28 East 125 Street
Manhattan, NY 10035BBL 1-01749-0056Map
Owner of record: Bravo Realty Corp
28 East 125 Street is an elevator apartment building built in 1900 in Manhattan, 10035. It has 16 residential units across 5 floors. The owner of record is Bravo Realty Corp. HPD has recorded 283 housing violations here, most recently on October 16, 2026. 36 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 283
- DOB violations
- 62
- ECB violations
- 25
- HPD complaints
- 558
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 283
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Replace with new the missing top eschutcheon plate at heat riser pipe in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the kitchen located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective wood base cabinet door at sink in the kitchen located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3e, 3rd story, 1st apartment from west at north
Oct 16, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3e, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 3e, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd private hallway from north located at apt 3e, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wall cabinet at north wall in the kitchen located at apt 3e, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st private hallway from north located at apt 3e, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 3e, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3n, 3rd story, 1st apartment from west at north
Sep 9, 2026 · Apt 3N
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3n, 3rd story, 1st apartment from west at north
Sep 9, 2026 · Apt 3N
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 3n, 3rd story, 1st apartment from west at north
Sep 9, 2026 · Apt 3N
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3e, 3rd story, 1st apartment from west at north
Jul 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3e, 3rd story, 1st apartment from west at north
Jul 23, 2026 · Apt 3E
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Jul 18, 2026 · Apt 2E
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Jul 18, 2026 · Apt 2E
Open — Civ14 mailed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 2e, 2nd story, 1st apartment from west at north
Jul 18, 2026 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jul 3, 2026 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 2nd bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Jul 3, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Jul 3, 2026 · Apt 1F
Open — Civ14 mailed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at yards throughout
Apr 19, 2026
Open — Not complied with - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 19, 2026
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Apr 2, 2026 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles in the private hallway located at apt 2e, 2nd story, 1st apartment from west at north
Apr 2, 2026 · Apt 2E
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2e, 2nd story, 1st apartment from west at north
Apr 2, 2026 · Apt 2E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2e, 2nd story, 1st apartment from west at north
Apr 2, 2026 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures throuighout in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Jan 26, 2026 · Apt 2W
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures throughout in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Jan 26, 2026 · Apt 2W
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Dec 4, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from east located at apt 1, 1st story, 1st apartment from east at south
Dec 4, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from east located at apt 1, 1st story, 1st apartment from east at south
Dec 4, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Dec 4, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the private hallway located at apt 2e, 2nd story, 1st apartment from west at north
Oct 16, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Oct 16, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Oct 16, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2e, 2nd story, 1st apartment from west at north
Oct 16, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the private hallway located at apt 2e, 2nd story, 1st apartment from west at north
Oct 16, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 2e, 2nd story, 1st apartment from west at north
Oct 16, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Jul 17, 2025 · Apt 2W
Closed — Violation dismissed
DOB building violations · 62
- Elevator elevatorrequired
E-elevator elevatorrequired
Jan 10, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Construction other optional
Due to fire
May 31, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2015
Dob violation - resolved
Show 40 more ↓
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 3, 2009
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2007
Vw*-violation - work w/o permit dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2004
Vw*-violation - work w/o permit dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
1p10534
Jul 31, 2002
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 1994
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed
ECB violations · 25
- Class - 1
Noted trash and debris partially obstructing exist passageway from rear fire escapes to street. debris prevent quick escape from rear apartments in case of emergency., remove obstruction; remove debris.
Jul 2, 2023 · Penalty $312
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35385133l issued on 02-20-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no c of c on file. remedy: comply w/comm's order &/or file a c
Sep 16, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35385133l issued on 02-20-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Jul 2, 2019
Resolve - Class - 2
Failure to comply with the commissioner's order contained in sum/vio #35385133l issued on 02/20/19 & to file a c of c pursuant to 28-201.1 &1rcny 102-01. remedy: comply with commissioner's order &/or file a c o
May 4, 2019
Resolve - Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4.noted:vacate order #72 issued on 05/31/16 to apartment #3w at the 3rd flr of the building.at time of inspection observed the premises of apt#3w
Feb 20, 2019
Resolve - Class - 2
Residence altered as a dwelling for more than the number of families legally authorized by the cofo or official records.noted:occupancy contrary to cofo obseved class "a"apt at cellar.3pc bathroom.full kitchen
Sep 13, 2016
Resolve - Class - 1
Failure to comply with the commissioner's order contained in nov#35180034r issued on 5/31/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01.noted:no document file for work w/o a permit at basem
Aug 1, 2016 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in nov# 35180033p issued on 5/31/16 & to file a c of c pursuant to 28-201.1, 28-204.4 & 1rcny 102-01. noted: no document file c of c. rem: comply w/ commi
Aug 1, 2016
Resolve - Class - 2
Electrical work w/o a permit. new branch circuit wiring,fixtures,outlets & switches in apt 3w. remedy: obtain permit.
Jul 8, 2016 · Penalty $400
Resolve - Class - 1
Occupancy contrary to c of o &/or dob records.noted in apt3w found legal class apt converted into 5 sros w/ interior access doors to fire escape completely sealed.basement level converted into a class a apt & a
May 31, 2016
Resolve
Show 15 more ↓
- Class - 1
Work w/o a permit.noted @ basement level,found class a apt created w/ full height sheet rock partitions to create rooms,connections of gas,electrical bx cables,water & waste lines to create a 3pc bath & a kitch
May 31, 2016 · Penalty $1,600
Resolve - Class - 3
97r## - failure to obtain permit for removal of elevator device 1p105234.
Oct 7, 2013 · Penalty $200
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.note: 15' commercialawning on 125 st side of above premises has become detached and has partly fallen to sidewalk below. awning is in danger of coming fully det
Nov 9, 2012
Resolve - Non-hazardous
Failure to maintain bldg exterior defects noted: at east exposure facade #1 @ north exposure, facade #4 at parapet small amounts of spalling stucco have dislodged and are missing.remedy: maintain bldg exterior
Aug 14, 2007 · Penalty $350
Resolve - Non-hazardous
Failure to maintain building. broken and cracked wood beams (approx 20) in cellar at pool room (area). remedy: obtain all approvals and permits to repair or replace all broken and defectious beams in cellar.
Oct 5, 2003
Resolve - Hazardous
Failure to maintain building. hazardous ceiling beams (wood 3 x 10) located in sound room in celler are cracked braking and defective. remedy: repair or replace all defect beams in cellar and submit a
Aug 11, 2003 · Penalty $2,500
Resolve - Non-hazardous
Occupancy contrary to that allowed by dept bldg from apts to bath in cellar remedy discontinue illegal use or obtain a new co shawing current occupancy
Aug 11, 2003
Resolve - Non-hazardous
30p17,73p17,35p17,33p17. 30-provide access hoistway. 33-provide access to overhead. 35-provide access to motor room. 73-provide access to elevator as per code.
Oct 12, 1999 · Penalty $350
Resolve - Non-hazardous
74#-failure to file and obtain permit for removal of device 1p10534 with this dept.
Aug 3, 1998 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit work noted.1-new store front 2-steel roll down security gate.removal of fire division seperation of stores location 1 floor street level 1 offense is a stop work order all work is complete
Aug 28, 1995 · Penalty $350
Resolve - Non-hazardous
Work without a permit. work noted:--new store front. steel roll downsecurity gates. new floor over existing floor. hazardous structural joists. removal of fire division, seperation of store. remedy: obta
Feb 2, 1995 · Penalty $1,000
Resolve - Non-hazardous
73l restore elevator to service and notify the dept of bldgs elev division at 212 3128653 and apply for reinspection
Jan 11, 1994 · Penalty $200
Resolve - Non-hazardous
Work without a permit- stop work order noted: (1) new store front (2)steel roll down security gates. (3) new floor-(over existing hazardous structural joists) (4) removal of fire division (seperation of stores)
Apr 9, 1993 · Penalty $800
Resolve - Non-hazardous
73x,35p,33w,73#,33m,33i, 73 restore to service so that a full inspection can be made by this dept. 73 perform 5yr test-file elv 3 form-tag device 33 ladder to 33 by light
Nov 10, 1992 · Penalty $200
Resolve - Non-hazardous
35p; 33p; 03p
May 10, 1991 · Penalty $1,000
Resolve
Complaints
- Plumbing
Basin/sink
Oct 15, 2026 · Apt 3E
Close - General
Cabinet
Oct 15, 2026 · Apt 3E
Close - Unsanitary condition
Mold
Oct 15, 2026 · Apt 3E
Close - Electric
Power outage
Oct 15, 2026 · Apt 3E
Close - Paint/plaster
Wall
Oct 15, 2026 · Apt 3E
Close - Door/window
Door
Oct 15, 2026 · Apt 3E
Close - Flooring/stairs
Floor
Oct 15, 2026 · Apt 3E
Close - General
Cabinet
Oct 7, 2026 · Apt 3E
Close - Plumbing
Radiator
Oct 7, 2026 · Apt 3E
Close - Unsanitary condition
Mold
Oct 7, 2026 · Apt 3E
Close
Show 40 more ↓
- Plumbing
Basin/sink
Oct 7, 2026 · Apt 3E
Close - Flooring/stairs
Floor
Oct 7, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Sep 7, 2026 · Apt 3E
Close - Plumbing
Water supply
Sep 7, 2026 · Apt 3W
Close - Heat/hot water
Entire building
Sep 7, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Sep 7, 2026 · Apt 3W
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt 14TEST
Close - Flooring/stairs
Floor
Aug 1, 2026 · Apt 2E
Close - Unsanitary condition
Mold
Aug 1, 2026 · Apt 2E
Close - Flooring/stairs
Floor
Aug 1, 2026 · Apt 2E
Close - Unsanitary condition
Pests
Jul 14, 2026 · Apt 3E
Close - Plumbing
Basin/sink
Jul 14, 2026 · Apt 3E
Close - Unsanitary condition
Mold
Jul 14, 2026 · Apt 3E
Close - Paint/plaster
Ceiling
Jun 29, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Jun 29, 2026 · Apt 1F
Close - Water leak
Slow leak
Jun 29, 2026 · Apt 1F
Close - Water leak
Slow leak
Jun 29, 2026 · Apt 1F
Close - Unsanitary condition
Pests
Jun 22, 2026 · Apt 3E
Close - Plumbing
Basin/sink
Jun 22, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Jun 22, 2026 · Apt 3E
Close - Electric
Lighting
Jun 22, 2026 · Apt 3E
Close - Flooring/stairs
Floor
Jun 22, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Apr 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 4S
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt 2W
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 3W
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 5S
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 21, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt 3W
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt 3W
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 3W
Close - Plumbing
Water supply
Jan 26, 2026 · Apt 3W
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1900
- Floors
- 5
- Residential units
- 16
- Building area
- 23,975 ft²
- Lot area
- 5,803 ft²
- Zoning
- C4-4A
- Community board
- 111
- Council district
- 9
- Block / lot
- 1749 / 56
- Assessed value
- $933,750
- Landmark / historic district
- No
HPD registration #114907, last renewed Oct 14, 2025.
Questions about 28 East 125 Street
Who owns 28 East 125 Street?
The owner of record in NYC Department of City Planning PLUTO data is Bravo Realty Corp.
Does 28 East 125 Street have violations?
Yes. NYC HPD has recorded 283 housing violations at this property.
Is 28 East 125 Street rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 50% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 28 East 125 Street built?
City records list 1900 as the year it was built.
How many apartments are in 28 East 125 Street?
It has 16 residential units and 21 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.