329 East 94 Street
Manhattan, NY 10128BBL 1-01557-0017Map
Owner of record: Faith Ministries INC
329 East 94 Street is a walk-up apartment building built in 1920 in Manhattan, 10128. It has 37 residential units across 6 floors. The owner of record is Faith Ministries INC. HPD has recorded 160 housing violations here, most recently on August 23, 2026. 50 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 160
- DOB violations
- 23
- ECB violations
- 17
- HPD complaints
- 127
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 160
- BHazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical wiring at ceiling at public hall, 6th story
Aug 23, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Aug 23, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Aug 23, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 1st story
Aug 22, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 1st story
Aug 22, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door to exit , 1st story
Aug 22, 2026
Open — Nov sent out - BHazardous
Provide acceptable mechanical heavy duty locking device and latch set at vestibule door , 1st story
Aug 22, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6, 2nd story, 2nd apartment from north at east
Mar 17, 2025 · Apt 6
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded material at ceiling. at public hall, 1st story
Feb 19, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Feb 19, 2025
Open — Nov sent out - BHazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestbule door. at public hall, 1st story
Feb 19, 2025
Open — Nov sent out - BHazardous
Provide security in event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestbule door. at public hall, 1st story
Feb 19, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded material at ceiling at public hall, 3rd story
Feb 19, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Feb 19, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded material at ceiling at public hall, 6th story
Feb 19, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Feb 19, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges installed at bulkhead door, roof
Feb 19, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 12, 3rd story, 2nd apartment from north at east
Nov 20, 2023 · Apt 12
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 20, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (hinges) in the entrance located at apt 12, 3rd story, 2nd apartment from north at east
Nov 20, 2023 · Apt 12
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 12, 3rd story, 2nd apartment from north at east
Nov 20, 2023 · Apt 12
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Open — Nov sent out - BHazardous
Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles. in the kitchen located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls in the kitchen located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint metal in accordance with dept. regulation wall cabenet at north wall in the kitchen located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser in the kitchen located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Nov sent out - BHazardous
Replace with new the missing eschutchen plate heat riser at ceiling. in the kitchen located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Nov sent out - BHazardous
Abate the nuisance consisting of excessive storage of material household item, boxes and books. in the entire apartment located at apt 28, 6th story, 1st apartment from south at west
May 29, 2019 · Apt 28
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the vestibule door leading in to the building at public hall. , 1st story
May 29, 2019
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door. , 1st story
May 29, 2019
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story
Mar 4, 2019
Open — Nov sent out - BHazardous
Replace with new the broken or defective marble landing 1st up from bottom at public hall stairs, 1st story
Mar 4, 2019
Open — Nov sent out - ANon-hazardous
Refit fire rated door in the entrance located at apt 2, 1st story, 1st apartment from west at north
Mar 4, 2019 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door ... in the entrance located at apt 2, 1st story, 1st apartment from west at north
Mar 4, 2019 · Apt 2
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 2, 1st story, 1st apartment from west at north
Mar 4, 2019 · Apt 2
Open — Nov sent out
DOB building violations · 23
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 14, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 14, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 14, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active
Show 13 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 20, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 27, 1992
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jul 27, 1992
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 19, 1989
Dob violation - dismissed
ECB violations · 17
- Class - 1
Bc907.28/failure to provide the required fire alarm system for transient use at apts#8 & 9.previous violation#35444051p/rem;discontinue illegal occupancy.
Sep 9, 2019 · Penalty $6,250
Resolve - Class - 1
Permanent dwelling used/converted for other than permanent residentialpurposes.co#47443 inidcates premises to be legally approved as a clas s "a" multiple dwelling.now apts #8 &9 used converted to transient not
Sep 9, 2019 · Penalty $26,000
Resolve - Class - 1
Failrue to provide a system of automatic sprinklers where required perbc903.2 and 27-954 for transient use at apts #8 & 9;previous violatio n #35444052r; rem:discontinue illegal occupancy.
Sep 9, 2019 · Penalty $3,125
Resolve - Class - 1
Failur to provide th required number of means of egress for every floor per bc1018.1(20080;bc1021.1(2014)and 27-366 for transient use at apts# 8 & 9.previous violation #35444053z.rem:discontinue violation#35444
Sep 9, 2019 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.failure to provide number of required means of egres for every floor per bc1018.1;1021.1 and 27-366 for transient use for apartment#10;rem:discontinue illeg
Sep 7, 2019 · Penalty $2,500
Resolve - Class - 1
Bc907.2.8/failure to provide a fire alarm system for a transient use ofor apartment #10.rem:discontinue illegal use.
Sep 7, 2019 · Penalty $2,500
Resolve - Class - 1
Faiure to maintain building in code compliant manner lack of automatic sprinkler system where is required as per bc903.2 and ac27-954 for a transient use for apartment #10.rem:discontinue illegal use.
Sep 7, 2019 · Penalty $1,250
Resolve - Class - 2
Permanent dwelling used converted for other than permanent residentialpurposes.department of buildings certificate of occupancy no#47443 indicates premises to be legally a class "a"multiple dwelling now apartme
Sep 7, 2019 · Penalty $1,250
Resolve - Class - 1
Sec. 907.2.8 failure to provide fire alarm system for transient use. remedy: discontinue illegal occupancy.
Oct 16, 2014
Resolve - Class - 2
Permanent dwelling used converted for other than permanent residentialpurposes. c/o #474443 indicates that bldg to be legally occupied as a class'a' multiple dwelling. now apt #16 illegally used/converted as a
Oct 16, 2014
Resolve
Show 7 more ↓
- Class - 1
Failure to maintain bldg in code compliant manner. lack of a system ofautomatic sprinklers where required per bc903.2 & 27-954 for transientuse. remedy: discontinue illegal occupancy.
Oct 16, 2014
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. failure to provide # of required means of egress for every floor per bc 1018.1;27-366 pertransient use. remedy: discontinue illegal occuapncy.
Oct 16, 2014
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #35029863m issued on 8.22.13 pursuant to 28-204.4 & 1rcny 102-01.rear exterior brick wall has several step,vertical cracksthroughout
Feb 8, 2014 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. defect noted: at rearexterior brick wall has several step,vertical cracks throughout also spalling bricks & cracked bricks throughout. rear wall is exposure 3.
Aug 22, 2013 · Penalty $500
Active - Non-hazardous
B4a,50,50a,b,c,d.50-missing backflow preventor & check valve.50a-missing label on receiver valve.50b-interlock switch not working on fresh air intake.50c-blow down piping in relief valve has threads on end.50d
Apr 4, 2007 · Penalty $2,500
Active - Non-hazardous
Work without a permit. work noted. extensive renovations to the folling apartments. building number 329. apartments 8,5 and ten. third floorbuliding building number 335, apartments 21,16 fourth floor 24,26,25
Oct 6, 1998 · Penalty $250
Active - Non-hazardous
Failure to maintain fire damage to apts 11, 22,28,29 s/w portion of bldg. floor beams roof beams are burned broken & defective also walls in apt 16,22 are burner broken & defective. remedy file plan & obtain
Feb 3, 1989
Resolve
Complaints
- Unsanitary condition
Pests
Aug 1, 2026 · Apt 30
Close - Unsanitary condition
Mold
Aug 1, 2026 · Apt 30
Close - General
Bell/buzzer/intercom
Aug 1, 2026 · Apt 30
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 16, 2025 · Apt 19
Close - Heat/hot water
Entire building
Feb 18, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 18, 2025 · Apt 11
Close - Heat/hot water
Entire building
Feb 13, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 9
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 9
Close - Unsanitary condition
Pests
Aug 3, 2024 · Apt 2
Close - Heat/hot water
Entire building
Nov 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2023 · Apt BLDG
Close - General
Bell/buzzer/intercom
Dec 10, 2022 · Apt 29
Close - Appliance
Electric/gas range
Dec 10, 2022 · Apt 29
Close - Door/window
Door frame
Dec 10, 2022 · Apt 29
Close - Door/window
Window frame
Dec 10, 2022 · Apt 29
Close - Unsanitary condition
Mold
Dec 10, 2022 · Apt 29
Close - Unsanitary condition
Pests
Dec 10, 2022 · Apt 29
Close - General
Cabinet
May 22, 2019 · Apt 28
Close - Unsanitary condition
Pests
May 22, 2019 · Apt 28
Close - Unsanitary condition
Pests
May 22, 2019 · Apt 28
Close - Paint/plaster
Wall
May 22, 2019 · Apt 28
Close - Flooring/stairs
Floor
May 22, 2019 · Apt 28
Close - Plumbing
Basin/sink
May 22, 2019 · Apt 28
Close - Door/window
Door
Sep 11, 2018 · Apt 14
Close - Unsanitary condition
Mold
Sep 11, 2018 · Apt 14
Close - Heat/hot water
Entire building
Feb 6, 2018 · Apt 15
Close - Unsanitary condition
Pests
Oct 5, 2017 · Apt 8
Close - Unsanitary condition
Pests
Oct 5, 2017 · Apt 8
Close - Unsanitary condition
Pests
Aug 21, 2017 · Apt 19
Close - Heat/hot water
Entire building
Jan 15, 2016 · Apt BLDG
Close - Electric
Lighting
Jan 7, 2016 · Apt 2
Close - Electric
Power outage
Jan 7, 2016 · Apt 2
Close - Door/window
Door
Jan 3, 2016 · Apt 2
Close - Door/window
Window frame
Oct 27, 2015 · Apt 28
Close - Paint/plaster
Ceiling
Oct 27, 2015 · Apt 28
Close - Appliance
Electric/gas range
Oct 27, 2015 · Apt 28
Close - Flooring/stairs
Floor
Oct 27, 2015 · Apt 28
Close - Electric
Wiring
Apr 21, 2015 · Apt 9
Close - Electric
Wiring
Apr 21, 2015 · Apt 9
Close - Heat/hot water
Apartment only
Mar 23, 2015 · Apt 2
Close - Heat/hot water
Entire building
Feb 25, 2015 · Apt 12
Close - Heat/hot water
Apartment only
Feb 16, 2015 · Apt 2
Close - Heat/hot water
Entire building
Feb 16, 2015 · Apt 4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 6
- Residential units
- 37
- Building area
- 21,310 ft²
- Lot area
- 5,033 ft²
- Zoning
- C8-4
- Community board
- 108
- Council district
- 5
- Block / lot
- 1557 / 17
- Assessed value
- $1,959,300
- Landmark / historic district
- No
HPD registration #120469, last renewed Sep 24, 2019.
Questions about 329 East 94 Street
Who owns 329 East 94 Street?
The owner of record in NYC Department of City Planning PLUTO data is Faith Ministries INC.
Does 329 East 94 Street have violations?
Yes. NYC HPD has recorded 160 housing violations at this property.
Is 329 East 94 Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 8% of its 37 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 329 East 94 Street built?
City records list 1920 as the year it was built.
How many apartments are in 329 East 94 Street?
It has 37 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.