46 West 129 Street
Manhattan, NY 10027BBL 1-01726-0061Map
Owner of record: West 128th Street L.p.
46 West 129 Street is an elevator apartment building built in 1920 in Manhattan, 10027. It has 29 residential units across 6 floors. The owner of record is West 128th Street L.p.. HPD has recorded 131 housing violations here, most recently on May 29, 2026. 24 of the 50 most recent violations are still open. City tax records listed 29 rent-stabilized apartments here in 2024.
- HPD violations
- 131
- DOB violations
- 45
- ECB violations
- 21
- HPD complaints
- 184
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 131
- CImmediately hazardous
Properly repair or replace the broken or defective lockset at building entrance door , 1st story
May 29, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
May 29, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
May 29, 2026 · Apt 2D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor tiles in the private hallway located at apt 2d, 2nd story, 1st apartment from south at west
May 29, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2d, 2nd story, 1st apartment from south at west
May 29, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2d, 2nd story, 1st apartment from south at west
May 29, 2026 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor tiles in the 1st room from north at center located at apt 2d, 2nd story, 1st apartment from south at west
May 29, 2026 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 2nd room from north located at apt 2d, 2nd story
May 7, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 1st room from north located at apt 2d, 2nd story
May 7, 2026 · Apt 2D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 1st room from north at east, the 1st room from north at west, the 2nd room from north at east located at apt 3b, 3rd story, 2nd apartment from west at north
May 5, 2026 · Apt 3B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the loose garbage at basement
May 4, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6e , 6th story, 1st apartment from east at south
May 4, 2026 · Apt 6E
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 4, 2026
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Apr 30, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6e, 6th story, 1st apartment from east at south
Apr 30, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6e, 6th story, 1st apartment from east at south
Apr 30, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Replace the broken or defective wash basin in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south
Oct 16, 2025 · Apt 2E
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south
Oct 16, 2025 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south
Oct 16, 2025 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing (2 required based on square footage of apartment) in the entire apartment located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing (2 required based on square footage of apartment) in the entire apartment located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at sink in the kitchen located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock on door of room with fire escape in the 1st room from north at east located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective silicone caulking around water closet in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Open — Not complied with - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 26, 2025 · Apt 2B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 2nd apartment from north at east
Aug 2, 2025 · Apt 2D
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 2nd apartment from north at east
Aug 2, 2025 · Apt 2D
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Aug 2, 2025 · Apt 2B
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Aug 2, 2025 · Apt 2B
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door, roof
May 7, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scaffold blocking drop ladder at second fire escape from east north side of building front at fire escape, 2nd story
Dec 29, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling of 2nd window from north at east in the 4th room from north located at apt 6a, 6th story, 1st apartment from north at east original violation 17344773 issued 13-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 13, 2024 · Apt 6A
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall in the bathroom located at apt 6a, 6th story, 1st apartment from north at east original violation 17344772 issued 13-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 13, 2024 · Apt 6A
Open — Defect letter issued - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door leading to fire escape window in the 1st room from north at west located at apt 6a, 6th story, 1st apartment from north at east
Oct 13, 2024 · Apt 6A
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling of 2nd window from north at east in the 4th room from north located at apt 6a, 6th story, 1st apartment from north at east
Oct 13, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6a, 6th story, 1st apartment from north at east
Oct 13, 2024 · Apt 6A
Closed — Violation dismissed - BHazardous
Replace with new the missing knob at fire door leading to north yard at public hall, 1st story
Oct 13, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latchset at fire door leading to north yard at public hall, 1st story
Oct 13, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at fire door leading to north yard at public hall, 1st story
Oct 13, 2024
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall in the bathroom located at apt 6a, 6th story, 1st apartment from north at east
Oct 13, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6a, 6th story, 1st apartment from north at east
Oct 13, 2024 · Apt 6A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6a, 6th story, 1st apartment from north at east
Oct 13, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 13, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Oct 13, 2024 · Apt 3B
Closed — Violation dismissed
DOB building violations · 45
- Construction other optional
Failure to maintain bldg in a code compliant manner. at time of inspection, observed on exp 1 north elevation - bulging masonry on 6th floor north west corner of bldg. exp 4 west elevation spalling stucco 6th floor at north west and south west end of exposure. remedy: repair and/or replace all damaged facade and appurtenances
May 12, 2026
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner.note at time o f inspection,observed multiple areas of cracked stucco at exp4 at vari ous levels of facade.remedy:repair and/or replace
Mar 21, 2025
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner. at the time of inspection it was observed at exposure 4 (w. elev) (2) ares of spalling stucco. remedy: repair and/or replace
Oct 2, 2024
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner. at the time of inspection observed 2 areas of spalling stucco on exposure #4 remedy: repair and/or replace
May 16, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 13, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2017
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Dec 14, 2016
Dob violation - active
Show 35 more ↓
- Facade safety program facade required
Fisp-facade safety program facade required
Dec 14, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 18, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 2004
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
1p9910
Nov 2, 2001
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Elevator elevatorrequired
1p9910
Sep 5, 2000
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 1994
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 18, 1993
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatorrequired
(73)restore elevator to service
Nov 6, 1989
Dob violation - resolved - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
51) clean installation 52)properly tag gov after conducting 5yrs test 52)provide proper light fixture in cab
Feb 9, 1989
Dob violation - resolved
ECB violations · 21
- Class - 2
Failure to file acceptable amended cycle 7a and 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #813659. agg1: prior nov 37026206l under
Apr 20, 2026 · Penalty $10,000
Active - Class - 1
5/i/10 car & gate switch inoperative repair, 2/x/10 out side comm inoperative repair.
Dec 12, 2025
Resolve - Class - 2
Failure to file acceptable amended cycle 7a and 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #813659. remedy: file acceptable report.
Jan 16, 2024 · Penalty $6,250
Active - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#913659. remedy:submit acceptable requir
Dec 2, 2022 · Penalty $6,250
Active - Class - 2
Pedestrian protection does not meet code specification.note at the time of inspection observed a hd sws at exp1 on a 6 story tenant occupiedbuilding front pedestrian walking under this sws.also observed missing
Aug 11, 2021 · Penalty $625
Resolve - Class - 1
3314.1 partial stop work order for supported scaffold only allowed to work to make safe. note: at time of inspection, i observed supported scaffold in place not built to code standards. 1)remove tarp. 2)guardra
Nov 27, 2018 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code specs. noted: at time of inspection sidewalk shed at exp#1 does not extend 5feet past the bldg on the left hand side. remedy: conform shed to code specs.
Feb 15, 2017 · Penalty $400
Resolve - Class - 2
Sec. 590.8 sidewalk shed lighting. failure to install wires for the sidewalk shed lighting in metal raceway. noted: at time of inspection electrical cord that feeds the sidewalk shed lighting is not installed
Feb 15, 2017
Resolve - Class - 2
Failure to maintain exterior bldg north elev exp 1.objects on fire escape a/c unit 4th fl board on fire escape 4th fl.northwest corner-corner-under/below brick work defective mortar defective-transitional stone
Nov 3, 2016 · Penalty $500
Active - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4. agg2 history of noncompliance on 36027941x(agg1),36019043y.
Aug 11, 2016 · Penalty $4,000
Active
Show 11 more ↓
- Class - 2
Failure to maintain exterior bldg roof north elev. exp.1 boiler chimney cracked parapet stucco bulding & verticle cracks east elev 2 - verticle crack in north / east corner in transitional masonry south elev. e
Apr 25, 2016 · Penalty $2,500
Active - Class - 2
Failure to maintain exterior building.as noed: at time of inspection observed at exp#4, 7th flr deteriorated brick/joints and peeling waterproofing. and file report as per 1rcny 103-04. rmdy: maintain exterior
Nov 14, 2015 · Penalty $500
Active - Class - 2
Failure to maintain exterior bldg 6 fl transitional corner.(nw corner)brick to stone trim-masonry trim dislodged missing mortar.west elev exp4-spalling brick-missing mortar containers on 5fl window sill.immedia
Oct 8, 2015 · Penalty $500
Active - Class - 2
Failure to maintain building wall(s) or appurtenances noted: at exp4, cement plaster/stucco is spalling near parapet wall. rmdy: maintain exterior wall.
Sep 29, 2015 · Penalty $500
Active - Class - 2
Failure to file an acceptable technical report in compliance w/code provisions:36019043y:periodic insp of exterior walls & apputenances as required by article 28.302 & the dob rules & regulations.rem:file the r
Sep 15, 2015 · Penalty $2,000
Active - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Apr 28, 2014 · Penalty $4,000
Active - Non-hazardous
83x# 83x#-entire device inoperative restore device back to service for a complete inspection
May 25, 2004 · Penalty $350
Resolve - Non-hazardous
8i,2b,22d,22y,25q,31q,35o,37g,35o,50y,57z,60m,75u,73u. car saddle, cartop.
Sep 27, 1999 · Penalty $2,500
Resolve - Non-hazardous
22d6,32m7,50y14,50y2,75m5,73u16,74d6,35a4,9h12,57o2,60m7. -32 exposed wires top car provide cover and duct cover in shaftway top floor, -73 provide city i.d. tag on device, -74 secure smoke hole in motor room,
Apr 7, 1999 · Penalty $2,500
Resolve - Hazardous
29r,73x,57o, 29- off the rails 73-restore to service
Apr 28, 1992
Resolve - Non-hazardous
73x,33p,35p,37i,2l,1l,22i,73o,40t,11r,73#,73 restore to service so that a proper inspection can be made by this dept. - 40 five year - 73 h.p.d working without permit cease use until permit is obtain
Jan 9, 1991 · Penalty $2,000
Resolve
Complaints
- Plumbing
Basin/sink
Oct 12, 2026 · Apt 2B
Open - Paint/plaster
Wall
Oct 12, 2026 · Apt 2B
Open - Flooring/stairs
Floor
Jun 28, 2026 · Apt 2D
Close - Unsanitary condition
Mold
Jun 28, 2026 · Apt 2D
Close - Heat/hot water
Entire building
May 30, 2026 · Apt 1A
Close - Flooring/stairs
Floor
May 22, 2026 · Apt 2D
Close - Electric
No lighting
May 6, 2026 · Apt 1C
Close - Paint/plaster
Wall
May 6, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
May 6, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
May 4, 2026 · Apt 2A
Close
Show 40 more ↓
- Appliance
Refrigerator
May 4, 2026 · Apt 2A
Close - Heat/hot water
Entire building
May 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 2, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Apr 3, 2026 · Apt 2D
Close - Flooring/stairs
Floor
Apr 3, 2026 · Apt 2D
Close - Unsanitary condition
Pests
Mar 23, 2026 · Apt 6EELEV
Close - Flooring/stairs
Floor
Mar 16, 2026 · Apt 2D
Close - Flooring/stairs
Floor
Mar 13, 2026 · Apt 2D
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt 5C
Open - Heat/hot water
Entire building
Jan 25, 2026 · Apt 6A
Open - Heat/hot water
Entire building
Jan 25, 2026 · Apt 1A
Open - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Elevator
Maintenance
Dec 30, 2025 · Apt BLDG
Open - Plumbing
Bathtub/shower
Dec 26, 2025 · Apt 6E
Close - General
Bell/buzzer/intercom
Dec 26, 2025 · Apt 6E
Close - General
Janitor/super
Dec 26, 2025 · Apt 6E
Open - Heat/hot water
Entire building
Dec 26, 2025 · Apt 6E
Open - Heat/hot water
Entire building
Dec 26, 2025 · Apt 1A
Close - Appliance
Electric/gas range
Dec 26, 2025 · Apt 1A
Open - Appliance
Refrigerator
Dec 26, 2025 · Apt 1A
Open - Unsanitary condition
Garbage/recycling storage
Dec 26, 2025 · Apt 6E
Open - Electric
Outlet/switch
Dec 26, 2025 · Apt 6E
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt 6A
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 24, 2025 · Apt BLDG
Open - Elevator
Maintenance
Dec 24, 2025 · Apt BLDG
Open - Door/window
Door
Dec 23, 2025 · Apt 6B
Open - Unsanitary condition
Sewage
Nov 10, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 2, 2025 · Apt 6B
Close - Plumbing
Bathtub/shower
Oct 27, 2025 · Apt 4D
Close - Paint/plaster
Ceiling
Oct 9, 2025 · Apt 2E
Close - Plumbing
Toilet
Sep 5, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Sep 5, 2025 · Apt 2B
Close - Paint/plaster
Wall
Sep 5, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt 1AB
Close - Appliance
Electric/gas range
Aug 13, 2025 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Aug 5, 2025 · Apt BLDG
Close - Elevator
Maintenance
Aug 5, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1920
- Floors
- 6
- Residential units
- 29
- Building area
- 32,342 ft²
- Lot area
- 7,494 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 1726 / 61
- Assessed value
- $622,350
- Landmark / historic district
- No
HPD registration #101287, last renewed Oct 14, 2025.
Questions about 46 West 129 Street
Who owns 46 West 129 Street?
The owner of record in NYC Department of City Planning PLUTO data is West 128th Street L.p..
Does 46 West 129 Street have violations?
Yes. NYC HPD has recorded 131 housing violations at this property.
Is 46 West 129 Street rent stabilized?
NYC Department of Finance tax bills listed 29 rent-stabilized units here in 2024 (about 100% of its 29 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 46 West 129 Street built?
City records list 1920 as the year it was built.
How many apartments are in 46 West 129 Street?
It has 29 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.