roofy

310 East 112 Street

Manhattan, NY 10029BBL 1-01683-0045Map

Owner of record: Boaz 26 LLC

310 East 112 Street is a walk-up apartment building built in 1910 in Manhattan, 10029. It has 23 residential units across 6 floors. The owner of record is Boaz 26 LLC. HPD has recorded 45 housing violations here, most recently on October 10, 2026. 30 of the 45 most recent violations are still open. City tax records listed 22 rent-stabilized apartments here in 2024.

HPD violations
45
DOB violations
2
ECB violations
1
HPD complaints
48

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 10, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
22
About 96% of the building's 23 apartments
Down from 23 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 45

  • B

    Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story

    Oct 10, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system lock door at bioler room at cellar

    Oct 16, 2025

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the floors & stairs at all public halls & stairs throughout

    Oct 16, 2025

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4e, 4th story, 1st apartment from west at north

    Oct 16, 2025 · Apt 4E

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4e, 4th story, 1st apartment from west at north

    Oct 16, 2025 · Apt 4E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinly floor tiles in the 1st room from east located at apt 4e, 4th story, 1st apartment from west at north

    Oct 16, 2025 · Apt 4E

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4e, 4th story, 1st apartment from west at north

    Oct 16, 2025 · Apt 4E

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4e, 4th story, 1st apartment from west at north

    Oct 16, 2025 · Apt 4E

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1d, 2nd story, 3rd apartment from south at west

    Aug 7, 2025 · Apt 1D

    Closed — Violation closed
Show 35 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice located at apt 5e, 6th story, 1st apartment from west at north

    Jul 5, 2017 · Apt 5E

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of pigeon coop at front at fire escape, 4th story

    Jul 5, 2017

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 5e, 6th story, 1st apartment from west at north

    Jul 5, 2017 · Apt 5E

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 5e, 6th story, 1st apartment from west at north

    Jul 5, 2017 · Apt 5E

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 1st room from east located at apt 5e, 6th story, 1st apartment from west at north

    Jul 5, 2017 · Apt 5E

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood saddle in the bathroom located at apt 2e, 3rd story, 1st apartment from west at north

    Jan 17, 2017 · Apt 2E

    Open — Nov sent out
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2e, 3rd story, 1st apartment from west at north

    Jan 17, 2017 · Apt 2E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 2e, 3rd story, 1st apartment from west at north

    Jan 17, 2017 · Apt 2E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 1st story

    Jul 14, 2016

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective fire retardant materials at ceiling and all walls at public hall, 1st story

    Jul 14, 2016

    Open — Not complied with
  • C

    Fire escape defective. replace with new the broken, defective and/or missing - missing 8th tread from bottom at 3rd story fire escape stairs at building north

    Jul 12, 2016

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 2nd story

    Jul 12, 2016

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story

    Jul 12, 2016

    Open — Invalid certification
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at light fixture at ceiling at public hall, 2nd story

    Jul 12, 2016

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling above mailboxes at public hall, 1st story

    Jul 12, 2016

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story

    Jul 12, 2016

    Open — Invalid certification
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rubbish at east yard

    Jun 29, 2010

    Open — Not complied with
  • B

    Properly repair the broken or defective counterbalance at upper sash east window all stys at public hall

    Jun 29, 2010

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 2nd room from east at south located at apt 5a, 6th story, 1st apartment from west at north

    Feb 16, 2005 · Apt 5A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, west wall, 1st window frame from west at north wall in the 2nd room from east at north located at apt 5a, 6th story, 1st apartment from west at north

    Feb 16, 2005 · Apt 5A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the 2nd room from east at north located at apt 2a, 3rd story, 1st apartment from south at west

    Feb 16, 2005 · Apt 2A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west

    Feb 16, 2005 · Apt 2A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 1st room from east at south located at apt 2a, 3rd story, 1st apartment from south at west

    Feb 16, 2005 · Apt 2A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 2nd door frame from south at west wall, north wall, south wall, 1st window frame from west at north wall in the 1st kitchen from east at north located at apt 2a, 3rd story, 1st apartment from south at west

    Feb 16, 2005 · Apt 2A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall, south wall, west wall, 1st window frame from east at south wall in the kitchen located at apt 1b, 2nd story, 1st apartment from east at south

    Feb 16, 2005 · Apt 1B

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 2nd door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from west at north wall in the 1st room from north at west located at apt 1b, 2nd story, 1st apartment from east at south

    Feb 16, 2005 · Apt 1B

    Open — Defect letter issued
  • C

    M/d law abate the nuisance consisting of pad lock on room door to fire escape. in the 1st room from north located at apt 5e, 6th story, 1st apartment from west at north

    Feb 7, 2005 · Apt 5E

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall in the 1st bathroom from north located at apt 1b, 2nd story, 1st apartment from east at south

    Feb 7, 2005 · Apt 1B

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from south at west wall, east wall, west wall, 1st window frame from west at north wall in the 1st room from north at east located at apt 1b, 2nd story, 1st apartment from east at south

    Feb 7, 2005 · Apt 1B

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from east at south wall in the 2nd room from north at east located at apt 1b, 2nd story, 1st apartment from east at south

    Feb 7, 2005 · Apt 1B

    Open — Defect letter issued

DOB building violations · 2

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 30, 1997

    Dob violation - active

ECB violations · 1

  • Class - 2

    Failure to maintain building in a code compliant manner.note:public hafway excessive dust and debris,hue to plaster and painting operations.rem:clean public hallway and maintain.

    Feb 3, 2018

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 7, 2026 · Apt BLDG

    Open
  • Flooring/stairs

    Floor

    Dec 10, 2025 · Apt 4E

    Open
  • Plumbing

    Water supply

    Dec 10, 2025 · Apt 4E

    Open
  • Heat/hot water

    Entire building

    Oct 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2025 · Apt 4E

    Close
  • Unsanitary condition

    Pests

    Aug 1, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Mold

    Aug 1, 2025 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Apr 22, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 22, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 12, 2025 · Apt 1C

    Close
Show 38 more ↓
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Mar 12, 2025 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 27, 2025 · Apt 2C2D

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2024 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Jan 11, 2023 · Apt ENTIRE

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2018 · Apt 5E

    Close
  • Electric

    No lighting

    Aug 1, 2017 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jun 30, 2017 · Apt 5E

    Close
  • Appliance

    Electric/gas range

    Jun 30, 2017 · Apt 5E

    Close
  • Plumbing

    Basin/sink

    Jan 10, 2017 · Apt 2E

    Close
  • Paint/plaster

    Wall

    Jan 10, 2017 · Apt 2E

    Close
  • Flooring/stairs

    Floor

    Jan 10, 2017 · Apt 2E

    Close
  • Unsanitary condition

    Pests

    Jan 10, 2017 · Apt 2E

    Close
  • Door/window

    Door frame

    Jan 10, 2017 · Apt 2E

    Close
  • Plumbing

    Radiator

    Jan 10, 2017 · Apt 2E

    Close
  • Flooring/stairs

    Floor

    Jan 10, 2017 · Apt 2E

    Close
  • Electric

    No lighting

    Jul 7, 2016 · Apt 1A

    Close
  • Electric

    Power outage

    Feb 12, 2016 · Apt 5E

    Close
  • Heat/hot water

    Apartment only

    Feb 12, 2016 · Apt 5E

    Close
  • Heating

    Heat related

    Apr 13, 2012 · Apt 4C

    Close
  • Electric

    Electric-supply

    Feb 11, 2011 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Dec 22, 2009 · Apt 2CD

    Close
  • Paint/plaster

    Radiator

    Dec 22, 2009 · Apt 2CD

    Close
  • Paint/plaster

    Radiator

    Dec 22, 2009 · Apt 2CD

    Close
  • Paint/plaster

    Wall

    Nov 17, 2009 · Apt 2CD

    Close
  • General

    Floor

    Sep 29, 2005 · Apt 2B

    Close
  • General

    Floor

    Sep 29, 2005 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Apr 11, 2005 · Apt BB

    Close
  • Paint/plaster

    Wall

    Apr 11, 2005 · Apt BB

    Close
  • Plumbing

    Water-leaks

    Apr 11, 2005 · Apt BB

    Close
  • Paint/plaster

    Wall

    Apr 11, 2005 · Apt BB

    Close
  • Plumbing

    Water-leaks

    Apr 11, 2005 · Apt BB

    Close
  • General

    Floor

    Apr 11, 2005 · Apt BB

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1910
Floors
6
Residential units
23
Building area
19,005 ft²
Lot area
4,289 ft²
Zoning
R7A
Community board
111
Council district
8
Block / lot
1683 / 45
Assessed value
$426,600
Landmark / historic district
No

HPD registration #112886, last renewed Aug 14, 2025.

Questions about 310 East 112 Street

Who owns 310 East 112 Street?

The owner of record in NYC Department of City Planning PLUTO data is Boaz 26 LLC.

Does 310 East 112 Street have violations?

Yes. NYC HPD has recorded 45 housing violations at this property.

Is 310 East 112 Street rent stabilized?

NYC Department of Finance tax bills listed 22 rent-stabilized units here in 2024 (about 96% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 310 East 112 Street built?

City records list 1910 as the year it was built.

How many apartments are in 310 East 112 Street?

It has 23 residential units and 25 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.