314 East 100 Street
Manhattan, NY 10029BBL 1-01671-0039Map
Owner of record: NYC Housing Authority
314 East 100 Street is a walk-up apartment building built in 1925 in Manhattan, 10029. It has 80 residential units across 6 floors. The owner of record is NYC Housing Authority. HPD has recorded 106 housing violations here, most recently on September 15, 2025. 9 of the 50 most recent violations are still open. City tax records listed 81 rent-stabilized apartments here in 2024.
- HPD violations
- 106
- DOB violations
- 28
- ECB violations
- 25
- HPD complaints
- 187
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 106
- CImmediately hazardous
Properly repair with similar material the broken or defective lifting laminate wood floors in the private hallway located at apt 4l, 4th story, 1st apartment from east at south
Sep 15, 2025 · Apt 4L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at celing and east wall in the 1st bathroom from east located at apt 4l, 4th story, 1st apartment from east at south
Sep 15, 2025 · Apt 4L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall and west walls at public hall stairs, 2nd story
Sep 23, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Aug 6, 2024 · Apt 2D
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... approx 9 sq ft south wall in closet in the foyer located at apt 1g, 1st story, 5th apartment from west at north original violation 17034428 issued 08-jun-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 8, 2024 · Apt 1G
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... approx 9 sq ft on south wall in closet in the 2nd room from east located at apt 1g, 1st story, 5th apartment from west at north original violation 17034425 issued 08-jun-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 8, 2024 · Apt 1G
Open — Defect letter issued - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 1g, 1st story, 5th apartment from west at north
Jun 8, 2024 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 9 sq ft south wall in closet in the foyer located at apt 1g, 1st story, 5th apartment from west at north
Jun 8, 2024 · Apt 1G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyer located at apt 1g, 1st story, 5th apartment from west at north
Jun 8, 2024 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 9 sq ft on south wall in closet in the 2nd room from east located at apt 1g, 1st story, 5th apartment from west at north
Jun 8, 2024 · Apt 1G
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 1g, 1st story, 5th apartment from west at north
Jun 8, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1g, 1st story, 5th apartment from west at north
Jun 8, 2024 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1g, 1st story, 5th apartment from west at north
Jun 8, 2024 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north
Feb 1, 2024 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2h, 2nd story, 5th apartment from west at north
Feb 1, 2024 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2h, 2nd story, 5th apartment from west at north
Feb 1, 2024 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 5th apartment from east at south
Jan 13, 2024 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 5th apartment from east at south
Jan 13, 2024 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2k, 2nd story, 5th apartment from north at east
Sep 29, 2023 · Apt 2K
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Sep 26, 2023 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1g, 1st story
Mar 8, 2023 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story
Mar 8, 2023 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1g, 1st story
Mar 8, 2023 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story
Mar 8, 2023 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm at 1st door from south at public hall, 1st story
Feb 11, 2023
Closed — Violation closed - ANon-hazardous
Refit 1st door from south at west wall at public hall, 1st story
Feb 11, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 1l, 1st story, 3rd apartment from east at south
Jan 16, 2023 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Jan 11, 2023 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 7, 2023 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 7, 2023
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallway located at apt 2k, 2nd story, 5th apartment from north at east
Jul 27, 2022 · Apt 2K
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2k, 2nd story, 5th apartment from north at east
Jul 27, 2022 · Apt 2K
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood baseboard molding in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north
Jul 27, 2022 · Apt 2D
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 18, 2022
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3c, 3rd story, 7th apartment from east at south
Jul 11, 2022 · Apt 3C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 3c, 3rd story, 7th apartment from east at south
Jul 11, 2022 · Apt 3C
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the south wall closet in the private hallway located at apt 1g, 1st story, 2nd apartment from west at north
Jul 11, 2022 · Apt 1G
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wooden bottom panel at north wall base cabinet in the kitchen located at apt 1g, 1st story, 2nd apartment from west at north
Jul 11, 2022 · Apt 1G
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood wash basin cabinet in the bathroom located at apt 1g, 1st story, 2nd apartment from west at north
Jul 11, 2022 · Apt 1G
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system at roof at boiler room
Jun 10, 2022
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the kitchen located at apt 2b, 2nd story, 2nd apartment from east at south , section ''west''
Jun 10, 2022 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 2nd apartment from east at south , section ''west''
Jun 10, 2022 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
May 4, 2022 · Apt 2D
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective wood floor at walk area in the foyer located at apt 2d, 2nd story, 1st apartment from east at south
May 4, 2022 · Apt 2D
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective drawer at base cabinet in the kitchen located at apt 2d, 2nd story, 1st apartment from east at south
May 4, 2022 · Apt 2D
Closed — Violation closed - ANon-hazardous
Replace with new the missing door at closet in the foyer located at apt 2d, 2nd story, 1st apartment from east at south
May 4, 2022 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor at walk area in the private hallway located at apt 2d, 2nd story, 1st apartment from east at south
May 4, 2022 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Feb 12, 2022 · Apt 3D
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... at wash basin cabinet in the bathroom located at apt 1g, 1st story, 5th apartment from west at north original violation 14735075 issued 20-dec-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Dec 20, 2021 · Apt 1G
Open — Defect letter issued - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1g, 1st story, 5th apartment from west at north
Dec 20, 2021 · Apt 1G
Closed — Violation closed
DOB building violations · 28
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8c technical report by 02/21/2019
Apr 30, 2019
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8c technical report by 02/21/2019
Apr 30, 2019
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8c technical report by 02/21/2019
Apr 30, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2017
Dob violation - resolved
Show 18 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Sep 28, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 25
- Class - 2
Failure to submit an acceptable required cycle 6, 7c and 8c report of critcial exmination documenting condition of exteiro rwall and appurtenances required b y28-302.4 for control #806080.submit acceptable requ
Jan 22, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 6, 7c and 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #806082 submit acceptable req
Jan 22, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptible required cycle 6, 7c and 8c report of critical exmination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #806081.,submit acceptable req
Jan 22, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required 6, 7c and 8c report of criticla exmination documenting condition of exteiror wal and appuretannces required by 28-302.4 for control #806083 submit acceptable required t
Jan 22, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #706080.rem:submit required technical report.
Mar 7, 2018
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #706081.rem:submit required technical report.
Mar 7, 2018
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #706083.rem:submit required technical report.
Mar 7, 2018
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #706082.rem:submit required technical report.
Mar 7, 2018
Resolve - Class - 2
B265. as per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
Jan 9, 2017
Resolve - Class - 2
B265. as per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
Jan 9, 2017
Resolve
Show 15 more ↓
- Class - 2
Failure to maintain exterior bldg north elev exp1 second floor continuous window sill cracked and window keystones crazing sealant missing ground fl - crack in 6 fl masonry ban - 1st flr vertical joints not bo
Nov 1, 2016
Resolve - Class - 2
Failure to maintain exterior bldg north elev exp#1-front entrance door glass broken-cracken window keystone @ window headers-1st flr masonrychipped. south elev exp#3-spalling brick throughout-passageway from re
Aug 4, 2016
Resolve - Class - 2
Failure to maintain exterior bldg north elev. exp#1- west side 2nd & 3rd flr decorative window keystones cracked in multiple windows- 2nd flr horizontal ban chipped & cracking- step cracks between 3rd & 4th flr
Apr 20, 2016
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of buildings rules &
Jan 25, 2011
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of buildings rules &
Jan 25, 2011
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of buildings rules &
Jan 25, 2011
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of buildings rules &
Jan 25, 2011
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
Jun 4, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
Jun 4, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
Jun 4, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations
Jun 4, 2010
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Dec 19, 2008
Resolve
Complaints
- Heat/hot water
Entire building
Sep 13, 2026 · Apt 4C
Close - Unsanitary condition
Garbage/recycling storage
Apr 13, 2026 · Apt BLDG
Close - Water leak
Damp spot
Feb 9, 2026 · Apt 4C
Close - Flooring/stairs
Floor
Feb 9, 2026 · Apt 4C
Close - Appliance
Electric/gas range
Feb 9, 2026 · Apt 4C
Close - Water leak
Slow leak
Feb 9, 2026 · Apt 4C
Close - Unsanitary condition
Mold
Feb 9, 2026 · Apt 4C
Close - Unsanitary condition
Pests
Feb 9, 2026 · Apt 4C
Close - Unsanitary condition
Pests
Feb 9, 2026 · Apt 4C
Close - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 1L
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 3, 2026 · Apt 1L
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 22, 2025 · Apt 4L
Close - Heat/hot water
Entire building
Mar 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Nov 5, 2024 · Apt 6F
Close - Unsanitary condition
Garbage/recycling storage
Sep 9, 2024 · Apt ALLFLO
Close - Unsanitary condition
Pests
Sep 9, 2024 · Apt ALLFLO
Close - Unsanitary condition
Pests
Sep 9, 2024 · Apt ALLFLO
Close - Electric
No lighting
Aug 28, 2024 · Apt 7E
Close - Paint/plaster
Wall
Aug 6, 2024 · Apt 2N
Close - Unsanitary condition
Garbage/recycling storage
Aug 6, 2024 · Apt 2N
Close - Unsanitary condition
Pests
Jul 25, 2024 · Apt 2D
Close - Water leak
Damp spot
Jun 5, 2024 · Apt 1G
Close - Unsanitary condition
Mold
Jun 5, 2024 · Apt 1G
Close - Flooring/stairs
Floor
Jun 5, 2024 · Apt 1G
Close - Appliance
Electric/gas range
Feb 28, 2024 · Apt 3P
Close - Appliance
Electric/gas range
Feb 27, 2024 · Apt 3P
Close - Heat/hot water
Apartment only
Jan 13, 2024 · Apt 2K
Close - Heat/hot water
Apartment only
Jan 11, 2024 · Apt 2B
Close - Heat/hot water
Entire building
Jan 9, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Jan 4, 2024 · Apt 4L
Close - Heat/hot water
Apartment only
Dec 9, 2023 · Apt 1L
Close - Unsanitary condition
Pests
Nov 8, 2023 · Apt 3D
Close - Paint/plaster
Wall
Nov 8, 2023 · Apt 3D
Close - Plumbing
Bathtub/shower
Oct 31, 2023 · Apt 5E
Close - Unsanitary condition
Pests
Sep 21, 2023 · Apt 2D
Close - Unsanitary condition
Pests
Sep 18, 2023 · Apt 2D
Close - Unsanitary condition
Garbage/recycling storage
Jul 9, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 9, 2023 · Apt BLDG
Close - Flooring/stairs
Floor
Apr 29, 2023 · Apt 2N
Close - Unsanitary condition
Garbage/recycling storage
Apr 29, 2023 · Apt 2N
Close - Plumbing
Toilet
Feb 1, 2023 · Apt 4L
Close - Heat/hot water
Apartment only
Jan 16, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Jan 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1925
- Floors
- 6
- Residential units
- 80
- Building area
- 112,171 ft²
- Lot area
- 24,892 ft²
- Zoning
- R7A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1671 / 39
- Assessed value
- $2,886,750
- Landmark / historic district
- No
HPD registration #143475, last renewed Aug 1, 2025.
Questions about 314 East 100 Street
Who owns 314 East 100 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 314 East 100 Street have violations?
Yes. NYC HPD has recorded 106 housing violations at this property.
Is 314 East 100 Street rent stabilized?
NYC Department of Finance tax bills listed 81 rent-stabilized units here in 2024 (about 100% of its 80 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 314 East 100 Street built?
City records list 1925 as the year it was built.
How many apartments are in 314 East 100 Street?
It has 80 residential units and 81 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.