221 East 117 Street
Manhattan, NY 10035BBL 1-01667-0011Map
Owner of record: 221 East 117th Street LLC
221 East 117 Street is an elevator apartment building built in 2023 in Manhattan, 10035. It has 12 residential units across 6 floors. The owner of record is 221 East 117th Street LLC. HPD has recorded 1 housing violation here, most recently on June 16, 2025. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 1
- DOB violations
- 0
- ECB violations
- 19
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 19
- Class - 1
Active construction site, exterior work in progress, it was noted that the roof protection to the adjacent building at exp#2 &4 was inadequate only approximate 6 to 8 feet in place, code states that at least 20
Jun 17, 2022 · Penalty $2,500
Resolve - Class - 2
At the time of inspection observed 6 story building under construction, active works site, reviewing the plans at site it was noted that sidewalk shed not erected as per plans, no detail for the catch at exp#1,
Jun 17, 2022 · Penalty $625
Resolve - Class - 1
Active works site, failed to maintain/ erect supported scaffold as per code 1) scaffold pins missing on number of location2) deck not fully planked,3) end rails and guard rails missing at number of location, 4)
Jun 17, 2022 · Penalty $2,500
Resolve - Class - 2
Active construction site, supported scaffold on the top of sidewalk shed at exp#1, when asked for load imposed letter, none was made available by the competent person at site
Jun 17, 2022
Resolve - Class - 2
Side walk shed at exp#1 observed active staging work on the sidewalk, bench saw, mortar mixing container, bricks on top of sidewalk shed, reviewing the approved sws plans, it was noted that the sidewalk shed wa
Jun 17, 2022
Resolve - Class - 2
Exterior walls on exposure 1 from 1st. to 6th. floor were installed with cmu walls contrary to metal framed walls indicated on comcheck and exterior walls details as per plans., conform work to approved constru
Nov 24, 2021
Resolve - Class - 2
Jobsite fence not maintained.at time of inspection on a 6 story new building jobsite,i observed a jobsite fence installed at exp1 not being maintained as per code.not painted hunter green,missing plexiglass on
Nov 8, 2021
Resolve - Class - 2
Bc3314.1 supported scaffold not maintained.at time of inspection of proposed 6 story new building observed loose netting at exp #1 over scaffold loose planks at scaffold at exp #3 without guardrails missing det
Sep 23, 2021
Resolve - Class - 2
Construction superintendent failed to do duties as per code.at time of inspection of proposed 6 story new building observed inadequate suspended scaffold mantainance loose netting loose planks without guardrail
Sep 23, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain safety operations.at time of inspection of proposed 6 story new building observed mechanical portion in each floor has duct line and gap 2' x 2' and no caz at this section to control area ob
Sep 23, 2021 · Penalty $2,500
Resolve
Show 9 more ↓
- Class - 2
Housekeeping.at time of inspection of proposed 6 story building observed a lot of dust and debris material all over floor and wood and plastic material at rear yards risking fire and affect adj bldg.remedy:prov
Sep 23, 2021
Resolve - Class - 1
3301.2 failure to maintain safety measures (fall protection)at time of inspection of proposed 6 story bldg observed workers working on cold form steel erecting/installing material on roof lvl without tieback or
Sep 23, 2021 · Penalty $2,500
Resolve - Class - 2
Storage on sws.at time of inspection of proposed 6 story new building observed sws erected at exp #1,#2 with supported scaffold erected over sidewalk steel.observed storage material on sws at exp #1 and a lot o
Sep 23, 2021 · Penalty $2,400
Resolve - Class - 2
Failure to provide approved plans on site:at time of inspection of proposed 6 story new building observed cold form steel work at basement lvl showing stefner not fully embeded in cmu wall as well foundation wa
Sep 23, 2021
Resolve - Class - 2
Bc3301.7-failure to maintain.display on site document required by bc chapter 33.at the time of my inspection at 6 story building .i requested 6 month installation report and daily inspection check list report f
Jun 21, 2021
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of requiredof means of egress for every floor per bc1091.1.at time of inspection of this 6 story building under construction,i observed extension ladde
Jun 1, 2021
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails.at time of inspection of this 6 story building under construction,i observed no guardrails on the 6th floor stairc
Jun 1, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to maintain adequate housekepping per section requirements.at time of inspection at a 6 story nb,i observed on the ground/cellar level material.debris and garbage all throughout,job site scadder through
Oct 6, 2020
Resolve - Class - 2
Work does not conform to approved construction documents and/or amendments structural/framing plans.at time of inspection at a 6 story nb,i observed on the street/cellar level steel beams welded to steel plates
Oct 6, 2020
Resolve
Complaints
- Heat/hot water
Entire building
Apr 24, 2024 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2023
- Floors
- 6
- Residential units
- 12
- Building area
- 11,327 ft²
- Lot area
- 2,523 ft²
- Zoning
- R7A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1667 / 11
- Assessed value
- $2,102,400
- Landmark / historic district
- No
HPD registration #145173, last renewed Aug 22, 2025.
Questions about 221 East 117 Street
Who owns 221 East 117 Street?
The owner of record in NYC Department of City Planning PLUTO data is 221 East 117th Street LLC.
Does 221 East 117 Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 221 East 117 Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 75% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 221 East 117 Street built?
City records list 2023 as the year it was built.
How many apartments are in 221 East 117 Street?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.