty $4,000

    Resolve

Complaints

  • Electric

    Power outage

    Aug 11, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    May 16, 2026 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    May 16, 2026 · Apt 1A

    Close
  • Plumbing

    Water supply

    May 16, 2026 · Apt 2B

    Close
  • Plumbing

    Water supply

    May 16, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    May 16, 2026 · Apt 2B

    Close
  • General

    Signage missing

    May 16, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    May 15, 2026 · Apt 2B

    Close
  • Plumbing

    Water supply

    May 15, 2026 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Mar 24, 2026 · Apt 1B

    Open
Show 36 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Jun 2, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 2, 2025 · Apt 1B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 2, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 30, 2025 · Apt BLDG

    Close
  • Door/window

    Door

    May 7, 2025 · Apt 2B

    Close
  • Door/window

    Door

    May 7, 2025 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    May 7, 2025 · Apt 1B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 20, 2023 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    May 21, 2023 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Apr 15, 2023 · Apt 1B

    Close
  • General

    Cooking gas

    Oct 24, 2021 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Oct 24, 2021 · Apt 3B

    Close
  • General

    Cooking gas

    Oct 18, 2021 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2021 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Oct 5, 2021 · Apt 3B

    Close
  • General

    Cooking gas

    Sep 1, 2021 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Sep 1, 2021 · Apt 2A

    Close
  • General

    Cooking gas

    Aug 22, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 22, 2021 · Apt BLDG

    Close
  • General

    Cooking gas

    Aug 6, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 6, 2021 · Apt BLDG

    Close
  • General

    Cooking gas

    Aug 5, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 5, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 3, 2021 · Apt BLDG

    Close
  • General

    Cooking gas

    Aug 3, 2021 · Apt BLDG

    Close
  • General

    Cooking gas

    Aug 2, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 28, 2021 · Apt 3B

    Close
  • General

    Cooking gas

    Jul 28, 2021 · Apt 3B

    Close
  • General

    Cooking gas

    Jul 26, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 26, 2021 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jul 26, 2021 · Apt BLDG

    Close
  • General

    Cooking gas

    Jul 26, 2021 · Apt BLDG

    Close
  • Heating

    Heat related

    Apr 27, 2012 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Apr 27, 2012 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Apr 27, 2012 · Apt 2

    Close
  • Heating

    Heat related

    Apr 27, 2012 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
2018
Floors
6
Residential units
11
Building area
11,576 ft²
Lot area
2,523 ft²
Zoning
R7B
Community board
111
Council district
8
Block / lot
1788 / 13
Assessed value
$1,760,400
Landmark / historic district
No

HPD registration #135989, last renewed Jan 10, 2017.

Questions about 231 East 123 Street

Who owns 231 East 123 Street?

The owner of record in NYC Department of City Planning PLUTO data is Chondrite Reo (7) INC..

Does 231 East 123 Street have violations?

Yes. NYC HPD has recorded 44 housing violations at this property.

Is 231 East 123 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 231 East 123 Street built?

City records list 2018 as the year it was built.

How many apartments are in 231 East 123 Street?

It has 11 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.