103 East 102 Street
Manhattan, NY 10029BBL 1-01630-0002Map
Owner of record: 103 East 102 LLC
103 East 102 Street is a walk-up apartment building built in 1910 in Manhattan, 10029. It has 10 residential units across 5 floors. The owner of record is 103 East 102 LLC. HPD has recorded 37 housing violations here, most recently on September 2, 2026. 13 of the 37 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2023.
- HPD violations
- 37
- DOB violations
- 6
- ECB violations
- 6
- HPD complaints
- 157
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall at basement
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Dec 18, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Dec 18, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall at lower level in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Sep 1, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall at lower level in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Sep 1, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door leading to public hall , 1st story
Sep 1, 2025
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall at lower level in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Sep 1, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall at lower level in the bathroom located at apt 1b, 1st story, 1st apartment from west at north original violation 18198657 issued 01-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Sep 1, 2025 · Apt 1B
Open — First no access to re- inspect violation
Show 27 more ↓
- CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at cellar
Mar 12, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock installed at vestibule door to public hall , 1st story
Aug 17, 2024
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
Aug 17, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south
Aug 17, 2024 · Apt 4A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south
Aug 17, 2024 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from east at south original violation 17202336 issued 17-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 17, 2024 · Apt 4A
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at bulkhead at public hall, 5th story
Oct 26, 2023
Closed — Violation dismissed - ANon-hazardous
Refit the door at bulkhead at public hall, 5th story
Oct 26, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at building front entrance door , 1st story
Oct 26, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at front building entrance door , 1st story
Jul 26, 2023
Closed — Violation closed - BHazardous
Refit front building entrance door , 1st story
Jul 26, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective entrance door to building , 1st story
Jul 11, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing electrical outlet covers/cap at west wall at public hall, 1st story
Aug 17, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 17, 2019
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective paving concrete floor at front areaway, 1st story
Jan 4, 2019
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at room lower level located at apt 1a, 1st story
Sep 6, 2017 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at room lower level located at apt 1a
Sep 6, 2017 · Apt 1A
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 6, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jan 31, 2015 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jan 31, 2015 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jan 31, 2015
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; at public hall, 1st story
Mar 4, 2014
Closed — Violation closed - BHazardous
Discontinue use of rooms for living purposes or sleeping in duplex apt in cellar in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 3, 2010 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3a, 3rd story
Feb 25, 2010 · Apt 3A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 3a, 3rd story
Feb 25, 2010 · Apt 3A
Closed — Violation closed
DOB building violations · 6
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 20, 1995
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 1
Failure to provide unobstructed exit passageway. atoi observed fridge,part buckets and cabinets blocking second means of egress at cellar level. also multiple objects of fire escape at exposure #1 at multiple f
Aug 31, 2026 · Penalty $2,500
Active - Non-hazardous
Failure to safeguard public & property affected by construction operations under application #10478394 exp.5/9/08 (alt 1).defect noted:1-evidence of construction material debris ie lumber,metal studs,dry walls
Jul 11, 2007
Resolve - Hazardous
Failure to maintain bldg:defects noted:(a)at 5th flr apt 5e an approx 4'x4' section of plaster ceiling collapsed crashing to the floor in a dangerous manner alo (b)public hall stairway between 4th and 5th flr
Dec 17, 2003
Resolve - Non-hazardous
Failure to maintain building.defect is broken & defective & missing sheet rock ceiling at 4th story apt.4e.remedy:replace missing ceiling at apt.4e bathroom.
Sep 11, 2000 · Penalty $180
Resolve - Hazardous
Hazardous required means of egress obstruted noted secondary means of egress obstructed by metal gate installed at interior of adjoining building which is the 2nd means of egress-platform fire-escape
Apr 3, 1997
Resolve - Non-hazardous
Work without a permit defect alteration apt 3e & 3w without permit remedy stop work and obtain permit
Nov 27, 1989 · Penalty $1,000
Resolve
Complaints
- Electric
Lighting
Aug 30, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Aug 30, 2026 · Apt 4A
Close - Unsanitary condition
Pests
Aug 30, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Aug 30, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Aug 30, 2026 · Apt 4A
Close - Heat/hot water
Entire building
May 27, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 27, 2026 · Apt 4A
Close - Heat/hot water
Entire building
May 26, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
Mar 26, 2026 · Apt 4B
Open - Door/window
Door
Mar 26, 2026 · Apt 4B
Open
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 5, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 4, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 4, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 29, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt BLDG
Close - Unsanitary condition
Sewage
Nov 3, 2025 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Aug 26, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Aug 26, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Aug 26, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 25, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Jun 22, 2025 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Feb 2, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 27, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Jan 27, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 20, 2025 · Apt BLDG
Close - Door/window
Door
Jan 14, 2025 · Apt BLDG
Close - Electric
No lighting
Jan 14, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 31, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2024 · Apt BLDG
Close - Door/window
Door
Aug 10, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 10, 2024 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Jul 20, 2024 · Apt BLDG
Close - Electric
Power outage
Oct 25, 2023 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Jun 4, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 10, 2021 · Apt BLDG
Close - Unsanitary condition
Mold
May 10, 2021 · Apt 1A
Close - Unsanitary condition
Sewage
Apr 15, 2021 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 5
- Residential units
- 10
- Building area
- 8,975 ft²
- Lot area
- 2,523 ft²
- Zoning
- R7-2
- Community board
- 111
- Council district
- 8
- Block / lot
- 1630 / 2
- Assessed value
- $1,015,200
- Landmark / historic district
- No
HPD registration #122892, last renewed Sep 9, 2025.
Questions about 103 East 102 Street
Who owns 103 East 102 Street?
The owner of record in NYC Department of City Planning PLUTO data is 103 East 102 LLC.
Does 103 East 102 Street have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 103 East 102 Street rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2023 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 103 East 102 Street built?
City records list 1910 as the year it was built.
How many apartments are in 103 East 102 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.