roofy

166 East 107 Street

Manhattan, NY 10029BBL 1-01634-0043Map

Owner of record: Ross And Ross LLC

166 East 107 Street is a walk-up apartment building built in 1910 in Manhattan, 10029. It has 8 residential units across 4 floors. The owner of record is Ross And Ross LLC. HPD has recorded 36 housing violations here, most recently on August 19, 2025. 33 of the 36 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.

HPD violations
36
DOB violations
2
ECB violations
4
HPD complaints
62

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 19, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
8
About 100% of the building's 8 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 36

  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags at building front yard

    Aug 19, 2025

    Open — Nov sent out
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Aug 19, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south

    Nov 25, 2024 · Apt 1B

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south

    Nov 25, 2024 · Apt 1B

    Open — Notice of issuance sent to tenant
  • C

    M/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees at all hot fixtures in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south

    Nov 25, 2024 · Apt 1B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective door and frame at vestibule door at public hall, 1st story

    Nov 25, 2024

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Dec 6, 2016 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Dec 6, 2016 · Apt 3A

    Closed — Violation dismissed
  • C

    Properly secure the loose ceiling light fixture in the 2nd room from north located at apt 1a, 1st story, 1st apartment from east at south

    Apr 23, 2009 · Apt 1A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, south wall, east wall, west wall in the 2nd room from north located at apt 1b, 1st story, 2nd apartment from east at south

    Apr 13, 2005 · Apt 1B

    Open — First no access to re- inspect violation
Show 26 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall, 1st door frame from east at south wall in the 3rd room from north located at apt 1b, 1st story, 2nd apartment from east at south

    Apr 13, 2005 · Apt 1B

    Open — First no access to re- inspect violation
  • A

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration accoustic tile ceiling in the 4th room from north located at apt 1b, 1st story, 2nd apartment from east at south

    Apr 13, 2005 · Apt 1B

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, ceiling in the 6th kitchen from north located at apt 1b, 1st story, 2nd apartment from east at south

    Apr 13, 2005 · Apt 1B

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south

    Apr 13, 2005 · Apt 1B

    Open — First no access to re- inspect violation
  • A

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the 4th room from north located at apt 1b, 1st story, 2nd apartment from east at south

    Apr 13, 2005 · Apt 1B

    Open — First no access to re- inspect violation
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate , in the kitchen located at apt 1b, 1st story, 2nd apartment from east at south

    Apr 13, 2005 · Apt 1B

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceilings, in the entire apartment located at apt 1e, 1st story, 2nd apartment from east at south

    Jul 21, 2003 · Apt 1E

    Open — First no access to re- inspect violation
  • A

    Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the rear yard

    Oct 2, 2002

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department ceiling at public hall, 2nd story

    Jul 5, 2001

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system on boiler room door and 1sty at public hall

    Jul 5, 2001

    Open — Not complied with
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall

    Jul 5, 2001

    Open — Not complied with
  • B

    Arrange and make self-closing the doors entrance at public hall bulkhead, roof

    Jul 5, 2001

    Open — Not complied with
  • B

    Repair or replace the smoke detector missing, ms cedillo, in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jun 5, 2000 · Apt 1A

    Open — Not complied with
  • B

    Remove all encumbrances consisting of shelves and other household items.1st.story at public hall

    May 11, 2000

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. south wall in the 2nd room from north at east located at apt 1a, 1st story, 1st apartment from east at south

    Mar 2, 2000 · Apt 1A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling, south wall in the 4th room from north at west located at apt 1a, 1st story, 1st apartment from east at south

    Mar 2, 2000 · Apt 1A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. south wall, ceiling, west wall at west in the private hallway located at apt 1a, 1st story, 1st apartment from east at south

    Mar 2, 2000 · Apt 1A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. east wall, north wall, south wall, west wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Mar 2, 2000 · Apt 1A

    Open — Defect letter issued
  • B

    D26-10.01, 10.05 adm code arrange and make self-closing the doors 4 sty pub hall bulkhead to roof.

    Oct 30, 1979

    Open — Not complied with
  • A

    D26-10.01 adm code properly repair with similar material the broken or defective clgs 4 sty pub hall at rear & bulkhead.

    Oct 30, 1979

    Open — Not complied with
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department clg pub halls all stys.

    Oct 30, 1979

    Open — Not complied with
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department clgs 2 sty east apt 2a kitchen & bathrm. , section '' ''

    Oct 30, 1979 · Apt 2A

    Open — Not complied with
  • C

    D26-10.01 adm code fire escape defective. replace with new the broken, defective and/or missing treads 4 to 5 story rear fire escape 2 3 & 5 tread from bottom.

    Sep 12, 1974

    Open — First no access to re- inspect violation
  • C

    D26-10.01 adm code fire escape defective. replace with new the broken, defective and/or missing tread 3rd to 4th story rear fire escape 3rd tread from bottom.

    Sep 12, 1974

    Open — First no access to re- inspect violation
  • B

    D26-12.03 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint rear fire escape all stories.

    Sep 12, 1974

    Open — First no access to re- inspect violation
  • C

    D26-10.01 adm code fire escape defective. replace with new the broken, defective and/or missing roted bolts to treads rear fire escape all storys.

    Sep 12, 1974

    Open — First no access to re- inspect violation

DOB building violations · 2

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active

ECB violations · 4

  • Class - 1

    Failure to comply w/an order of the commissioner. respondent failed tocomply w/stop work order. noted: at time of inspection no sidewalk shed & supported scaffold at site. equipment was removed while being on

    Mar 7, 2015 · Penalty $12,000

    Active
  • Class - 2

    Partial swo issued for supported scaffold pursuant 28-207.2 & posted on premises temp consr equipment on site-expired permit noted:@time of insp premits for supported scaffold& sidewalk shed @ exp#1 expired on

    Jul 31, 2014 · Penalty $4,000

    Active
  • Class - 2

    Failure to provide approved/accepted plans at job site at time of inspection. noted - upon inspection inspectior unable to view approved plans. remedy: provide approved/accepted plans.

    Nov 26, 2013 · Penalty $250

    Resolve
  • Class - 1

    Sec. 3314.5.5 all platforms shall be tied down, cleated or otherwise restrained by hooks or equivalent means to prevent dislodgement. noted- upon inspection single plank on scaffold not tied down in danger of

    Nov 26, 2013 · Penalty $1,600

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Aug 21, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 11, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Feb 11, 2025 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 1, 2024 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2024 · Apt 1B

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Nov 22, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 22, 2024 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Oct 27, 2024 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2023 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Jan 17, 2022 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Jan 17, 2022 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2022 · Apt 1B

    Close
  • Safety

    Smoke detector

    Nov 23, 2016 · Apt 3A

    Close
  • Safety

    Carbon monoxide detector

    Nov 23, 2016 · Apt 3A

    Close
  • Heating

    Heat related

    Apr 26, 2013 · Apt 1B

    Close
  • Heating

    Heat related

    Apr 3, 2013 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 4, 2013 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 3, 2013 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 2, 2013 · Apt 1B

    Close
  • Plumbing

    Water supply

    Aug 22, 2009 · Apt 1B

    Close
  • Plumbing

    Water supply

    Sep 24, 2006 · Apt 1B

    Close
  • Heating

    Heat related

    Sep 18, 2006 · Apt 1B

    Close
  • Heating

    Heat related

    May 20, 2006 · Apt 1B

    Close
  • Heating

    Heat related

    Dec 4, 2005 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Apr 13, 2005 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Apr 10, 2005 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Apr 10, 2005 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Apr 10, 2005 · Apt 1B

    Close
  • Nonconst

    Vermin

    Apr 10, 2005 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Apr 10, 2005 · Apt 1B

    Close
  • Heating

    Heat related

    Apr 10, 2005 · Apt 1B

    Close
  • Heating

    Heat related

    Apr 2, 2005 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 26, 2005 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 24, 2005 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 20, 2005 · Apt 1B

    Close
  • Nonconst

    Vermin

    Mar 19, 2005 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Mar 19, 2005 · Apt 1B

    Close
  • Plumbing

    Water supply

    Mar 19, 2005 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 19, 2005 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 3, 2005 · Apt 1B

    Close
  • Heating

    Heat related

    Sep 21, 2003 · Apt 1B

    Close
  • Heating

    Heat related

    Jul 26, 2003 · Apt 1B

    Close
  • Nonconst

    Vermin

    Jul 15, 2003 · Apt 1B

    Close
  • Nonconst

    Vermin

    Jul 15, 2003 · Apt 1B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C4)
Year built
1910
Floors
4
Residential units
8
Building area
7,728 ft²
Lot area
2,851 ft²
Zoning
R7A
Community board
111
Council district
8
Block / lot
1634 / 43
Assessed value
$430,200
Landmark / historic district
No

HPD registration #135671, last renewed Sep 8, 2025.

Questions about 166 East 107 Street

Who owns 166 East 107 Street?

The owner of record in NYC Department of City Planning PLUTO data is Ross And Ross LLC.

Does 166 East 107 Street have violations?

Yes. NYC HPD has recorded 36 housing violations at this property.

Is 166 East 107 Street rent stabilized?

NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 166 East 107 Street built?

City records list 1910 as the year it was built.

How many apartments are in 166 East 107 Street?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.