212 East 122 Street
Manhattan, NY 10035BBL 1-01786-0042Map
Owner of record: 122 Realty (2012) LLC
212 East 122 Street is a walk-up apartment building built in 1920 in Manhattan, 10035. It has 33 residential units across 6 floors. The owner of record is 122 Realty (2012) LLC. HPD has recorded 867 housing violations here, most recently on August 25, 2026. 23 of the 50 most recent violations are still open. City tax records listed 25 rent-stabilized apartments here in 2024.
- HPD violations
- 867
- DOB violations
- 18
- ECB violations
- 25
- HPD complaints
- 2,822
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 867
- BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Aug 25, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Aug 1, 2026 · Apt 3C
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and west wall at vestibule hall to public hall , 1st story
Aug 1, 2026
Open — Nov certified on time - BHazardous
Replace with new the missing upper escutcheon plate at heat riser pipe in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Aug 1, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and west wall at building vestibule , 1st story
Aug 1, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall at public hall stairs, 3rd story
Aug 1, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall at public hall stairs, 3rd story
Aug 1, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall at vestibule hall to public hall , 1st story
Aug 1, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall at public hall stairs, 3rd story
Aug 1, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, north and west walls in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Aug 1, 2026 · Apt 3C
Open — Civ14 mailed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and west walls in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Aug 1, 2026 · Apt 3C
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective fire escape window first window from east at south counter balance at lower window sash in the 3rd room from north located at apt 4c, 4th story, 1st apartment from south at west
Jul 25, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 4c, 4th story, 1st apartment from south at west
Jul 25, 2026 · Apt 4C
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from south at west
Jul 25, 2026 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from south at west
Jul 25, 2026 · Apt 4C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Jul 20, 2026 · Apt 3C
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from south at west
Jul 20, 2026 · Apt 3C
Open — Defect letter issued - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall and the north wall in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Jul 20, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceilings in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Jul 20, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the 3rd room from north located at apt 3c, 3rd story, 1st apartment from south at west
Jul 20, 2026 · Apt 3C
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 4c, 4th story, 1st apartment from south at west
Jul 9, 2026 · Apt 4C
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective fire escape window lower sash spring balances in the 3rd room from north located at apt 4c, 4th story, 1st apartment from south at west
Jul 9, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from south at west
Jul 9, 2026 · Apt 4C
Open — Civ14 mailed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items on 6th sty. balcony at 1st. stack from east at building front at fire escape
Jul 8, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the 2nd room from north at east, the bathroom , the kitchen located at apt 4c, 4th story, 1st apartment from south at west
May 28, 2026 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
May 28, 2026 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
May 28, 2026 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
May 28, 2026 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 4c, 4th story, 1st apartment from south at west
May 28, 2026 · Apt 4C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling, east and west walls and 1st window frame from west at north wall in the bathroom located at apt 4c, 4th story, 1st apartment from south at west
May 28, 2026 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from south at west
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 4d, 4th story, 2nd apartment from south at west
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north, the 2nd room from north at east, the kitchen located at apt 4d, 4th story, 2nd apartment from south at west
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from south at west
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4d, 4th story, 2nd apartment from south at west
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to west yard at public hall, 1st story
Nov 29, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6e, 6th story, 1st apartment from west at north
May 2, 2024 · Apt 6E
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6e, 6th story, 1st apartment from west at north
May 2, 2024 · Apt 6E
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6e, 6th story, 1st apartment from west at north
May 2, 2024 · Apt 6E
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from east at south
Nov 15, 2023 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south
Nov 15, 2023 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceremic floor tiles in the bathroom located at apt 4b, 4th story, 1st apartment from east at south
Nov 15, 2023 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the west and south walls at public hall stairs, 5th story
Aug 7, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the west and south walls at public hall stairs, 5th story
Aug 7, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the west wall at 1st public hall bulkhead from east at south, 6th story
Aug 7, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at the west wall at 1st public hall bulkhead from east at south, 6th story
Aug 7, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4e, 4th story, 1st apartment from west at north
Apr 5, 2023 · Apt 4E
Closed — Violation dismissed
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 26, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 26, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 1, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 9, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Electric signs none
Es-electric signs none
Jun 10, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Construction other optional
C-construction other optional
Jan 23, 1989
Dob violation - active - Construction other optional
C-construction other optional
Jan 23, 1989
Dob violation - active - Construction other optional
C-construction other optional
Jan 23, 1989
Dob violation - active - Construction other optional
C-construction other optional
Jan 23, 1989
Dob violation - active
ECB violations · 25
- Class - 2
No access. certificate of correction has not been obtained for class 1 occupancy contrary violation #39164840r issued on 10/25/2025 for an observed cellar area with arranged tables and seating for patrons socia
Oct 6, 2026 · Penalty $1,250
Active - Class - 2
Certificate of correction not obtained for class 1 failure to maintain violation # 39164841z issued 10/25/2025 for 1st floor and cellar level, electrical wires, junction boxes, multiple hookahs with open flame
Oct 6, 2026 · Penalty $1,250
Active - Class - 1
At time of inspection observed at cellar level area set up and arranged for patrons with tables and seating areas with no second means of egress present. vacate cellar area below "pink tree cafe and social club
Oct 25, 2025 · Penalty $2,500
Active - Class - 1
At time of inspection observed at 1st floor and cellar levels, exposed electrical wires, open junction boxes, multiple hookahs w/open flame and main electrical panel exposed., repair and/replace
Oct 25, 2025 · Penalty $2,500
Active - Class - 2
At time of inspection observed full height partitions creating additional areas at 1st floor level. also full height partitions creating 2 piece bathroom at cellar level., obtain all permits
Oct 25, 2025 · Penalty $1,250
Active - Class - 2
Work without permit; noted building observed having installed water and waste lines for bathroom with toilet and kitchen sink on ground floor toward the rear of the building., obtain all permits
Jul 28, 2025 · Penalty $1,250
Active - Class - 2
Work without permit; noted on ground floor building observed having erected multiple sheetrock partitions to create additional space for kitchen, restroom and ceilings., obtain all permits
Jul 28, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. noted; at time of inspection building observed at ground floor level covering multiple partitions with flammable floral material decoration causing potenti
Jul 28, 2025
Resolve - Class - 2
Work without permit; noted ground floor building observed having level having installed additional 110-volt electrical lines for lights, switches, appliances outlets, and 220-volt line for stove., obtain all pe
Jul 28, 2025 · Penalty $625
Active - Class - 2
Permanent dwelling used/converted for other than permanent purposes. dob records indicate building to be legally approved as a class "a" multi dwelling. now apt#2a used/converted to transient use. noted:apt 2a
Mar 8, 2019 · Penalty $1,250
Resolve
Show 15 more ↓
- Class - 1
907.2.8 failure to provide fire alarm system for transient use at apt#2a. class "j" remedy:discontinue illegal occupancy
Mar 8, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code-compliant manner. lack of system of automatic sprinkler where is required as per bc 903.2 and 27-954 for transient use at apt# 2a. remedy: discontinue illegal occupancy
Mar 8, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner. lack of required number of means of egress for every floor per bc 1018.1(2008 code);27-366;bc 1021.1(2014 code) for transient use at apt#2a. remedy:discont
Mar 8, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to ground electrical systems. bsmt service equipment: service entrance conductor not grounded. remedy: provide grounding.
Nov 22, 2013 · Penalty $500
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliancess or wiring in use. outdoor store ffront: defective open wiring one in use under canopy,fluorescent lighting fixtures for
Nov 22, 2013 · Penalty $1,600
Resolve - Class - 2
Failure to properly bond electrical systems bsmt service switch: 400 amp service switch neutral bar not bonded to enclosure. remedy: provide proper bonding.
Nov 22, 2013 · Penalty $750
Resolve - Class - 2
Work w/o a permit. work noted: 2nd flr public hallway erected opening w/a t.p.s.c.d door creating a (storage) rm door size approx 3' x 7' & also (studio) rm metal (tube) and sheet rock. remedy: obtain permit or
Aug 31, 2013
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.at 1st & 2nd flr marble stairs treds cracked between 5th & 6th flr marble lady cracked in danger of falling.remedy:repair &/or replace.
Sep 4, 2011
Resolve - Class - 2
Work w/o a permit. work noted: installed partitions, electrical & plumbing creating 3 pc bathroom, kitchen and rooms in cellar. remedy: obtain permit and restore to prior legal condition, remove all illegal
Mar 23, 2011
Resolve - Class - 2
Work w/o a permit. work noted: at time of inspection,a platform & canopy has been erected over stairs at rear of building. canopy is connected to building & is built using 2x4's plywood & roofing paper on roof.
Mar 8, 2011 · Penalty $800
Active - Class - 1
Failure to provide unobstructed exit passageway defects noted: at time of inspection there is flower pots on fire escape at 4th & 5th fl landings of fire escape obstructing egress. remedy: remove obstructions
Mar 8, 2011 · Penalty $800
Resolve - Non-hazardous
Occupancy to that allowed by the c of o or bldg dept. records occupa ncy noted: part of basement area currently occupied as habitable spacehaving full kitchen and 3pc bathroom (tub,toilet,sink) contrary to
Nov 9, 2007 · Penalty $400
Active - Hazardous
Failure to comply with an order of the department to correct vio #34532732 for work w/o permit in the cellar,installed partitions (3 rms & plumbing w/o permits.remedy:comply w/ department order & obtain permit
Jan 6, 2007 · Penalty $1,500
Active - Hazardous
Wk w/o permit. wk noted: @ cellar level erected partitions to create approx 3 rms.install water & wastelines for kitchen. installed new windows. note:(no lintels installed) rms located 4' from boiler rm.
Aug 17, 2006 · Penalty $2,500
Active - Hazardous
Occupancy contrary to that allowed by building department records first floor store converted to unlicensed eating and drinking establishment. remedy: discontinue illegal occupancy forthwith.
Nov 16, 2002 · Penalty $2,500
Active
Complaints
- Water leak
Heavy flow
Aug 3, 2026 · Apt 3C
Close - Paint/plaster
Ceiling
Jul 20, 2026 · Apt 4C
Close - Water leak
Heavy flow
Jul 20, 2026 · Apt 4C
Close - Door/window
Window pane
Jul 20, 2026 · Apt 4C
Close - Paint/plaster
Ceiling
Jul 19, 2026 · Apt 3C
Close - Water leak
Heavy flow
Jul 18, 2026 · Apt 3C
Close - Water leak
Heavy flow
Jul 9, 2026 · Apt 3C
Close - Paint/plaster
Wall
Jul 9, 2026 · Apt 3C
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt 3C
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt 4C
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jun 23, 2026 · Apt 4C
Close - Paint/plaster
Ceiling
Jun 23, 2026 · Apt 4C
Close - Water leak
Heavy flow
May 26, 2026 · Apt 4C
Close - General
Cabinet
May 26, 2026 · Apt 4C
Close - Electric
No lighting
May 26, 2026 · Apt 4C
Close - Unsanitary condition
Mold
May 26, 2026 · Apt 4C
Close - Plumbing
Steam pipe/riser
May 26, 2026 · Apt 4C
Close - Paint/plaster
Ceiling
May 26, 2026 · Apt 4C
Close - Flooring/stairs
Floor
May 26, 2026 · Apt 4C
Close - Flooring/stairs
Floor
May 22, 2026 · Apt 4C
Close - General
Cabinet
May 22, 2026 · Apt 4C
Close - Unsanitary condition
Mold
May 22, 2026 · Apt 4C
Close - Paint/plaster
Radiator
May 22, 2026 · Apt 4C
Close - Paint/plaster
Ceiling
May 13, 2026 · Apt 4C
Close - Electric
Lighting
May 13, 2026 · Apt 4C
Close - Paint/plaster
Radiator
May 13, 2026 · Apt 4C
Close - Paint/plaster
Cabinet
May 13, 2026 · Apt 4C
Close - Flooring/stairs
Floor
May 13, 2026 · Apt 4C
Close - Paint/plaster
Wall
May 13, 2026 · Apt 4C
Close - Unsanitary condition
Mold
May 13, 2026 · Apt 4C
Close - Heat/hot water
Apartment only
Feb 10, 2026 · Apt 4D
Close - Water leak
Slow leak
Feb 1, 2026 · Apt 4D
Close - Flooring/stairs
Floor
Feb 1, 2026 · Apt 4D
Close - Plumbing
Bathtub/shower
Feb 1, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Feb 1, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 30, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt 3D
Close - Plumbing
Water supply
Nov 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 28, 2025 · Apt 2F
Close - Plumbing
Water supply
Nov 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1920
- Floors
- 6
- Residential units
- 33
- Building area
- 26,400 ft²
- Lot area
- 5,046 ft²
- Zoning
- R7A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1786 / 42
- Assessed value
- $1,289,250
- Landmark / historic district
- No
HPD registration #102986, last renewed Oct 14, 2025.
Questions about 212 East 122 Street
Who owns 212 East 122 Street?
The owner of record in NYC Department of City Planning PLUTO data is 122 Realty (2012) LLC.
Does 212 East 122 Street have violations?
Yes. NYC HPD has recorded 867 housing violations at this property.
Is 212 East 122 Street rent stabilized?
NYC Department of Finance tax bills listed 25 rent-stabilized units here in 2024 (about 76% of its 33 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 212 East 122 Street built?
City records list 1920 as the year it was built.
How many apartments are in 212 East 122 Street?
It has 33 residential units and 34 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.