roofy

27 West 129 Street

Manhattan, NY 10027BBL 1-01727-0021Map

Owner of record: West 128th Street L.p.

27 West 129 Street is a walk-up apartment building built in 1910 in Manhattan, 10027. It has 35 residential units across 6 floors. The owner of record is West 128th Street L.p.. HPD has recorded 72 housing violations here, most recently on June 24, 2026. 30 of the 50 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.

HPD violations
72
DOB violations
22
ECB violations
31
HPD complaints
110

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 24, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
18
About 51% of the building's 35 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 72

  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Jun 24, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch vestibule door at public hall, 1st story

    Apr 27, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story

    Apr 14, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at vestibule door , 1st story

    Apr 14, 2026

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside the closet at west wall in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling inside the closet at west wall in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
Show 40 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Mar 4, 2026 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door

    Feb 13, 2026

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 15, 2025

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door at cellar locked at boiler room

    Dec 15, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Dec 15, 2025 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Dec 15, 2025 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Properly repair the source and abate the evidence of a water leak over the ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    Dec 15, 2025 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    Dec 15, 2025 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system incorrect information posted on sign at public hall, 1st story

    Dec 15, 2025

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Dec 15, 2025 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing/defective devices in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Dec 3, 2025 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 3a, 4th story, apartment at west

    Dec 3, 2025 · Apt 3A

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing/defective devices in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Dec 3, 2025 · Apt 3A

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective eroded wood door in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west

    Dec 3, 2025 · Apt 3A

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective broken and loose floor marble saddle in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west

    Dec 3, 2025 · Apt 3A

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the private hallway , the foyer located at apt 1a, 1st story, 1st apartment from south at west

    Aug 28, 2025 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 28, 2025 · Apt 1A

    Open — First no access to re- inspect violation
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at 1st closet from south at west wall wall in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Aug 28, 2025 · Apt 1A

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    Aug 28, 2025 · Apt 1A

    Open — Violation will be reinspected
  • C

    Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 1a, 1st story, 1st apartment from south at west

    Aug 28, 2025 · Apt 1A

    Open — Violation will be reinspected
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at closet from south at west wall in the private hallway located at apt 1a, 1st story, 1st apartment from south at west original violation 18191567 issued 28-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Aug 28, 2025 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Remove all encumbrances consisting of house hold items at public hall, 1st story

    Aug 26, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches at public hall, 1st story

    Aug 26, 2025

    Open — Defect letter issued
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    May 19, 2025 · Apt 5B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    May 19, 2025 · Apt 5B

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the floors and stairs at public hall, 6th story

    Nov 18, 2024

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall at east , 1st story

    Nov 18, 2024

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 1st story

    Nov 18, 2024

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls 1st closet from south at west wall wall in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Jul 22, 2024 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall and ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    Jul 22, 2024 · Apt 1A

    Open — First no access to re- inspect violation
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft.at the west and north walls 1st closet from south at west wall wall in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Jul 22, 2024 · Apt 1A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    Jul 22, 2024 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Jul 22, 2024 · Apt 1A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Jul 22, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from south at west

    Jul 22, 2024 · Apt 1A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 4th room from north, the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    Jul 22, 2024 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft.at the west and north walls closet from south at west wall in the private hallway located at apt 1a, 1st story, 1st apartment from south at west original violation 17135222 issued 22-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 22, 2024 · Apt 1A

    Open — First no access to re- inspect violation

DOB building violations · 22

  • Construction other optional

    Failure to maintain building in code compliant manner. at time of inspection, observed at exp 1 south elevation cracked/spalling window sills at several locations and floors. exposure 4 east elevations spalling, bricks at upper floors. remedy: repair/replace all damaged facade and appurtenances

    May 12, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.at time of ins pection,it was observed at exp1 spalled window sill,step crack and cra cks on decorative stone at exp4 at parapet.observed crack in stucco at exp4 minor cracking/spalling of stucco and brick.remedy:repair and/or replace

    Mar 21, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner. at time of inspection it was observed at exposure 1 (s. elev) spalled window sill, step cracks & cracks on decorative stone. remedy: repair and/or replace

    Oct 2, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner. as noted at time of inspection observed on exposure #4 spalling stucco masonry on exposure#1 observed damage window sill. remedy: repair and/or replace

    May 16, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner.as noted at time of inspection observe on exposure#4 east elevation .spalling masonry on 5th floor exposure#1 south elevation crack sill on 4th. remedy: repair and or replace damaged facade

    Jan 10, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner;observed damaged joints and spalling at exposure 4 crack window sill&damaged decorative at exposure 1 remedy:maintain building repair and or replace

    Sep 8, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 11, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 13, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
Show 12 more ↓
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - active
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Sep 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 31

  • Class - 2

    Failure to file acceptable amended cycle report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #613002. remedy: file acceptable report.

    Apr 20, 2026 · Penalty $6,250

    Active
  • Class - 2

    At 5:25am observed 6 story building with sidewalk shed that was not illuminated as stipulated in bc3307.6.4.8 creates hazardous conditions for pedestrians of slips and trips due to inadequate lighting in dark c

    Aug 26, 2025 · Penalty $10,000

    Active
  • Class - 2

    At time of inspection of 6 story building observed sidewalk shed in place not maintained per code1.rotting/missing muds sills 2. leaning/unsecured parapets 3. catch all not secure 4. missing bolt covers all cau

    Aug 7, 2025 · Penalty $2,400

    Resolve
  • Class - 2

    At time of inspection of 6 story building observed sidewalk shed in place without information panel causing hazardous conditions.provide information panel

    Aug 7, 2025

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification. at time of inspection it was observed shed in place had damaged/deteriorated mudsills in multiple locations and mudsills missing which bracing doesn't to

    Mar 21, 2025 · Penalty $6,000

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications. at time of inspection it was observed: shed inplace had damaged/deteriorated mudsills in mulitple locations and a mudsill while bracing doesn't touch the

    Oct 2, 2024 · Penalty $10,000

    Active
  • Class - 2

    Sidewalk shed does not meet code specifications. pedestrian protectiondoes not meet code specification. at the time of inspection observed shed in place but the shed mud sills were missing and damaged in multip

    May 16, 2024 · Penalty $6,000

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 7b,8b,and 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#913002.agg2 history of noncom

    Apr 11, 2024 · Penalty $10,000

    Active
  • Class - 2

    Failure to mainatin building exterior facade and appurtenances. note: at time of inspection observed a vertical crack exposure #1 south elevation at the southeast corner from cornice. remedy: maintain building

    Mar 29, 2024 · Penalty $6,250

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications. as noted: at time of inspection shed mud sills was missing damaged, rotting at multiple shed post shed parapet appears to be deteriorating. remedy: compl

    Jan 10, 2024 · Penalty $10,000

    Active
Show 21 more ↓
  • Class - 2

    Sidewald-shed does not meet code specification. note: observed damagedand unsecured mud sill on installed sidewalk shed at exposure 1. remedy: conform shed to code specifications.

    Sep 8, 2023 · Penalty $10,000

    Active
  • Class - 2

    Failure to submit acceptable required cycle 7b & 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #813002.agg2:history of noncompliance o

    Oct 19, 2022 · Penalty $10,000

    Active
  • Class - 2

    Failure to file acceptable amended cycle 6 report indicating correction of unsafe conditions described in initial facades report required b y 28-302.5 for control#613002. remedy: file acceptable report.

    Oct 8, 2021 · Penalty $6,250

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 7b & 8b report of critical examination documenting condition of exterior wall & appurtenancesrequied by 28-302.4 for control#813002. agg2 history of noncompliance

    Jun 1, 2021 · Penalty $10,000

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 7b & 8b report criticalexamination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#813002. agg2 history of noncompliance on

    May 20, 2020 · Penalty $10,000

    Active
  • Class - 2

    Job signs. sidewalk shed parapet panel not provided/not in compliance w/ section. noted:at time of inspection i observed shed in place on exposure#1 w/o a job sign on shed parapet. remedy:comply w/ code provide

    Jan 29, 2019 · Penalty $6,250

    Active
  • Class - 2

    Maintenance. pedestrian protection does not meet code specifications. noted:at time of inspection i observed shed in place on exposure#1 w/ the end parapet panel broken,loose,not secure and also the electrical

    Jan 29, 2019

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#813002. remedy: submit required technical report

    Oct 15, 2018 · Penalty $10,000

    Active
  • Class - 1

    Failure to take provide safety measure such as sidewalk sheds. fence etc where requrie to protect and secure public safety from documented unsafe facade as per 1rcny-103-04.facade technical report file unsafe

    Apr 9, 2018 · Penalty $25,000

    Active
  • Class - 1

    Failure to maintain exterior building facade and appurtenances. *east elevation exposure 4,observed cracked and loose stucco at roof parapetwall at 6th floor; inadequate a/c unit support at 5th floor; cracked

    Mar 16, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Removal of safety measures/sidealk shed w/o department's approval. *attime of inspection, bldg facade was still designated as unsafe,the amended facade reprot (trg) received on 03/09/18 has not been accepted

    Mar 16, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4. agg2 history of noncompliance on 36023403k(agg1),36019677x.

    Aug 11, 2016 · Penalty $4,000

    Active
  • Class - 2

    Failure to maintain exterior building south elev exp1 stairway to cel lar wall cracked and bulging east elev exp4 spalling brick. rmdy: maintain exterior bldg; provide safety measures repair and restore damaged

    May 27, 2016 · Penalty $530

    Resolve
  • Class - 2

    Failure to file an acceptable technical report in compliance w/code provisions: periodic inspection pf exterior walls & appurtenances as required by article 28.302 & the dob's rules & regulations. remedy: file

    Oct 21, 2015 · Penalty $8,000

    Active
  • Class - 2

    Failure to file an acceptable amended cycle 6 report to this department indicating correction of unsafe conditions described in initial local law fisp report.rem:file an amended report following remedial repair

    Aug 17, 2015 · Penalty $800

    Active
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Aug 4, 2014 · Penalty $4,000

    Active
  • Class - 2

    Sec. 28-302.5 failure to provide safety measures/shed to protect public from hazadious conditions. noted: unsafe (fisp) technical report filed for cycle 6 on 2/21/07 & no safety measures/shed installed.

    Jan 4, 2012 · Penalty $400

    Resolve
  • Class - 2

    Failure to file an amended 6 round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.36010741k.rem:file an amended report following remedial r

    Sep 17, 2010 · Penalty $2,000

    Active
  • Class - 2

    27/bc (misc)local law report filed as "unsafe"by architect/engineer-noamended report was filed."unsafe conditions" require safety provisionsfor the public as per 27-129 (d) & 1rcny 32-03(b)(5)(i).no sdwlk shed

    Jan 11, 2010 · Penalty $800

    Active
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa

    Dec 4, 2009 · Penalty $800

    Active
  • Class - 1

    Failure to maintain bldg in code-compliant manner. defects noted: front facade fire escape at 4th flr level has one missing step. remedy: repair/replace.

    Jul 15, 2009 · Penalty $1,000

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jun 6, 2026 · Apt BLDG

    Close
  • General

    Signage missing

    Jun 6, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Feb 19, 2026 · Apt 1A

    Close
  • Plumbing

    Radiator

    Feb 19, 2026 · Apt 1A

    Close
  • Plumbing

    Water supply

    Feb 19, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Feb 19, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Feb 19, 2026 · Apt 1A

    Close
  • Water leak

    Slow leak

    Feb 19, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Feb 19, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 1A

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 30, 2026 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Jan 12, 2026 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Jan 9, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Dec 11, 2025 · Apt 1A

    Close
  • Water leak

    Slow leak

    Dec 11, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Dec 11, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Dec 11, 2025 · Apt 1A

    Close
  • Plumbing

    Water supply

    Dec 11, 2025 · Apt 1A

    Close
  • Plumbing

    Water supply

    Dec 11, 2025 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Dec 8, 2025 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Dec 1, 2025 · Apt 3A

    Close
  • Door/window

    Door

    Dec 1, 2025 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Dec 1, 2025 · Apt 3A

    Close
  • Safety

    Smoke detector

    Dec 1, 2025 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Dec 1, 2025 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Dec 1, 2025 · Apt 3A

    Close
  • Door/window

    Window frame

    Dec 1, 2025 · Apt 3A

    Close
  • Electric

    Lighting

    Dec 1, 2025 · Apt 3A

    Close
  • Electric

    Outlet/switch

    Dec 1, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2025 · Apt 2B

    Close
  • General

    Janitor/super

    Aug 21, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2025 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Aug 21, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2025 · Apt 1A

    Close
  • Water leak

    Slow leak

    Aug 21, 2025 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Aug 11, 2025 · Apt 1A

    Close
  • Water leak

    Slow leak

    Aug 11, 2025 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Aug 11, 2025 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jul 30, 2025 · Apt 5B

    Close
  • Paint/plaster

    Ceiling

    May 19, 2025 · Apt 5B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 19, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 24, 2024 · Apt 6C

    Close
  • General

    Janitor/super

    Oct 24, 2024 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Jul 23, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jul 23, 2024 · Apt 1A

    Close
  • Water leak

    Slow leak

    Jul 17, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jul 17, 2024 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jul 17, 2024 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1910
Floors
6
Residential units
35
Building area
17,580 ft²
Lot area
4,188 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
1727 / 21
Assessed value
$261,900
Landmark / historic district
No

HPD registration #117390, last renewed Oct 14, 2025.

Questions about 27 West 129 Street

Who owns 27 West 129 Street?

The owner of record in NYC Department of City Planning PLUTO data is West 128th Street L.p..

Does 27 West 129 Street have violations?

Yes. NYC HPD has recorded 72 housing violations at this property.

Is 27 West 129 Street rent stabilized?

NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 51% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 27 West 129 Street built?

City records list 1910 as the year it was built.

How many apartments are in 27 West 129 Street?

It has 35 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.