1485 5 Avenue
Manhattan, NY 10035BBL 1-01746-7501Map
Owner of record: Unavailable Owner
1485 5 Avenue is a condominium built in 2007 in Manhattan, 10035. It has 206 residential units across 30 floors. The owner of record is Unavailable Owner. HPD has recorded 6 housing violations here, most recently on February 4, 2020. 6 of the 6 most recent violations are still open. City tax records listed 47 rent-stabilized apartments here in 2024.
- HPD violations
- 6
- DOB violations
- 24
- ECB violations
- 56
- HPD complaints
- 192
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 6
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Feb 4, 2020
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 4, 2020
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Feb 4, 2020
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Feb 4, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 4, 2020
Open — Nov sent out - BHazardous
Properly repair the broken or defective weatherise window in the 2nd room from north located at apt 10b, 10th story, 2nd apartment from west at north
Jan 15, 2016 · Apt 10B
Open — Nov sent out
DOB building violations · 24
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2017
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2015
Dob violation - resolved
Show 14 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2011
Dob violation - resolved - Construction other optional
C-construction other optional
May 26, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2010
Dob violation - resolved
ECB violations · 56
- Class - 1
Cease use violation issued, worn severely undersized hoist ropes with a lot of rouge, / altered car door restrictor,/ pit door safety switch by pass, remedy; repair all cease use violation then contact nycdob f
Mar 23, 2021 · Penalty $1,250
Resolve - Class - 1
Cease use violation issued items are, severely worn and undersized hoist ropes, with rouge / brake monitor switch damage remedy; repair then contact nycdob for restore to service re- inspection, class 2, improp
Mar 23, 2021 · Penalty $1,250
Resolve - Class - 2
Class 2 violation issued, floor to ceiling in car mirror insufficient,remedy; provide code safety mirror.
Mar 23, 2021 · Penalty $625
Resolve - Class - 2
Failure to notify department 24 hr prior to suspended scaffold removal.noted:@ time of inspection all suspended scaffolds were removed without prior notifying department.rem:notify department 24 hr prior to sus
Feb 7, 2018 · Penalty $830
Resolve - Class - 2
Prohibited business advertising sign posted on the sidewalk shed. noted: @ time of insp business advertising signs for'tri-state safety'&'everest scaffolding inc' posted on the sidewalk shed. rem: remove prohib
Nov 22, 2017 · Penalty $10,000
Resolve - Class - 2
Pedestrian protection does not meet code specifications.noted:at the time of inspectio i observed sidewalk shed in place on expo #1 and #4 with storage of construction material on sidewalk shed roof.that does n
Jun 13, 2017 · Penalty $2,400
Resolve - Class - 2
Built in accordance w/plans. equipment on site is contrary to the approved plans. note: at time of inspection i observed supported scaffold installed on exp#4 that is contrary to the approved plan. the used of
Jun 13, 2017 · Penalty $530
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction. note: at time of inspection i observed sidewalk shed in place w/sidewalk shed(meaning)guardrail syste, on the open end of the sidewalk shed
Jun 13, 2017 · Penalty $400
Resolve - Class - 2
Built in accordance w/plans. all equipment must be installed as per cd-5 approved plans. note: at time of inspection i observed suspended scaffold installed on exp#1 w/the anchor plate for there life line & tie
Jun 13, 2017 · Penalty $250
Resolve - Class - 1
Sec bc3307.3.2 failure to provide fence around the construction site as per code along 5th av and 119st no fence provided along curb lvl temporary walkway provided on street for pedestrians where no fence provi
Apr 4, 2009 · Penalty $1,600
Resolve
Show 40 more ↓
- Class - 2
Failure to maintain adequate housekeeping per section requirements:upon inspection as noted there was an excessive amount of debris & disguarded bldg material:studs, sheetrock & empty box's approx 20yds cubic
Mar 26, 2009 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations:observed recent smoking refuse within construction site in violation of nyc fire code 1404.1.there were cigarette buts on the roof
Mar 26, 2009 · Penalty $400
Resolve - Class - 1
Failure to institute of maintain safety equipment measures or temporary construction.no handrail upon inspection as noted there was no handrail on the stairwell between the 27 - 28 floors causing risk of injur
Mar 26, 2009 · Penalty $1,000
Resolve - Class - 2
Sec.3307.4.3. & 27-1023.vehicular traffic (no warning lights):as observed upon inspection on active job site.the traffic barriers approx 70ft on the 120th st side of bldg had insufficient lights in place only
Mar 26, 2009 · Penalty $400
Resolve - Class - 1
Failure to institute & maintain safety equipment.measures or temporaryconstruction:no guardrails:as noted upon inspection on an active job site up to 30 fl.there were no guardrails on set back roof top at the
Mar 26, 2009 · Penalty $1,200
Resolve - Class - 2
Failure to maintain building in code-complaint manner: lack of emergency lighting for exits. exit discharges & public corridors per bc 1006.1 upon inspection as observed the was no lighting in the stairwells 28
Mar 3, 2009 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations: upon inspection as observed recent smoking refuse w/i construction site in violation of nyc fire code 1404.1 there were cigarette
Mar 3, 2009 · Penalty $6,000
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements: upon inspection as noted there was an excessive amount of debris,disguarded sheetrock,insulation(disguarded)metal stud's spread throughout the
Mar 3, 2009
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations: upon inspection as noted: the barriers on the north side of active construction site were fallen over, broken, and they needed
Feb 17, 2009 · Penalty $1,200
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements: upon inspection as noted: there was an excessive amount of debris discarded bldg material, pallets & packing crates approx 30-35 cu yds spread
Feb 17, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations: upon inspection as noted: observed recent smoking refuse w/i construction site in vio of nyc fire code 1404.1 smoking refuse was
Feb 17, 2009 · Penalty $1,200
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction: hole in floor: upon inspection as noted: there were largeholes in the fl on fls 26th & 30th measuring approx 6" x 12" & 6" x 9"
Feb 17, 2009 · Penalty $1,000
Resolve - Class - 1
Flammable and combustible mixtures compressed gases and other hazards materials. noted: storage and use of salamander heaters (hazardous) thru out bldg w/o fdny permits apprx 8 cylinder of (recogen) 8 heaters
Feb 4, 2009
Resolve - Class - 1
Sec. 3313.1 flammable & combustible mixtures,compressed gases,& other hazards materials. noted: storage & use of salamander heaters (kerosem) thru-out building w/o f.d.n.y. permits. remedy: stop all use remove
Jan 26, 2009 · Penalty $8,000
Resolve - Class - 1
Site safety manager coordinator noted:waited from 3:25 to 4:10 for site & safety manager was informed by said super that ssm was sick & left early he didn't inform office approx. 40 men in & out of bldg hoist
Jan 13, 2009 · Penalty $8,000
Resolve - Class - 1
Sec 1906.6.1.2 misc viol: reshores not secured within 10' from edge ofbldg note: at time of insp at above active const site observed re shores at north elevation of site & hoist gate are not secured on 11 thru
Nov 17, 2008 · Penalty $1,600
Resolve - Class - 1
Sec 3309.10 & 26-230 misc viol: failure to protect roofs, roofs outlets or skylights or adjoining property. note: at time of insp at above active const site observed there is no roof protection on adjacent bld
Nov 17, 2008 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment etc.,- no guard rails note: at time of insp at above active const site observed there is no guard rails provided at the balconies & terraces of south elevation of
Nov 17, 2008 · Penalty $2,400
Resolve - Class - 1
Sec.3313.1 storage of all flammable and combustible compressed gases note at time of inspection at above active const site observed approx 3 tanks stored at 1st fl level (south east corner) of jobsite storage
Nov 17, 2008 · Penalty $1,600
Resolve - Class - 2
Sec. 3307.4.3 failure to maintain barricade for lane closure. note: at time of inspection at above active construction site. observed material & debris dumpster stored at front of site occupying 1 lane of traff
Nov 12, 2008 · Penalty $4,000
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionops. at time of insp. on active jobsite observed recent smoking refusewithin const. site in violation of nyc fire code 1401.1 smoking refuse
Sep 30, 2008 · Penalty $6,000
Resolve - Class - 1
Failure to safeguard all persons and prop affected by const operationsnoted: at time of insp. on active job site w/interior trades work in progress. (sheetrocking,plumbing taping) observed open glass door open
Sep 30, 2008 · Penalty $12,000
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp. constan active job site no toe boards were observed at open elevator shaft guard rail system or at staircase landing on lower fl inside of rear o
Sep 30, 2008 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons and prop affected by const operationsnoted: at time of insp. on active job site w/interior trades work in progress (plumbing,sheetrock,roofing) observed open elevator shaft w/n
Sep 30, 2008 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping. noted: upon inspection of place of occurrence, 1st floor & exterior on corner of w 119th st broken block, brick bldg debris thru-out. dangerous working conditions.
Aug 13, 2008 · Penalty $400
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted: upon inspection scaffolding installed at the above place of occurrence was not installed per plans provide at site
Aug 13, 2008 · Penalty $250
Resolve - Class - 2
Failure to do adequate housekeeping. noted: upon inspection housekeeping on the 29th floor bldg material through-out sheetrock metal studs, litter, dangerous working conditions. remedy: provide housekeeping as
Aug 6, 2008 · Penalty $400
Resolve - Hazardous
Safety netting damaged and/or broken. as noted: at the time of inspection on active construction site. bldg up to roof brick & block work in progress. vertical perimeter netting is ripped, torn from cable,
May 5, 2008 · Penalty $5,000
Resolve - Hazardous
Failure to perform adequate housekeeping. as noted: at the time of inspection on active construction site. excessive amounts of debris (masonry, lumber & rubbish) are scattered thru-out the following floors
May 5, 2008 · Penalty $880
Resolve - Hazardous
Sec. 27-1015. no design drawing. as noted: at the time of inspection on active construction site brick work & block work in progress. there is material electric hoist installed at bulkhead. there is no design
May 5, 2008 · Penalty $2,500
Resolve - Hazardous
Work contrary to approved dob planks & application scaffold erected on 5th ave elevation setbacks not shown on supported scaffold plan remedy:conform to approved plans
Mar 21, 2008 · Penalty $500
Resolve - Hazardous
Work contrary to approved dob planks & application (shed on 120th st nnot shown on approved drawing remedy:conform to approved plans
Mar 21, 2008 · Penalty $500
Resolve - Hazardous
Failure to have site safety manager present as required on inspection new bldg was in full operation thrughout 30 story w/o site safety manager on site as per code. remedy: "stop all work" provide and maintain
Feb 12, 2008 · Penalty $2,000
Resolve - Hazardous
Failure to close sidewalk before lifting over the sidewalk on inspection lifting operation in progress on 2nd ave. contractor was loading flatbed with concrete form lumber over sidewalk to flatbed with out clos
Feb 12, 2008 · Penalty $1,500
Resolve - Hazardous
Failure to have site safety manager present as required. as noted: upon inspection on active construction site. form work in progress at deck of 28th fl & hoisting rebar by crane in progress there is no site
Jan 16, 2008 · Penalty $5,000
Resolve - Hazardous
Sec.27-1021(a)(b).vertical safety netting not provided.at time of inspection sections of floors 18,17 & 16 are missing vertical netting at elevations facing courtyard.remedy:provide vertical netting as per code
Dec 24, 2007 · Penalty $2,500
Resolve - Hazardous
Failure to provide handrails.at time of inspection handrails are missing on stairwell from floor 19,20 & 21.stairwell consist of scissor stairs,no temporary or permanent handrails are provided.remedy:provide
Dec 24, 2007 · Penalty $10,000
Resolve - Hazardous
Vertical safety netting not provided. as noted: vertical netting not provided on the 18 & 19 flrs. remedy: provide netting as per code. stopall work make safe.
Dec 11, 2007 · Penalty $500
Resolve - Hazardous
Failure to provide approved design drawing for formwork support layoutas noted: upon inspection 18th flr slab pouring concrete in progress. there is outrigge platform on 16th & 17th flr apprx 10 4'ft out from
Nov 28, 2007 · Penalty $800
Resolve - Hazardous
No guardrails. as noted: no guardrails provided around opening area @ edge of the bldg on 2nd flr thru 5th flr. @ time of inspection concrete pouring on 18th flr in progress. remedy: provide guardrails.
Nov 28, 2007 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 3, 2026 · Apt 6F
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 8C
Close - Door/window
Door
Apr 17, 2025 · Apt 9E
Close - Heat/hot water
Entire building
Dec 10, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 6, 2024 · Apt 4B
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2007
- Floors
- 30
- Residential units
- 206
- Building area
- 355,544 ft²
- Lot area
- 26,773 ft²
- Zoning
- R7-2
- Community board
- 111
- Council district
- 9
- Block / lot
- 1746 / 7501
- Assessed value
- $27,918,463
- Landmark / historic district
- No
HPD registration #143303, last renewed Feb 10, 2026.
Questions about 1485 5 Avenue
Who owns 1485 5 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 1485 5 Avenue have violations?
Yes. NYC HPD has recorded 6 housing violations at this property.
Is 1485 5 Avenue rent stabilized?
NYC Department of Finance tax bills listed 47 rent-stabilized units here in 2024 (about 23% of its 206 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1485 5 Avenue built?
City records list 2007 as the year it was built.
How many apartments are in 1485 5 Avenue?
It has 206 residential units and 359 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.