305 East 111 Street
Manhattan, NY 10029BBL 1-01683-0005Map
Owner of record: Wcg Associates 111 Street LLC
305 East 111 Street is a walk-up apartment building built in 1900 in Manhattan, 10029. It has 8 residential units across 4 floors. The owner of record is Wcg Associates 111 Street LLC. HPD has recorded 20 housing violations here, most recently on April 1, 2021. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 20
- DOB violations
- 4
- ECB violations
- 6
- HPD complaints
- 77
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system no location for super at public hall, 1st story
Feb 25, 2020
Closed — Violation dismissed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the garbage stored under window of apt. 1a# at front areaway, 1st story
Sep 27, 2017
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Mar 31, 2017 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic base board tiles at north and west walls in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south
Mar 31, 2017 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south
Mar 31, 2017 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south
Mar 31, 2017 · Apt 2A
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in the bathtub waste line in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north
Oct 14, 2016 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balances at lower sash at 2nd window from west at north wall in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from west at north
May 2, 2016 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balances at lower sash at first window from west at north wall in the 1st room from north at west located at apt 2b, 2nd story, 1st apartment from west at north
May 2, 2016 · Apt 2B
Closed — Violation closed
Show 10 more ↓
- BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at vestibule at public hall, 1st story
May 2, 2016
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hardwood floor need resealing and refinishing after flood in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north
Mar 20, 2014 · Apt 2B
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor tiles in the 1st room from north at west located at apt 2b, 2nd story, 1st apartment from west at north
Mar 13, 2014 · Apt 2B
Closed — Violation closed - BHazardous
Remove the illegal fastening key operated lock at the door leading to the fire escape in the 1st room from north at east located at apt 3b, 3rd story, 1st apartment from west at north
Dec 12, 2013 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Jan 14, 2013 · Apt 1A
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Jan 14, 2013 · Apt 1A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets .. in the entire apartment located at apt 3b, 3rd story
Jun 18, 2012 · Apt 3B
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ;; in the 1st bathroom from east located at apt 2b, 2nd story
Sep 30, 2009 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color water damaged ceiling in the bathroom located at apt 2b, 2nd story, apartment at north
Jan 6, 2004 · Apt 2B
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of ...air conditioner protruding on sill of east window at 4th story front fire escape balcony
Aug 1, 2003
Closed — Violation closed
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 6
- Class - 2
As per one hw slant/fin boiler; boiler leaking from top of section-domestic hw piping corroded-boiler room door knob missing-no thermometer on hot water piping.
Apr 26, 2023 · Penalty $312
Active - Class - 2
Failure to maintain bldg wall(s) or appurtenances. defects noted: at time of inspection step cracks are observed above 3rd and 4th flr windows at exp 1, front of bldg (left side front). crack in brick observed
Nov 9, 2010 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior building wall. noted west facade, brick wall with cement stucco near roof level, cement missing approx. 3 feet x 5 feet with missing pieces of brick. also noted same wall cracked
May 2, 2003 · Penalty $2,500
Active - Non-hazardous
Failure to maintain exterior building wall. noted: pieces or stacco falling of roof of adjacent xxxxx building at 303 e 111 st. remedy: maintain exterior building wall. repair broken stacco wall immediately.
Mar 10, 2003
Resolve - Non-hazardous
Failure to maintain exterior building wall: defect is: defective missing & crack's in cement/ stucco facade. exterior exposed west wall next to adjacent commercial area in question between 4th floor & roof fro
Jul 3, 1997 · Penalty $1,000
Resolve - Hazardous
Failure to maintain exterior bldg walls hazardous party wall with 307 e 111 st has a vertical crack from the 1st floor to the roof approx 2"rear of bldg at yard level facade is bulged approx. 6" and in bsmt sam
Mar 30, 1993 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Apr 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 9, 2024 · Apt 1A
Close - Heat/hot water
Entire building
Oct 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2023 · Apt BLDG
Close - Appliance
Refrigerator
Aug 12, 2021 · Apt 4A
Close - Appliance
Refrigerator
Aug 11, 2021 · Apt 4A
Close - Appliance
Refrigerator
Aug 11, 2021 · Apt 4A
Close - Appliance
Refrigerator
Dec 10, 2020 · Apt 2A
Close - Electric
Wiring
Sep 6, 2018 · Apt 2B
Close - Electric
Lighting
Sep 6, 2018 · Apt 2A
Close - Heat/hot water
Entire building
Jan 29, 2018 · Apt 3B
Close - Unsanitary condition
Sewage
Nov 1, 2017 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Sep 18, 2017 · Apt 1A
Close - Paint/plaster
Wall
Mar 27, 2017 · Apt 2A
Close - General
Signage missing
Mar 27, 2017 · Apt 2A
Close - General
Janitor/super
Mar 27, 2017 · Apt 2A
Close - Flooring/stairs
Floor
Mar 27, 2017 · Apt 2A
Close - Flooring/stairs
Floor
Mar 27, 2017 · Apt 2A
Close - Paint/plaster
Wall
Mar 27, 2017 · Apt 2A
Close - Unsanitary condition
Pests
Mar 27, 2017 · Apt 2A
Close - Unsanitary condition
Sewage
Mar 27, 2017 · Apt 2A
Close - Plumbing
Toilet
Mar 27, 2017 · Apt 2A
Close - Plumbing
Toilet
Mar 21, 2017 · Apt 2A
Close - Heat/hot water
Apartment only
May 1, 2016 · Apt 2B
Close - Plumbing
Bathtub/shower
Apr 28, 2016 · Apt 2B
Close - Water leak
Damp spot
Apr 28, 2016 · Apt 2B
Close - Heat/hot water
Entire building
Feb 13, 2015 · Apt 3B
Close - Flooring/stairs
Floor
Mar 13, 2014 · Apt 2B
Close - General
Floor
Jan 23, 2014 · Apt 2B
Close - General
Floor
Jan 23, 2014 · Apt 2B
Close - Nonconst
Vermin
Jan 23, 2014 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1900
- Floors
- 4
- Residential units
- 8
- Building area
- 7,223 ft²
- Lot area
- 2,733 ft²
- Zoning
- R7A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1683 / 5
- Assessed value
- $288,900
- Landmark / historic district
- No
HPD registration #135687, last renewed Sep 10, 2025.
Questions about 305 East 111 Street
Who owns 305 East 111 Street?
The owner of record in NYC Department of City Planning PLUTO data is Wcg Associates 111 Street LLC.
Does 305 East 111 Street have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 305 East 111 Street rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 305 East 111 Street built?
City records list 1900 as the year it was built.
How many apartments are in 305 East 111 Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.