2015 1 Avenue
Manhattan, NY 10029BBL 1-01675-0029Map
Owner of record: 2015 1st Avenue NYC Realty, INC.
2015 1 Avenue is a walk-up apartment building built in 1920 in Manhattan, 10029. It has 12 residential units across 6 floors. The owner of record is 2015 1st Avenue NYC Realty, INC.. HPD has recorded 50 housing violations here, most recently on August 7, 2026. 14 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 50
- DOB violations
- 13
- ECB violations
- 8
- HPD complaints
- 110
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 50
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4c, 4th story, 1st apartment from east at south
Aug 7, 2026 · Apt 4C
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 4c, 4th story, 1st apartment from east at south
Aug 7, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wall cabinet at south wall in the kitchen located at apt 4c, 4th story, 1st apartment from east at south
Aug 7, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Aug 7, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4c, 4th story, 1st apartment from east at south
Aug 7, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 13, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lockset installed at vestibule door to public hall , 1st story
Feb 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing the door sweep installed at door in the entrance located at apt 3c, 3rd story, 1st apartment from east at south
Jan 10, 2024 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in bulkhead in the public hall stairs located at public parts, 6th story
Jan 10, 2024
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of furnitures at public hall, 6th story
Jan 10, 2024
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Oct 6, 2023 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 6, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Oct 6, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 6, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 6, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 6, 2023
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 6, 2023
Closed — Violation dismissed - ANon-hazardous
Refit 1st door from west at north at public hall, 1st story
Feb 6, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st door from west at north at public hall, 1st story
Feb 6, 2023
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective electrical outlet at south wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east
Aug 3, 2019 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective electrical outlet at east wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east
Aug 3, 2019 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 3a, 3rd story, 1st apartment from north at east
Aug 3, 2019 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant materail at all walls at public hall, 1st story
Aug 3, 2019
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 3, 2019
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls at public hall, 1st story
Aug 3, 2019
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following consisting of 100 watts incandescent or equivalent, no light fixture present
Dec 5, 2018
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Mar 28, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor - missing at public hall, 1st story
Nov 14, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 14, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 9, 2015
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods .. at 1st fire escape from north at west, 2nd story
Jun 9, 2015
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jun 9, 2015
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of rodents rats north court yard
Jun 9, 2015
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north court yard
Jun 9, 2015
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Feb 23, 2015 · Apt 6B
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Feb 23, 2015 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder in front of building at fire escape
Mar 18, 2010
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
Apr 5, 2002 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of concealed water leak ceiling in the bathroom located at apt 1b, 3rd story, 1st apartment from north at east
Sep 26, 2001 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1b, 3rd story, 1st apartment from north at east
Sep 26, 2001 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Sep 12, 2000 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling, east wall in the bathroom located at apt 1b, 3rd story, 1st apartment from north at east
Aug 17, 2000 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. east wall, east riser in the 1st room from east at south located at apt 1b, 3rd story, 1st apartment from north at east
Aug 17, 2000 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the 3rd room from east at north located at apt 1b, 3rd story, 1st apartment from north at east
Aug 17, 2000 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. west wall in the 1st room from east at north located at apt 1b, 3rd story, 1st apartment from north at east
Aug 17, 2000 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective metal ceiling in the 1st room from north located at apt 3c, 3rd story, apartment at east
Dec 24, 1999 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Provide dwelling with a janitor or responsible person or janitorial service. at public hall, 1st story
Dec 24, 1999
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets kitchen sink 2 sty front south apt 2b. located at apt 2b, 2nd story, section '' ''
Sep 29, 1999 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sheetrock bathroom ceiling 2 sty front south apt 2b. located at apt 2b, 2nd story, section '' ''
Sep 29, 1999 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked.
Jun 1, 1993
Closed — Violation dismissed
DOB building violations · 13
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 11, 2022
Dob violation - dismissed - Emergency none
Install approximately 25 linear feet of sidewalk shed along exposure #1 (1st avenue). add additional 5 linear feet of sidewalk shed to overlap adjacent properties to safeguard the public and property
Mar 18, 2022
Dob violation - dismissed - Construction other optional
Structure rendered non-complaint . at time of inspection observed at exposure#3 fire escape clear passageway obstructed due to active/ongoing construction work at 2017 1 avenue manhattan.
Feb 7, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 14, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 8
- Class - 1
Failure to maintain building in code compliant matter. noted: defective facade at exp-1 with cracks at masonry lentil on 3rd floor left window and cracked masonry window sills at 5th and 6th windows., repair an
Mar 17, 2022 · Penalty $1,250
Resolve - Class - 1
At exp#1 and 3 fire escape clear passageway obstructed by household items. exit door in disrepair conditions., remove obstruction
Feb 7, 2022 · Penalty $1,280
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35374977h issued on 02-06-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Mar 28, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner. at exposure #1 there are multiple cracks/chips in facade at second floor. remedy: repair and/or replace
Feb 6, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35153159r issued on 10/14/14. work w/o a permit: extend existing 1st fl space into backyard. install new door leading to 2017 1st
Jan 22, 2015
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35153159r issued on 10/14/14. extend existing 1st fl comm'l space,into back yard & also installed new door leading 2017 1st ave emp
Dec 11, 2014
Resolve - Class - 1
Work w/o a permit.work noted approx.12'x 10'horizontal exterior of existing retail commercial store was done in rear yard & using space as stoarage.also installed door leading to 2117 1st ave open lot.also exca
Oct 14, 2014
Resolve - Non-hazardous
49 no key on premises inable to acess boiler room
Mar 4, 1999 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Mold
Jul 30, 2026 · Apt 4C
Close - General
Cabinet
Jul 30, 2026 · Apt 4C
Close - Plumbing
Basin/sink
Jul 30, 2026 · Apt 4C
Close - Water leak
Heavy flow
Jul 30, 2026 · Apt 4C
Close - Paint/plaster
Wall
Jul 30, 2026 · Apt 4C
Close - Unsanitary condition
Garbage/recycling storage
Jun 8, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 25, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 18, 2026 · Apt BLDG
Close - General
Signage missing
Feb 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 10, 2025 · Apt 2A
Close - Door/window
Door
Jul 25, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Jun 3, 2025 · Apt 2A
Close - Safety
Smoke detector
Jun 3, 2025 · Apt 2A
Close - Heat/hot water
Entire building
May 29, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
May 18, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
May 18, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
May 17, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Apr 12, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jun 27, 2024 · Apt 2A
Close - Line of travel
Line of travel
Jan 11, 2024 · Apt 3C
Close - Line of travel
Line of travel
Jan 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2023 · Apt BLDG
Close - Electric
Outlet/switch
Jul 24, 2019 · Apt 3A
Close - Plumbing
Water supply
Oct 26, 2018 · Apt 6B
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt 3A
Close - Heat/hot water
Entire building
Nov 9, 2017 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Apr 9, 2015 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 20, 2015 · Apt 6B
Close - Unsanitary condition
Pests
Feb 20, 2015 · Apt 6B
Close - Heat/hot water
Apartment only
Feb 20, 2015 · Apt 6B
Close - Heat/hot water
Apartment only
Nov 1, 2014 · Apt 3A
Close - Heat/hot water
Entire building
Oct 21, 2014 · Apt 6A
Close - Door/window
Door
Jul 19, 2014 · Apt BLDG
Close - Electric
Bell-buzzer/intercom
Mar 18, 2011 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 12
- Building area
- 14,875 ft²
- Lot area
- 2,525 ft²
- Zoning
- R8A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1675 / 29
- Assessed value
- $873,450
- Landmark / historic district
- No
HPD registration #136812, last renewed Sep 12, 2025.
Questions about 2015 1 Avenue
Who owns 2015 1 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2015 1st Avenue NYC Realty, INC..
Does 2015 1 Avenue have violations?
Yes. NYC HPD has recorded 50 housing violations at this property.
Is 2015 1 Avenue rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 100% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2015 1 Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 2015 1 Avenue?
It has 12 residential units and 13 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.